September 12, 2003 - SW Colorado PSD Increment Study Southwest Colorado Nitrogen Dioxide ( NO 2 ) Prevention of Significant Deterioration (PSD) Increment.

Slides:



Advertisements
Similar presentations
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Advertisements

1 Air Quality Impact Analysis and Other PSD Requirements Donald Law U.S. EPA Region 8.
Paul Wishinski VT DEC Presentation for: MARAMA-NESCAUM-OTC Regional Haze Workshop August 2-3, 2000 Gorham, New Hampshire LYE BROOK WILDERNESS CLASS I AREA.
Kimberton, PA | Columbus, GA | Strategic Air Planning: Where Do We Grow From Here? Colin McCall |
Meeting of the Southern Ute Indian Tribe/State of Colorado Environmental Commission and the Colorado Air Quality Control Commission 4/16/2015.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Issues on Ozone Planning in the Western United States Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31, 2011.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
Update on EPA Oil and Gas Activities Greg Green, Outreach and Information Division, OAQPS.
2005 Air Emissions Inventory Criteria and Hazardous Air Pollutants Inventory Southern Ute Indian Reservation, Colorado Presented by : Brenda Sakizzie,
North Dakota’s Approach to a Periodic Review to Determine the Status of Consumption of PSD Class I Sulfur Dioxide Increments WESTAR Fall Technical Conference,
AoH Report Update Joint DEJF & AoH Meeting, Las Vegas November , 2004 Air Resource Specialists, Inc.
1 Regional NEPA Analysis of NOx Emissions from Potential Oil & Gas Development Scott F. Archer USDI - Bureau of Land Management March.
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
1 Summary of LADCO’s Regional Modeling in the Eastern U.S.: Preliminary Results April 27, 2009 MWAQC TAC June 15, 2009.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
WRAP Regional Modeling Center April 25-26, 2006 AoH Work Group Meeting Regional Modeling Center Status Report AoH Workgroup Meeting Seattle, WA April 25-26,
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
New Source Review (NSR) Prevention of Significant Deterioration (PSD): Refinement of Increment Modeling Procedures Proposal Jessica Montañez.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Regulatory Requirements For Modeling. Air Quality Model Estimates Developing Air Pollution Control Plans Assessment of Environmental Impacts Projecting.
GIS Applications for Air Quality Management Robert Wu 吳震球 South Coast Air Quality Management District SCCAEPAApril 26, 2008.
The National Environmental Policy Act and Oil and Gas Development in Region 8 WESTAR Oil and Gas Conference October 22, 2008.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
WESTAR 2003 Fall Technical Conference on PSD Increment Tracking & Cumulative Effects Modeling Seattle, Washington Conducting Class I Area Increment Analyses.
Regional Modeling for Stationary Source Control Strategy Evaluation WESTAR Conference on BART Guidelines and Trading September 1, 2005 Tom Moore -
GETTING STARTED IN AIR WORK BY JAMES TEMTE ~ ANTHC ~ AIR QUALITY PROGRAM MGMT OF TRIBAL AIR QUALITY IN ALASKA ~ ITEP APRIL 2011.
Proposed Revisions to the Guideline on Air Quality Models
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Best Available Retrofit Technology (BART) Process November 15, 2006 Eric C. Massey, Manager Air Quality Compliance Section.
A&WMA Southern Section Annual Meeting Biloxi, MS September 12, 2012 Carla Brown, P.E. MS Dept. of Environmental Quality
How to get Tribal Permitting Authority: Options and Procedures Nancy Mayer U.S. EPA OAQPS.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
PM 2.5 Stakeholder Working Group Meeting #1 South Coast Air Quality Management District June 8, 2006.
Current State Issues in Title V Permitting Matthew A. Paque Environmental Attorney Supervisor Oklahoma Department of Environmental Quality Office of General.
PSD Permitting Process Nancy Mayer EPA OAQPS. 2 Topics Find technical resources for permit review Describe how permits are constructed Describe what to.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
WESTAR 2003 Fall Technical Conference Introduction to Class I Area Impact Analyses September 16, 2003 John Bunyak National Park Service.
TAS and TIP Swinomish Tribe and the Incremental Approach.
2005 Progress on Emissions Inventories Attribution of Haze Workgroup Meeting January 24, 2006.
1 DRAFT Report for Air Quality Analysis on Cumulative Emissions, Barrio Logan Tony Servin, P.E. Modeling Support Section Planning and Technical Support.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
N EW Y ORK S TATE D EPARTMENT OF E NVIRONMENTAL C ONSERVATION Short Term Ambient Air Quality Standards and The Effect on Permitting Margaret Valis NESCAUM,
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
The Clean Air Act (CAA) is the comprehensive federal law that regulates air emissions from stationary and mobile sources.
EPA Region 10 Cumulative Effects Analysis Methodology Development Rob Wilson and Herman Wong WESTAR Fall Technical Conference September 16, 2003.
Developing a Tribal Implementation Plan
Dan Campanella Nick Lombardy
Draft Modeling Protocol for PM2.5
Arizona Regional Haze State Implementation Plan
The Clean Air Act By Jessi Walker Per 2.
Four Corners Air Quality Task Force
Overview of New Source Review (NSR)
PSD Issues in PM2.5 Transition Proposal
How to get Tribal Permitting Authority
National Ambient Air Quality Standards (NAAQS) Part 5: NAAQS and NSR
Workshop Technical and Policy Studies to Support the Annex
Presented to WRAP November 15, 2001 John Kowalczyk & Bob Neufeld
Regional Modeling for Stationary Source Control Strategy Evaluation
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

