WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.

Slides:



Advertisements
Similar presentations
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Advertisements

Bob Grubbs Lead Bridge Engineer ODOT Region 3, Tech Center Lessons Learned FAST 14, Boston MA FHWA Highways for Life Showcase.
ODOT Structure Project Manager Training
Connection Details for Prefabricated Bridge Elements and Systems
St. Croix River Crossing S. P
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
PREFABRICATED BRIDGE ELEMENTS & SYSTEMS (PBES), DECISION- MAKING FRAMEWORK Claude Napier Sr. Structural Engineer Resource Center - Structures TST.
Connection Details for Prefabricated Bridge Elements and Systems
POWERPOINT PRESENTATION
Totally Precast Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
NE Regional statistics and discussion guide report Summary
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
“Get in, do it right, get out, and stay out.”
Self-Consolidating Concrete Applications Celik Ozyildirim, PhD, PE Virginia Concrete Conference 2011.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Totally Precast Concrete Bridges
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Oregon DOT Integral Abutment Design Criteria
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
US26: Cornelius Pass Rd -185th Ave
Innovative Contracting and Trns*Port
Construction 101 Start to Finish
Totally Precast Concrete Bridges
Presentation transcript:

WVDOH Accelerated Construction Concepts Benjamin Beerman, PE

I-64 over 16 th Street

Construction Sequence - Existing Median

Non-Accelerated

AcceleratedNon-

Accelerated

Non-

Non-Accelerated

Accelerated Concepts Drilled Shaft Construction w/ no impacts to traffic PreCast/PT Saddle Caps PreCast Abutment Option PreCast PT Deck Panels Option Incentive/Disincentive Clause (I/D) – no Option

Drilled Shafts Drilled shafts –7-ft diameter up to 70-ft deep –Polymer Slurry in lieu of casing method –Started in mid 12/2007, Ended in April/May (All 20 Pier Shafts) Before During

PreCast PT Straddle Caps

PreCast PT Saddle Caps

PreCast PT Straddle Caps Column to Cap Connection –4 of the 5 Contractor’s bid Disc –Avg Disc Bid $3k/each (20 total) –Pot Bearing Bid $4k/each

PreCast PT Pier Caps

Abutments PreCast or a CIP Abutment Alternatives

I-64 over 16 th Street

PreCast PT Deck Panel

Incentive/Disincentive Clause FHWA technical advisory T –USER COSTS and PREMIUM WAGE RATES –14 weeks allowed for Accelerated Phase –The FHWA Technical advisory, 5 percent of the total contract amount is recommended as the maximum incentive amount. –$21.8M Total Project costs CIP Option (16 to 24 weeks) –$23M Total Project costs for PreCast Option (12 to 16 weeks) –$10.5M Accelerated Phase, $550k maximum incentive –$500 to 800k for premium wage labor costs –$8,500 minimum disincentive daily amount to prevent bids from including disincentive payouts in order to obtain Low Bid –Choose one time incentive payment of $300k with $10k/day penalty.

Incentive/Disincentive Clause Weekly Multiplier Accelerated Construction Cost5 d/wk6 /wk7 d/wk 8 hr/d hr/d hr/d No. Weeks to complete Work w/ weather Cost5 d/wk6 /wk7 d/wk 8 hr/d hr/d hr/d Premium Labor Costs Cost5 d/wk6 /wk7 d/wk 8 hr/d$3,540,012$3,835,013$4,045, hr/d$3,894,013$3,953,013$4,197, hr/d$4,130,014$4,228,347$4,298,586 I/D credits/payments Cost5 d/wk6 /wk7 d/wk 8 hr/d-$542,276-$239,680-$23, hr/d-$179,161-$62,916$235, hr/d$62,916$264,647$408,740 Premium Labor Costs adjusted w/ I/D credits/payments Cost5 d/wk6 /wk7 d/wk 8 hr/d$4,082,288$4,074,693$4,069, hr/d$4,073,174$4,015,929$3,961, hr/d$4,067,098$3,963,701$3,889,846 Contractor's Bid Options Cost5 d/wk6 /wk7 d/wk 8 hr/d$21,782,347$21,774,752$21,769, hr/d$21,773,233$21,715,988$21,661, hr/d$21,767,157$21,663,760$21,589,905

Construction Pics Show Framing Plan over the piers

Construction Pics Show Framing Plan over the piers

Construction Pics

Final Pics

Opportunities for more? + 1 super (not “bridge”) in 2 to 3 week timeframe, or 2 supers in 8 to 12 weeks ++ S/D ratio: MDB (Composite DL, Continuous LL) ++ Specified additional pic points in cap (PT) ++ Looked at FLDOT’s prefab pier caps + Perhaps reduce the I in the I/D + No contingency detour (contractor opt. ramps) + Pro/Con inside alignment (bridge funds prevent)

Robin Hood Road Bridge

Preserve the Existing Alignment Relatively Low ADT, 200 VPD (2008) Detour Route Accommodating –Traveling Public –Emergency Vehicles –School Bus Traffic –Farming Activities Benefits –Temporary Bridge Not Required –Minimize the TCE/ROW take –Contactor Gains Full Access to Site –Increased safety for Public & Contractor w/ no Traffic

Robin Hood Road Bridge Existing Bridge: –2 Single lane 102ft each = 204ft –Timber Deck New Bridge: –3 Span (82/96/82) 260 ft 2 Lane Bridge (U.S.C.G Navigation Opening Improvements)

Accelerated Concepts Drilled Shaft Construction Straddle Caps PreCast/PS Box Beam PreCast Integral Abutments on Piling Option Span to Span Erection –Simple for DL, Continuous for LL Deck Pour Single Placement Option –Initial Set Requirement Incentive/Disincentive Clause (I/D)

P/S Saddle Cap

PreCast Integral Abutments

Span to Span Erection

Single Pour Deck 230 cy cubic yards of concrete required Appr. slab, Pier and Abt. Diaph. poured w/ deck Initial set language per AASHTO T197 –Initial Set F’c < 500 psi –Penetrometer Placement Time –Delivery + Placement + Finishing Time –Multiply by 1.3 to 1.5

I/D Clause 126 Days (w/ weather) conventional Needed 70 Days per public meeting One Time Lump Sum Incentive $50,000 $2,000 per day Disincentive $1.76M total ($800k phased) FHWA Maximum I = $40k Premium Wage Rate = $52k D = $1,200/day to prevent low bid

Complete

Opportunities for More? Long weekend closure Corrugated pile pocket detail, or Split the abutment walls in half, or Drilled Shafts/Straddle Abutment MDB (Composite for DL, Cont. for LL) with ¼” over poured deck, shot blast/grind final profile

Honey Creek -Outside Substructure Construction -Span to Span Erection -PreCast Panel/CIP Deck -PreCast/CIP Pier Cap -Disincentive Clause -85 days -$4k per day -No Incentive

Honey Creek

Summary Increase Safety – Traveling Public & Contractor Reduce Duration of Traffic Disruptions Long Term Eliminate the use of Temporary Bridge Engineering, Permitting, Review/Approval, Install/Remove Minimize TCE/ROW Takes Minimize Utility and Environmental Impacts No Sacrifice to Quality Public Support & Partner Agency Collaboration EMS (Fire, Police, Ambulance), Schools, Mail, Businesses Committed Team Effort btw. Construction, Materials, and Engineering

Questions Thank You! Benjamin Beerman, P.E