Investigation into collapse of Terminal 2E concourse continues Presented By: Yossra Ali Mohamed Ali By:Peter Reina Web Address:

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Structural Steel Construction
Space and shell structures
The Big Belt House Architect: William E. Massie
Portal Framed Construction
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
MAJOR PROJECT: warehouse/office
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Gravity Force Resisting Systems
Skyscraper Construction
Analysis. Career opportunity  You are a proud junior member of “Bridging the gap” an up and coming engineering firm.  You have just been ask to analyze.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Totally Precast Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
 Sixth largest country in the world  Same size as the 48 mainland U.S. states  The world’s flattest, smallest continent  Lowest pop. density in the.
 Project Delivery  Design Considerations  Lessons Learned.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Reinforced Concrete VS Steel
BCT 100 Overview of the Construction Industry. Structural Failure (continued) Strength of Materials Failure Engineering / Design Error Poor Construction.
Chapter 19 Floors.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
for Earthquake Resistance
Construction Technology 3 D39 TA Dr Mohamed Abdel-Wahab Edwin Chadwick Building, Room Lecture.
1.  Falls are the leading cause of death in construction  Falls from as little as 4 to 6 feet can cause serious lost-time accidents and sometimes death.
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
National Centre of The Performing Arts Beijing Paul Andreu.
SITE SUPERVISION (CITADEL TOWER)…………….…1 SITE SUPERVISION (CITADEL TOWER)…………….…1 DESIGN OF A 3 BEDROOM STOREY BUILDING…..2.
SRT 251 Construction and Structures Major Project Warehouse and Office Complex.
Appendices Subpart R Steel Erection
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
THNS 2010 Open supervision platforms for smart and sustainable cities, Yves PERREAL, Strategic studies Director, THALES.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Omni Dallas Hotel. Omni Dallas Hotel – In the Beginning Dallas Convention Center 2.1 Million SF Facility Ballrooms Exhibit Space Theater Arena Operating.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Deteriorated Roof Deck Systems Group Discussion.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Social Studies 8 Romanesque & Gothic Architecture. K.J. Benoy.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
U Building Area: (sf) 4100sf Anticipated date of completion: Spring 2010 Location of Project: Sarasota, FL Type of Project: Residential Construction.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
INVESTOR MANAGEMENT DAY ‒ DUBAI 1. 2 Background Strategy OperationsSome current and recently secured contracts.
Hartford Civic Arena Roof Collapse
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
World Trade Centre Collapse Group 17 Valerie Scott Dan Kennedy.
Lyon-Satolas TGV Railway Station Lyon, France. Built for the 1992 Winter Olympics in Albertville, France, this is Santiago Calatrava's competition winning.
Topic Today’s Objective
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
DIFFERENT TYPE OF BRIDGES
ONE worker was killed and 15 injured in an explosion on a construction site at Shanghai's Yangshan Deep Water Port yesterday. The man who died was pierced.
Team members Brandon DingAdam Spiller Nickolaus AguillonLeonardo Garcia Matthew QuiriarteManuel Garces Anthony Garcia THE PENGUINS: PATRICKS TOWERS.
Fall from Ladder while Climbing to the Mobile Scaffold (Serious Accidents in Construction) Construction The copyright to this material belongs.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Dubai's Car. Dubai's bold plan to build the world's biggest Airport DUBAI, United Arab Emirates — Dubai's ruler has endorsed a $32 billion expansion plan.
Totally Precast Concrete Bridges
Interview: < A visit with Richard Epstein >
High Bridge Re-Deck Project
Toledo I-280 Crane Accident
Totally Precast Concrete Bridges
Mitre III Building McLean VA Debra Schroeder Structural Option.
Toledo I-280 Crane Accident
TxDOT Implementation Project Texas Tech University
Presentation transcript:

Investigation into collapse of Terminal 2E concourse continues Presented By: Yossra Ali Mohamed Ali By:Peter Reina Web Address: 41 Date: July