September 12, SW Colorado PSD Increment Study Southwest Colorado Nitrogen Dioxide ( NO 2 ) Prevention of Significant Deterioration (PSD) Increment Study PHASE I Colorado Department of Public Health & Environment Air Pollution Control Division Technical Services Program September 12,

September 12, SW Colorado PSD Increment Study Why was this periodic increment study done? Federal rules require states to periodically review the adequacy of their PSD plans to prevent significant deterioration of air quality (i.e., to prevent increment violations). Federal Land Managers expressed concern about the Class I NO 2 increment at Mesa Verde. Colorado had concerns about growth from minor sources in the study area.

September 12, SW Colorado PSD Increment Study Project Phases For convenience, this study was divided into two phases: –Phase I : quantified increment consumption over a broad area and identified areas with apparent increment violations. –Phase II: studied ‘hot spots’ found in the phase I study A phased approach was helpful because we didn’t have to spend lots of time trying to resolve every apparent violation found in the phase I study. It kept the process moving.

September 12, SW Colorado PSD Increment Study Models Model selection was done in late 1998; modeling was performed in Emissions Models: EPA’s MOBILE5 and Non-Road Emission Factor models Meteorological Models: 1990 MM4, CALMET Air Quality Models: CALPUFF, ISCST3

September 12, SW Colorado PSD Increment Study Modeling Domain

September 12, SW Colorado PSD Increment Study Inventory Area, Mobile, and Point inventories were developed. Point sources were identified as increment consuming, baseline, or retired baseline. For area, mobile, and baseline sources, changes in actual emissions since the minor source baseline date were estimated.

September 12, SW Colorado PSD Increment Study Estimating changes in actual emissions since the minor source baseline date can be problematic (a moving target)

September 12, SW Colorado PSD Increment Study General Model Application Although the domain included New Mexico, we limited receptors to Colorado for several reasons. CALPUFF receptors were used for Class I areas regardless of the distance from source to receptor. ISCST3 was used for Class II areas.

September 12, SW Colorado PSD Increment Study CALPUFF Model Application AREA sources were used in CALPUFF for only those few grid cells with significant increment consuming emissions. This was necessary so the model wouldn’t run forever. We wanted to use CALPUFF for both the Class I and Class II receptors, but the CALPUFF model run time (with only the Class I receptors) was about 15 days of CPU time; thus, we could not finish the project on schedule if we modeled the Class II receptors with CALPUFF.

September 12, SW Colorado PSD Increment Study ISCST3 Model Application The inventory had over 700 increment consuming point sources with numerous meteorological towers. For permitting, we typically select met data for the source under review, but when 700 sources are ‘under review,’ met selection is problematic. Many ISCST3 model runs were done with different met sets. Results were interpreted based on the ‘most representative’ met data for a given ‘hot spot.’

September 12, SW Colorado PSD Increment Study Baseline and Increment Consuming NOx Stationary Sources in Modeling Domain Class I Mesa Verde and Weminuche are federal Class I areas where the annual nitrogen dioxide (NO 2 ) PSD increment is 2.5 micrograms per cubic meter (  g/m 3 ). All other areas are Class II areas where the NO 2 PSD increment is 25  g/m 3.

September 12, SW Colorado PSD Increment Study Change in Mobile/Area Gridded Inventory

September 12, SW Colorado PSD Increment Study Most Increment Consuming Emissions in the Study Area are from Point Sources

September 12, SW Colorado PSD Increment Study

Results No Class I increment violations found. No ‘regional’ Class II violations found. Apparent NO 2 increment violations due to complex terrain and building downwash were found in the vicinity of a large compressor station.

September 12, SW Colorado PSD Increment Study Public and Peer Review We consulted with source operators throughout the project, particularly for sources that appeared to have problems. We requested comments on the draft report from various stakeholders (U.S. EPA, New Mexico, Southern Ute Indian Tribe, Source Operators, Environmental groups).

September 12, SW Colorado PSD Increment Study Limitations and Problems The report had a large section on study limitations. A few of the important limitations included: –NOx chemistry treatment –meteorological models –lack of observations –inventory, inventory, inventory, inventory, inventory …

September 12, SW Colorado PSD Increment Study Closing Thought… If you do a periodic study, consider restricting receptors to a single ‘baseline area’ to avoid confusion. Why? –Sources located outside the ‘baseline area’ can contribute to increment consumption regardless of the ‘minor source baseline date’ in the area where they are located. –Why? According to EPA, only the ‘minor source baseline date’ applicable to the ‘baseline area’ under review is relevant. –For more, see April 5, 1999 memo from Bill Harnett (U.S. EPA)