Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.

Slides:



Advertisements
Similar presentations
1 | Energy Efficiency and Renewable Energyeere.energy.gov Alternative Finance & Mitigating Deferred Maintenance May 21, 2013 Kurmit Rockwell PE, CEM, LEED.
Advertisements

FINANCIAL ESPC ROUND TABLE DOE-FEMP ESPCs Doug Culbreth FEMP Federal Financing Specialist.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
FEMP Biomass Super ESPC Program Presentation to the Renewable Energy Working Group September 10, 2002 Christopher Abbuehl US DOE – PRO.
Need for a Professional Approach in Building Energy Audit Pradeep Kumar Sr. Technical Specialist.
Genesis Solar Module Brochure ™
FEMP Assistance Meeting Forest Service Needs Energy Savings Performance Contracting ESPC.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,
GWAC Ordering Procedures Overview
Phoenix Convention Center Phoenix, Arizona Introduction to UESC Webinar Project Financing UESC Basics: Project Financing Through your Utility Julia Kelley.
Aerospace Ground Equipment (AGE) Support Services Pre-Proposal Conference/ Site Visit Kari M. Alvarado Contract Specialist NASA-DFRC November 8, 2006 Dryden.
Phoenix Convention Center Phoenix, Arizona General Services Administration Areawide Contracts for Use With Regulated Utility Companies Institutional ChangeDoing.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
ESPC ENABLE Program Overview
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Overview of US Army Corps of Engineers (USACE) ESPC & UESC Programs
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona FEMP’s New ESCO Selector Tool Project Financing Tools for a Successful Project Scott Wolf Oak Ridge National.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
Phoenix Convention Center Phoenix, Arizona Legislative Drivers, Compliance, and FEMP Services Agency Energy Manager Hayes Jones FEMP August 11, 2015.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Advanced Metering Implementation in ESPCs Drivers 1) Legislation Mandate – No $ 2)M&V Requirements in ESPCs 3)Utilities Cost allocation (e.g. tenants)
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
Phoenix Convention Center Phoenix, Arizona GSA’s Actions under the PPCC GSA’s Pipeline Session 1, Track 5Meeting the PPCC Sharon Conger Public Building.
Phoenix Convention Center Phoenix, Arizona Business as Usual: Cost-Saving Activities that Green the Federal Government Solution ShowcaseGreening the Federal.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Track 7, Session 7 Overview Building Performance Data Center Energy.
M&V Plan Development Working Group Update M&V Summit November 2003 Lia Webster, Chair.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
Financial ESPC Training Work Session. Proprietary Information Of Energy 2013 Assistance from DOE National Laboratories FEMP works with DOE National Laboratories.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
2 Breakout Session # 506 Daryl Berg, DOE Contacting Officer Julia Trautman, DOE Contract Specialist Date April 15, 2008 Time3:20 – 4:20 p.m. Energy Savings.
Phoenix Convention Center Phoenix, Arizona Michael Bartlett, PMP, CEM, CBEP, LEED AP ABM Government Services, LLC August 13, 2015 Solutions Showcase –
Annual Reporting Working Group Update Lia Webster, Nexant New Orleans M&V Summit May 2003.
M&V Reporting Lia Webster, Nexant. M&V Summit - Nov 2002 Current M&V Reporting - IDIQ Requirements (C.4.2): Post-Install M&V report –Contents to be specified.
Phoenix Convention Center Phoenix, Arizona Greening the Federal Government Track 1: Solution Showcase August 11, 2015.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Chapter 6: Writing the Front Matter and Executive Summary.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
Overview Federal Project Financing Vehicles by David McAndrew Federal Energy Management Program.
Phoenix Convention Center Phoenix, Arizona Case Studies of Institutional Change at the Campus Level Track 9: Institutional Change August 13, 2015.
Buying Energy Efficient Products: Policy Requirements, Purchasing Tools, and Agency Experiences Christopher Payne Lawrence Berkeley National Laboratory.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Federal Procurement of Energy-Efficient Products: Policy Requirements & Purchasing Tools Christopher Payne Lawrence Berkeley National Laboratory June 17,
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
Fort Stanwix National Monument Energy Audit Contract
Energy Savings Performance Contracts & Energy Service Companies
Gary Nower – Wilfrid Laurier University Edward Ng – EY
Definition of ESPC ESPC is a no-upfront-cost contracting method. The contractor incurs the cost of implementing energy conservation measures (ECM) and.
Developing and Issuing the RFP
Lockheed Martin Canada’s SMB Mentoring Program
Omnibus IV Contracting Strategy Michael D’Alessandro
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC Wayne Latham Energy Efficiency and Renewable Energy August 11, 2015

Energy Exchange : Federal Sustainability for the Next Decade  Current ESPCs  The ESPC Goal  ESPC Project Assistance  The Notice - NOO  Selection Process  Preliminary Assessment  The Investment Grade Audit  The Proposal and Proposal Review for Task Orders  Measurement & Verification  Energy Conservation Measures  Additional Information 2 Overview of Energy Saving Performance Contracts - ESPC

Energy Exchange : Federal Sustainability for the Next Decade Awarded in 2008 Sixteen Contractors – AKA – ESCOs Listed at: Available for use by all Federal Agencies Supports the Presidential Performance Contracting Challenge (PPCC) To learn about training and project assistance see: 3 The Current DOE Contract