Fatal Collapse On May 23, 2004 The four deaths caused by the sudden collapse OF A : Terminal’s 10-million- a-year passenger capacity. $900 million cost concourse building at Roissy Charles de Gaulle International Airport, just north of Paris Less than a year after it opened to traffic Fatal Collapse HAS ACCQURED

Terminal 2E is the most recent addition to the airport’s second Aérogare, which has opened in stages since Covering nearly 50 acres east of the original complex Understanding the design: Though there was little warning of the structural failure, the timing of its occurrence Victims of the accident were located in an “isthmus” zone of the building, which connects the concourse with the main arrivals and departures area. The collapsed section abutted the isthmus, which was largely undamaged

Structurally, the concourse is essentially a long, elevated platform covered by a vaulted concrete roof. The vault bulges to create a space of about 100 feet at its widest, and curves back in by several feet at floor level. Numerous punched windows within the structure provide natural lighting, and more light enters through glazed gaps between the 10 continuous concrete tubes that form it. AdP had problems with the concourse’s supporting columns during construction. Photography: Courtesy Eiffel/Laubeuf At the isthmus building, several alternate side panels of the vault were opened up to create three passenger entrances. At those locations, the remaining intermediate vault sections were designed to be connected to each other via the crown in order to bridge the structural gaps formed by the openings.

Conceptually Conceptually the design of Terminal 2E “couldn’t get much simpler,” says the U.K. structural engineer, who requested to remain anonymous. He further adds that, spanning about 100 feet, the structure cannot be seen as a particularly challenging or risky design. AdP undertook all the outline design and also managed construction of Terminal 2E, mobilizing some 150 architects and engineers from within its ranks. However, the builder of the vault is reported to have denied responsibility for detail design work, which would have been normal practice in France. AdP undertook all the outline design and also managed construction of Terminal 2E, mobilizing some 150 architects and engineers from within its ranks. However, the builder of the vault is reported to have denied responsibility for detail design work, which would have been normal practice in France.

Construction problems? 1.During construction, contractor GTM Construction of Paris precast each vault section in three pieces near the airport site, recalls Didier Primault, a senior engineer with the parent company Vinci Group. 2.The pieces, forming both the sides and the crown of each section, were then brought to the site, where, using large cranes, GTM installed the three sections on temporary internal props. 3. Workers then “stitched” the sections together with cast-in- place-concrete and steel reinforcing bars to form a continuous enclosure. Substructures of the concourse building were constructed by a different firm, Hervé of Paris.

4- AdP recorded problems with the construction of the columns supporting the vaults. As a result, each of them was reinforced externally by applying a layer of fiber-reinforced concrete. 5- While AdP declines to discuss details while the investigation continues 6- a close observer of the project recalls a work stoppage for several months during the concourse’s construction. “They had some serious cracks in the columns,” says the engineer, who worked on a nearby building. 7- Additionally, vault deflections “were bigger than expected,” he adds. “They (AdP) recalculated completely the full structure.”

Since retiring from AdP last year, Andreu has run a small practice near Montsouris Park in southern Paris. However, he continues to collaborate with AdP on various projects. Among his most recent innovations was the proposal to use titanium for the long-span main girders of a new terminal for the airport at Abu Dhabi, in the United Arab Emirates. Meanwhile, his design for a new national theater are taking shape in Beijing, and his Oriental Art Centre in Shanghai is also well advanced. Among his most recent innovations was the proposal to use titanium for the long-span main girders of a new terminal for the airport at Abu Dhabi, in the United Arab Emirates. Meanwhile, his design for a new national theater are taking shape in Beijing, and his Oriental Art Centre in Shanghai is also well advanced. A BOUT THE ARCHITECT ( ANDREU) HAS COME OVER WHAT HAPPENED & COMPLITED HIS LIFE, INNOVATIONS