An-Najah National University Graduating project II Delay in construction projects.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ABC Change Orders College of Environmental Design
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Chapter 3 Project Initiation
Contractor Safety Management
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Washington Metropolitan Area District Office SBA.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
CEM 520: Construction Contracting and Administration 03 June 2007
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
Purchasing. Objective The basic objective of the purchasing function is to ensure continuity of supply of raw materials, sub-contracted items and spare.
Construction Contracts and Project Delivery Methods
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
ACCOUNTING INFORMATION SYSTEMS
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
SacProNet An Overview of Project Management Techniques.
King Fahd University of Petroleum & Minerals
 The assigned project is student’s schools which located in YABED; it was designed by Tubealh offices of the engineering design.  The contractor by.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
The Writing Process.
Systems Analysis and Design
Under supervision of: Eng. Reema Nassar
ENGINEERING MANAGEMENT (GE 404)
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
How to perform Time Impact Analysis / Window Analysis in Primavera P6
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Project Integration Management
‘ Causes of Delay During Construction Phase at Palestine ’
Directed Change Constructive Change
Construction Management Services April 16, 2018
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

An-Najah National University Graduating project II Delay in construction projects

Outline :  Definition of delay.  Case study.  Literature review.  Methodology.  Analysis.  Discussion and conclusions.  Recommendations.

Definition of delay : Delay means: an event or a condition that results in finishing the project later than stipulated in the contract. The delay is one of the main problems that face the construction projects so it has been chosen.

Case study : Alquds open university building was taken as a case study about delay. BuildingAdministrationTheater Area (m square)

Literature review:  A number of studies have been carried out to determine the causes of delay in construction projects.  These studies helps to classify delay, and to know the main reason of delay.

Literature review: Delay can be classified to:  Excusable delay.  Non excusable delay.  Concurrent delays.

Literature review:  Previous studies have had big impact on guiding the researcher how to work on the study, it has benefited from the methodology used in these studies to determine the methodology to be used in this research

Methodology : Schedule analysis is used in order to identify delays and to measure the net impacts of delays on a project. Basic tools which are used in the schedule analysis are known as bar chart schedules and daily reports,also interviews with contractor.

Methodology :

 All the previous steps in the methodology was done except the correspondences because the contractor was not able to provide the corresponds document,instead of that in the interview with the contractor a documented paper explains the reasons of delay was provided

Analysis :  By comparing the baseline schedule with updated schedule following results was conduct:  Delay in foundation excavation due to errors in estimating bearing capacity (waiting of new design of foundation).

Analysis :  There was delay in theater work because there was need for anew design of benches,according to client request(change order).  There were a change in form work in the theater specifications, from wood to steel due to high height of theater that extent to 10m height

Analysis: There was delay in stone building activity (the occupation authorities was closed the stone quarry in Jammai'n area). Also there was lack in stone building labors.

Analysis : T he table below shows the reasons behind delay with its period and percentage of each type : Reason of delayPeriodPercentage Resources4046 implementing Redesign3742.5

Conclusions and Discussions: there are two main types of delay :  Excusable delay : this is a delay that entitles the contractor to additional time for completing the contract work,excusable delay usually come from reasons beyond the contractors control.

Conclusions and Discussions:  Non excusable delay : this type of delay that doesn’t entitles the contractor to time extension and compensation,such as lack of labors and equipments

Recommendations : Contractors should consider the following factors:  Should assign agreements with materials supplier to get the material on time, also contractor must find an alternative suppliers of materials, to call them when the supplying materials stop (backup plan).  Contractor should provide enough number of resources before start of the activity,also contractor must make good resource leveling during the construction process.

Recommendations :  Contractor can provide some specimen’s from many sources in the first stage of project to consultant to get approval on them.  Site management and supervision: administrative and technical staff should be assigned as soon as project is awarded to make arrangements to achieve completion within specified time with the required quality, and estimated cost.

Recommendations : Consultants should consider the following points:  Reviewing and approving the design submittals prior to construction phase to eliminate any errors in the design.  Consultant should use the results of laboratories tests such as soil test and doesn’t depend on practical experience or expert judgment.

Recommendations : Owner should consider the following points :  Change orders should minimize as much as possible to reduce delay in constructions projects.  Check for resources and capabilities,before awarding the contract to the lowest bidder.