CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Backgroun d Redesign Analysis Office Airside CUP Analysis CHP Analysis Power Distributio n Outline Constructio n Impact Conclusion Backgr ound Jim Gawthrop.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
N O R T H A M E R I C A C O M M E R C I A L TDP
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Maryland Transportation Authority Police Training Facility
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
Eastern High School Baltimore, MD
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Munters DOAS, Chilled Beams and VRV
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Senior Thesis Presentation
Abbas Shirian, PE Certified GeoExchange Designer
Tri-Valley Jr./Sr. High School Hegins, PA
RiverView Condominiums II Chicago, IL
Presentation transcript:

CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Central High School 1 st floor renovation 2 nd floor addition Location - Mid Atlantic Region Size - 322,000 sq. ft. Project Cost - $84 million Completion - February 2015

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Heating Water System 1 natural gas boiler Chilled Water System 2 air cooled chillers Air Handling Units 20 DOAS units Energy recovery wheels 4 pipe fan coil units

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Peak Heating Load – 7766 MbhPeak Cooling Load – 934 Tons

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Peak Electric Demand – kWhPeak Gas Demand – 2094 Therms

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Goals REDUCE energy demand REDUCE environmental impact INCREASE maintainability Proposal Ground Coupled Heat Pump System Heat Pumps Packaged ERUs Hydronic Pumps

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Vertical Bore Layout Well Field Increase depth of well Decrease amount of wells Oversize Well Field 1000 Tons Soccer Field Future capacity No supplemental boiler / cooling tower

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Well Field Layout 38 rows 13 wells per row Reverse return

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Individual runs Emergency shutoff 3 VFD pumps 2 primary pumps 1 redundant Increase maintainability

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Heat Pump Selection Carrier Typical 1 – 3 ton units Energy Recovery Unit Selection SEMCO Packaged Water to water source heat pumps Enthalpy & Sensible wheels

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Electricity increase 45% Energy decrease 35% Savings of $19074 per year

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Heat Pump closet Typical for classrooms Achieves mitigation of sound through wall Meets ANSI S12.60 standard

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Low Frequencies Heat Pump emits most noise Mitigate sound through ductwork NC 30 required Low frequency issues NC 27 achieved

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Cost Difference of $ Duration Difference of 2 days Coordination Issues Difference of 2

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Goals REDUCE energy demand REDUCE environmental impact INCREASE maintainability Conclusions GCHP REDUCED site energy INCREASED environmental impact INCREASED maintainability Heat Pump Closet MEETS ANSI standards NOT feasible to construct

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Acknowledgements Jacobs SHW Group Thesis Advisor AE Faculty Family & Friends Classmates THANK YOU!

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 References SHW Group LLP “Final Bid Set”. Reston, Virginia. Central High School “Master Specifications”. ASHRAE. Standard , Ventilation for Acceptable Indoor Air Quality. Atlanta, GA. American Society of Heating Refrigeration and Air Conditioning Engineers, Inc. ASHRAE. Standard , Energy Standards for Buildings Except Low-Rise Residential Buildings. Atlanta, GA. American Society of Heating Refrigeration and Air Conditioning Engineers, Inc. ANSI/ASA S , American National Standard Acoustical Performance Criteria, Design Requirements, and Guidelines for Schools, Part 1: Permanent Schools. Melville, NY. Acoustical Society of America. Halliwell, R.E., Nightingale, T. R. T., Warnock, A. C. C., Birta, J. A. Gypsum Board Walls: Transmission Loss Data NRC-CNRC. Mossman, Melville. Plumbing Cost Data, N.p.: Means, Incorporated, R. S, Print. Mossman, Melville. Mechanical Cost Data, N.p.: Means, Incorporated, R. S, Print. Phelan, Marilyn. Assemblies Cost Data, N.p.: Means, Incorporated, R. S, Print. Faculty Consultations

Central High School Introduction Existing Mechanical System Thesis Proposal Mechanical Breadth GCHP Sizing / Layout Energy Savings Acoustical Breadth Construction Breadth Conclusion ADAM BROWN MECHANICAL OPTION SPRING 2014 Questions?