Smart solutions for comfort and safety UL/CSA approval of small motors.

Slides:



Advertisements
Similar presentations
OSHA Office of Training and Education
Advertisements

Medical Device Software Development
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Copyright © 2012, Big I Advantage®, Inc., and Swiss Re Corporate Solutions. All rights reserved. (Ed. 08/12 -1) E&O RISK MANAGEMENT: MEETING THE CHALLENGE.
Compliance With Resolution 0859 – Safety of Persons Underwriters Laboratories Inc. March 2008 Refrigerators, Freezers and Combination of Refrigerator-Freezers.
Harnessing the power of the sun: SHAMCI (Solar Heating Arab Mark and Certification Initiative) Presentation by: Rim Boukhchina Technical expert - RCREEE.
Temporary storage Sven Hagemann GRS. Types of temporary storage 1.Storage of commodity mercury  Dealer, wholesaler, governmental stocks 2.Storage of.
Workplace Safety and Insurance Board | Commission de la sécurité professionnelle et de l’assurance contre les accidents du travail 2014 Safety Groups Advantage.
Materials. Introduction Inventory in a company includes stock of raw materials, work-in-progress, finished & semi-finished products, spare components.
New 2014 CCC Regulation China Compulsory Certification G&M Compliance, Inc. November 25, 2014.
THIRD-PARTY CERTIFICATION IN THE UNITED STATES Presented by: Joan Sterling.
“Consorzio RES and IT Security Certifications” 1/22.
Permit to Work Procedure Document Number: KOC.SA.004
World Health Organization
Business Owners and Managers and the Fire Code
Chapter One Electrical Design and Component Basics.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Office and Home Electrical Safety
Ch 15 Consumers in the Global Economy
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Electrical Installation 2
Quality System & Performance SUNGSHIN APR. 10, 2004.
Writing Persuasive Proposals C H A P T E R 16. What Are the Types of Proposals? How Do You Prepare to Write a Proposal? How Do You Structure a Proposal?
Means of Egress and Fire Protection
Federal Aviation Administration RTCA Update 0 RTCA Update Federal Aviation Administration International Aircraft Materials Fire Test Working Group Bremen,
Sandwich Panels: UK Insurance industry attitudes and guidance on IPN core panels. Mark Harris -Divisional Building Technology Director. Nordbygg – March.
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Supplier Qualification.
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
Important informations
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
Chapter 7 Safety. Introduction This chapter covers the following topics: Dangers of electricity Preventive measures Electrostatic discharge Safety practices.
Objective 1 Define Opportunity Cost and Use it to Analyze the Income Effects of a Given Alternative
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
What Documentation Needs to be Submitted With an Approval Application?
Aviation Maintenance Management
Building Marketing Databases. In-House or Outside Bureau? Outside Bureau: Outside agency that specializes in designing and developing customized databases.
Foreign Supplier Verification Programs Supplemental Proposal 1.
T.E.A.M. PROGRAM ©Copyright 2012 DESCO INDUSTRIES INC. Total ESD Awareness and Management.
Means of Egress and Fire Protection. Introduction Fires and explosions kill more than 200 and injure more than 5,000 workers each year There is a long.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
Working for a Safer World Counterfeit Certification Marks - A New Low for Criminals Brian Monks Vice President Anti-Counterfeiting Operations.
Exit Routes and Fire Protection
Federal Aviation Administration RTCA Update 0 RTCA Update Federal Aviation Administration International Aircraft Materials Fire Test Working Group Savannah,
USDA Public Meeting; Control of E. coli O157:H7
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
EXTENSION CORD SAFETY Bureau of Workers Comp PA Training for Health & Safety (PATHS) 1PPT
Recognizing and correcting hazards
Quality Control significance in pharmaceutical industry
All About Workplace Electrical Safety
MONTENEGRO Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 1 – Free movement of goods Bilateral screening:
 Andersen Consulting 2000 MM03 - Master Data in Purchasing & Contract November, 2000.
Conformity assessment – some examples: cement, high pressure laminates, ceramic tiles.
Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection.
Medical Device Software Development
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
Global Production, Outsourcing, and Logistics
MM03 - Master Data in Purchasing & Contract
GMP Inspection Process
Fabric Air Dispersion Systems
Quality UL Cable Maker WCH Cable is the leading manufacturer of UL approved cables & wires in China. Approval AWM materials cover.
GMP Inspection Process
SELECTIVE FORESEE THE FUTURE WITH.
New UL Cable ties for electrical installations
Hundreds of people die due to explosions every year!
Title First name, last name, university, city, country
Presentation transcript:

