Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada 24-25 May 2004 DLR Report Martin Pilgram,

Slides:



Advertisements
Similar presentations
CCSDS Navigation Working Group David Berry 10/01/2007.
Advertisements

Folie 1 Service Oriented Architecture - Prototyping study - DLR/GSOC Author: S.Gully.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CCSDS Spacecraft Monitor & Control Working Group (SM&C WG) SpaceOps 2004.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
System Engineering Area SANA BoF Kick-Off 12 May 2004 Peter Shames NASA/JPL.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
NASA HQ Office of Space Flight NASA DATA SYSTEMS STANDARDS PROGRAM ( NDSSP ) NASA’s CCSDS REORGANIZATION PROPOSAL Page: AZD - 1 September 21, 2002 NASA.
Dokumentname > 23rd October 2008 Folie 1 > Vortrag > Autor DLR - CMC Report October 2008 Martin Pilgram, DLR-GSOC October, at DIN, Berlin, Germany.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
CCSDS Meeting CNES Report, 2/11/2004 CNES 1 CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
CCSDS Navigation Working Group David Berry 04/20/2009.
CCSDS Security Working Group Program Space IT Security Standards Products Howard Weiss SPARTA, Inc. (a Parsons Company)
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Navigation WG Report D. Berry NASA J. Fertig ESA.
CCSDS Reference Architecture Notes from SAWG discussion & from SEA Report to CESG/CMC 12 & 17 Nov 2014.
November SECURITY WORKING GROUP REPORT November 2004.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
CCSDS Navigation Working Group David Berry 01/16/2007.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
CCSDS Navigation Working Group David Berry 10/13/2008.
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23 rd March 2015 Sam Cooper M&C service prototyping status.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Spacecraft Monitor & Control Working Group (SM&C WG) CCSDS SM&C WG.
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
ESA UNCLASSIFIED – For Official Use Cleveland, OH, USA 04-08Apr16 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Opening Plenary.
CNES: CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity May-October 2004 Toulouse meeting.
The CCSDS Security WG is chartered to:
ESAW Workshop 2009 Martin Götzelmann, VEGA Yves Doat, ESA/ESOC
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
CCSDS Navigation Working Group
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
CCSDS Navigation Working Group
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
JAXA CCSDS Secretary Office
Presentation transcript:

Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram, DLR

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ DLR participation DLR-GSOC continued its work within the reporting period in the following working areas: RF & Modulation (SLS Area) Navigation (MOIMS Area) Data Transfer Service (CSS Area) Service Management (CSS Area) Spacecraft Monitor and Control (MOIMS Area) Security (System Engineering Area)

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (1) RF & Modulation M. Häusler will replace W. Schwarz. - H. Hofmann represents DLR in the Spacecraft M&C WG starting with Montreal meeting - Montreal Meeting was reported as very informative and constructive for a „Beginner“ - DLR supports the shifting of the delivery of the WB 1.0 to the next meeting for improving the content of this book. Spacecraft Monitor and Control Discussion in DLR to support the Mission Planning activities within this WG. Today the priority is very low (6 and 7 out of 10).

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (2) Navigation R. Kiehling participated in the current WG meeting. DLR appreciates the progress of the WG: Significant progress was done on: - ODM (Orbit Data Message), -TDM (Tracking Data Message), and -ADM (Attitude Data Message) recommendations. ODM prepared to go blue. XML will be added end of the year. Prototype software implemented at DLR/GSOC for OPM generation. Test with ESOC completed within May, DLR/GSOC will contribute to improve the present versions, especially of the TDM. After completion of the ODM, TDM will be the next. This corresponds with DLR interests. DLR/GSOC will organize an intermediate meeting to work on the TDM during the Flight Dynamics Conference in Munich (mid October).

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (3) Security M.Pilgram participates the first day in the WG. The following items are discussed: - Threat document: Consensus on updating the classes. -Architecture document based on open standards, designed to be expandable and allows for fault management -CCSDS standards for areas as encryption, authentication, integrity and key management discussion started -Creation of an outline of a security section for CCSDS documents Question on how to interchange on sec aspects with other WGs -Time overlap -Limited resources

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (4) Security (2) The current WG meeting was a step in the right direction. This includes the creation of CCSDS security standards as well as delivering support on security for other WGs. At the end this should help to overcome the high borders on security, which all the time occurs on setting up cross support between the agencies. DLR will support this work on security issues within the given WG. Unfortunately the contribution of resources by agencies outside Europe during the meeting was very limited. Hopefully this could be improved in the future.

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (5) Transfer Data Services (1) M. Pilgram was the DLR-GSOC representative in this WG. Update of the Books according the following reasons: - clarifications necessary brought up by the ongoing implementation in ESA - updating to the new TM/TC terminology -check of ASN.1 delivered with the books - consolidation of the books (keep the books as close as possible) - RAF Pink Book P1.1 (DLR) - FCLUT Pink Book P1.1 (DLR) - RCF Red Book R-2 (DLR) - FSP Red Book R-2 (ESA) -ROCF Red Book R-1 (ESA)

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ Working Groups (6) Transfer Data Services (2) DLR also supports the decisions in the CSS area: But: be aware of overlaps between the Service taken Management WG with Spacecraft M&C WG. - General Cross Support Service as toolbox - First items of the Toolbox are RAD and Tracking - No new WG, update the Transfer Data Service WG - Stop the development of a combined Return Book -API documentation - Standardize Proxy definition - Publish the ESA SLE API books as Best Practices -Pink Sheets to the reference model submitted to the secretary -Publishing of Service Management Red Books on the next meeting

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ GSOC CCSDS related items Missions at DLR: The following table shall give a brief overview on the present and planned missions: ProjectLaunch DateUplink ComplianceDownlink ComplianceData Archive CHAMPin orbitfull compliant archiving of TF‘s GRACEin orbitfull compliant archiving of TF‘s BIRDin orbitno CCSDS standardfull compliantarchiving of TF‘s EUTELSAT W-series and HOT- Bird in orbitfull compliantpartial compliantno archiving of TF’s TERRASAR-X2006full compliant t.b.d. SARLUPE full compliant t.b.d.

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ GSOC SLE Implementation The current implementation of SLE – Services is done in GSOC for the upcoming missions TerraSAR-X: - SLE in the Central Checkout System - SLE based Ground Network SARLupe -SLE I/F to EGSE -SLE User I/F to the MCS -SLE based Ground Network and in the area of the ESOC/GSOC Cooperation. SLE service user and provider tests for RAF, RCF and CLTU will start this summer. Integral via Weilheim and a DLR satellite via Madrid.

CCSDS Management Council, Canadian Space Agency, St-Hubert, Quebec, Canada, May 2004, DLR Report M.Pilgram, DLR - RB/OD 05/ General issues - The level of the documentation and the actualization of the content is very much depending on the WGs. DLR proposes to generate procedures how to use the DocuShare by the WGs. - Hopefully the support of the secretary will come up again after the change of the supporting contractor. It would be helpful fort he future to be informed about organizational problems as well. - Till today DLR didn’t see a big change of the CCSDS work after the change of the structure. The old problems on getting enough resources for the defined work are still ongoing. - As DLR is involved in work items which soon be finished there is an interest to know, how these items are handled after closing down a WG.