Energy Exchange : Federal Sustainability for the Next Decade These contracts are intended to promote the use of renewable energy technologies, acquire energy and water conservation services, reduce energy and water consumption and/or associated utility costs, and may reduce energy and water-related operations and maintenance costs. The contractor shall be responsible for providing all labor, material, and capital to install energy and water conservation projects, renewable energy projects and provide operations and maintenance as specified in each Task Order. The cost of an energy savings performance contract must be covered by the energy, water, and related cost savings incurred at the Federal facility. The Task Order project cost savings must be verified and documented annually. 4 The ESPC Goal

Energy Exchange : Federal Sustainability for the Next Decade Federal project executives (FPEs) help agencies launch energy savings performance contract (ESPC) projects. FPEs support agencies by helping with acquisition planning tasks Tom Hattery – Northeast Region Doug Culbreth – Southeast Region Scott Wolf – Western Region A DOE-approved project facilitator (PF) is required for the utilization of this master IDIQ contract. A PF must be selected prior to the agency issuing a notice of anticipated requirements. The PF requirement shall not be waived by the agency. DOE Contracting Wayne Latham – Contracting Officer David Halla – Contracting Officer The FEMP website 5 ESPC Project Assistance

Energy Exchange : Federal Sustainability for the Next Decade The Notice – The NOO The NOO is the vehicle by which to explore all the technologies/opportunities permitted in the contract. The Agency is required to issue a Notice - Notice of Opportunity to all 16 contract holders that includes, but is not limited to: –Agency’s desire to pursue an ESPC project, –Concise Statement of Objectives, –General description of Agency mission, –Summary info about facility energy usage, –Request for Contractor Expressions of Interest in pursuing project, and for those interested, solicit: Qualifications for conducting IGA Any other preliminary information the Agency might request in order to make a meaningful selection –Significant evaluation factors (relative importance), and –Reasonable response period (30 days/depends) 6

Energy Exchange : Federal Sustainability for the Next Decade – Selection Based on Qualifications – Selection Based on Preliminary Assessments – Unsolicited Proposals 7 The Selection Process

Energy Exchange : Federal Sustainability for the Next Decade The contractor shall submit a Preliminary Assessment (PA) to the Government, which sets out the merits, technical feasibility, level of projected energy savings, economics, and price of the project. The ESCO shall ensure a Project Facilitator has been selected by the Government prior to submitting the PA.  At a minimum, the contractor shall include its technical and price assessments, in a format in accordance with agency requirements.  It is recommended that the PA be approximately 20 pages, except in instances where the ESCO, or agency guidance, requires more pages to adequately address each of the requirements. The contractor shall submit completed Schedule TO-1 (PA), TO-2, TO-3, and TO-4, as well as documentation to support the entries on the form. The technical and price assessments shall be in accordance with the following requirements: Project Overview Executive Summary Technical Assessment ECM description, ECM Performance Measurement, Management Approach 8 Preliminary Assessment

Energy Exchange : Federal Sustainability for the Next Decade Following issuance by the agency of the NOI, the selected contractor shall conduct an Investment Grade Audit (IGA) of facilities and energy systems at the project site to substantiate the contractor’s ability to achieve the estimated total cost savings submitted The IGA shall identify the relevant existing conditions of applicable agency facilities For each ECM identified, the contractor shall provide a detailed analysis documenting the proposed annual energy or water savings performance of the ECM after installation, startup and testing. The contractor shall document the results of the IGA. 9 The Investment Grade Audit

Energy Exchange : Federal Sustainability for the Next Decade The contractor shall submit a Proposal, consisting of technical and price components, as well as an individual small business subcontracting plan for each task order. Particular emphasis should be placed on assessment of renewable energy opportunities. Based on the results of the IGA, the contractor shall submit completed Schedules TO-1 (final), TO-2, TO-3, TO-4 and TO-5, with supporting documentation. Proposals will be reviewed in accordance with the instructions set forth in the Task Order RFP. The agency will not be responsible for any costs incurred, such as proposal preparation costs or the costs incurred in conducting the IGA, unless a Task Order is awarded or authorized by the agency CO. The Proposal format requirements are: -Project Overview -Volume I - Technical Proposal -Volume II - Price Proposal -Individual Small Business Subcontracting Plan 10 The Proposal and Proposal Review for Task Orders

Energy Exchange : Federal Sustainability for the Next Decade  The contractor shall prepare and submit a general M&V approach with its Preliminary Assessment (PA), identifying the M&V options and methods to determine a site-specific pre-installation baseline and post-installation ECM performance for each proposed ECM.  The contractor shall prepare and submit a site-specific M&V plan with its final proposal, per the requirements of the master IDIQ contract. This site-specific M&V plan shall include a schedule indicating M&V activities and post-award M&V reporting milestones for each ECM.  The contractor shall prepare and submit an annual M&V report to the agency including data and calculations that demonstrate that continued ECM performance achieves the guaranteed annual energy, water, and related cost savings as required. 11 Measurement & Verification

Energy Exchange : Federal Sustainability for the Next Decade These contracts and subsequent task orders require the contractor to possess the capability to implement ECMs that reduce energy and water consumption or costs, increase renewable energy use and may reduce energy and water-related O&M costs. ECMs include measures to increase energy efficiency of energy-consuming systems and to reduce water consumption. ECMs also include measures that improve the efficiency of energy production systems that generate electrical and/or thermal energy. Particular emphasis should be placed on assessment of renewable energy opportunities. 12 Energy Conservation Measures – ECM

Energy Exchange : Federal Sustainability for the Next Decade The FEMP home page is your source on energy and sustainability: 13 Additional information

Energy Exchange : Federal Sustainability for the Next Decade 14 Questions?