Smart solutions for comfort and safety UL/CSA approval of small motors

Smart solutions for comfort and safety 2 Introduction UL / CSA approval of Saia- Burgess motors UL = Underwriters Laboratories Inc., US: an independent, not-for-profit product-safety testing and certification organization, first founded in 1894, second foundation in 1903, 123 UL centres worldwide, 62 laboratories and certification facilities, more than companies use UL marks, Historical background: initiative from insurance companies Motivation: avoid fire (e.g. many houses made of wood) and other hazards More than 800 valid UL standards on safety developed 1,291 UL and 376 CSA standards for different products Approbation of products linked with factory inspection (each quarter or half a year)

Smart solutions for comfort and safety 3 UL 1004 / CSA100Electric Motors Creepage distance and clearances Insulation system power supply means box and/ or plastic material UL 863Time- Indicating and Recording Appliances previous applied standard – do not use for new motors UL 1446Electrical Insulation Systems (EIS) Thermal aging tests, dielecric strength,... Very extensive for untested materials – 12 to 18 month UL 2111 / CSA 77Thermal Overload Protection of Motors Impedance protected or Thermally protected motors UL 94Tests for Flammability of Plastic Materials Preselection testing Flammability classification (HB / V-2 / V-1 / V-0 / 5V) Standards UL / CSA approval of Saia- Burgess motors

Smart solutions for comfort and safety 4 UL Recognized Component Mark - specifically used on components that are part of a larger product or system - mark for insulation system inside motor - mark for our motor according at least one UL standard - for combined compliance to the Canadian and US Standard UL Listed Mark - mark for representative samples on end-products (customer) Marks UL / CSA approval of Saia- Burgess motors

Smart solutions for comfort and safety 5 Creation of a new Electrical Insulation System (EIS) - e.g. UL approval of existing motors - Long Term Aging Test - handling time 12 to 18 month - preferably to avoid Adaptation of an existing EIS - Selection of pre- certificated EIS from different plastic suppliers - e.g. DuPont offers actual 455 EIS under File E use of these EIS is free of charge after authorisation - preferred for new developing motors Admission of “Minor Components” in existing EIS - upgrading of existing EIS only for Minor Components (lead wire, tape, motorplate...) - shortened “Sealed Tube Test” - handling time 6 weeks Procedure for obtaining UL approval UL / CSA approval of Saia- Burgess motors

Smart solutions for comfort and safety 6 Yellow Card UL / CSA approval of Saia- Burgess motors

Smart solutions for comfort and safety 7 Basis of calculation is not clear and offers increase year per year remarkably! strong differences depending on approach small differences according to country of application (Germany vs. US) Long duration for applications and difficult work with UL no clear definition of ways towards approbation (e.g. mix of insulation systems for UC) long time (e.g. 9 month for complete process between offer and end of project) result is not only based on standards (“It is not mathematics, it is UL.”) For improvement of work we invested in qualification of engineers and decided to work only direct with UL Germany for better understanding and cooperation. after we gained experience with two direct applications in US Conclusions UL / CSA approval of Saia- Burgess motors

Smart solutions for comfort and safety 8 Our preferred way: give our customer data of used materials (if not special know-how) for his own certification Advantage: no additional costs! Yellow card + minimum thickness This way was used successfully with motors and solenoids New motors >40 mm with UL 1004 / CSA 100 – Electric Motors If there are customer requests – application for UL1004 Motor design takes care of current UL 1004 requirements Motors <40 mm may not, <36 mm can not fulfil large UL clearance and creepage distances New designs usually use “free” UL - Insulation Systems from DuPont Is CSA 100 really necessary, it seems to double costs ? Avoid special standards, e.g. UL 2111 / CSA 77 or include fully in calculation of project Future: we discuss to establish a own insulation system (for Saia-Burgess new products or for whole Johnson) Summary UL / CSA approval of Saia- Burgess motors