The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
24. June 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory SPIE Glasgow 2004.
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
LIGO-G M First Generation Interferometers Barry Barish 30 Oct 2000 Workshop on Astrophysical Sources for Ground-Based Gravitational Wave Detectors.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Status of the LIGO Project
Marcus Benna, University of Cambridge Wavefront Sensing in Dual-Recycled Interferometers LIGO What is Wavefront Sensing? How does it work? –Detection of.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G9900XX-00-M LIGO Status and Plans Barry Barish March 13, 2000.
Overview Ground-based Interferometers Barry Barish Caltech Amaldi-6 20-June-05.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
GEO600 Harald Lück Ruthe, Worldwide Interferometer Network.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Status of LCGT and CLIO Masatake Ohashi (ICRR, The University of TOKYO) and LCGT, CLIO collaborators TAUP2007 Sendai, Japan 2007/9/12.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
LIGO-G D “First Lock” for the LIGO Detectors 20 October 2000 LIGO Hanford Observatory Stan Whitcomb.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Variable reflectivity signal-recycling mirror and control Stefan Goßler for the experimental team of The ANU Centre of Gravitational Physics.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
ACIGA High Optical Power Test Facility
Initial and Advanced LIGO Status Gregory Harry LIGO/MIT March 24, 2006 March 24, th Eastern Gravity Meeting G R.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Optical Spring Experiments With The Glasgow 10m Prototype Interferometer Matt Edgar.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
ALIGO 0.45 Gpc 2014 iLIGO 35 Mpc 2007 Future Range to Neutron Star Coalescence Better Seismic Isolation Increased Laser Power and Signal Recycling Reduced.
The VIRGO detection system
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
The Proposed Holographic Noise Experiment
Installation and Commissioning Status Stan Whitcomb
Nergis Mavalvala MIT IAU214, August 2002
Design of Stable Power-Recycling Cavities
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Status of the LIGO Detectors
Summary of iKAGRA Test Run Mar 25-31, 2016
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
Improving LIGO’s stability and sensitivity: commissioning examples
Squeezed Light Techniques for Gravitational Wave Detection
Advanced Virgo ISC subsystem
Presentation transcript:

The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002

May 20, 2002 Andreas Freise Network of Interferometric Detectors LIGO ACIGA TAMA VIRGO GEO

East Arm 600 m North Arm 600 m clean room gallery in the central building central area trench with vacuum tube

May 20, 2002 Andreas Freise GEO Optical Layout Michelson Interferometer with Dual-Recycling folded arms with an optical path length of 2400 m Output Mode Cleaner triangular ring cavity Laser 14 W Mode Cleaners 2 triangular ring cavities (8 m optical path length)

May 20, 2002 Andreas Freise GEO 600 Sensitivity broadband configuration narrowband configuration

May 20, 2002 Andreas Freise Michelson Interferometer Output Mode Cleaner Laser Mode Cleaners Vacuum Enclosure 400 m 3 volume / 4000 m 2 surface 600 m long tubes, 60 cm diameter 2 m tall tanks with 1 m diameter tubes :1  mbar main tanks : 5  mbar

May 20, 2002 Andreas Freise Seismic Isolation The mechanical structure inside each vacuum tank is mounted on three Stacks: Triple Pendulum Suspension

May 20, 2002 Andreas Freise Monolithic Suspension Silicate (Hydroxy- Catalysis) Bonding Weld

May 20, 2002 Andreas Freise Status May 2002 (I) Michelson Interferometer Laser Mode Cleaners final optics test optics Laser + Mode Cleaners complete Power-Recycled Michelson with low finesse Two main mirrors with monolythic suspension

May 20, 2002 Andreas Freise Slave Master Slave entrance to vacuum system Laser System Master Laser: Nd:YAG NPRO (non-planar ring oscillator) 1064 nm Slave Laser: Nd:YAG injection-locked ring cavity nm less than 5% in higher modes

May 20, 2002 Andreas Freise Laser Light Power Michelson Interferometer Output Mode Cleaner Mode Cleaners 10 W 5 W ~ 5 kW ~ 4 mW (carrier) + ~ 100 mW (modulation sidebands) 1 W 10 kW at Beam Splitter

May 20, 2002 Andreas Freise Status May 2002 (II) Michelson Interferometer Laser Mode Cleaners 2 W 1 W ~ 50 mW 200 W at Beam Splitter Mode Cleaners: Troughput 80% 72% Finesse Visibility 96% 92% M PR final optics test optics

May 20, 2002 Andreas Freise Automated Control control loops made of analog electronics supervised by digital electronics controlled by distributed virtual instruments (LabView)

May 20, 2002 Andreas Freise Length and Frequency Control Michelson Interferometer Output Mode Cleaner Laser Mode Cleaners 25 MHz 13 MHz 37 MHz Laser Frequency Stabilisation: no rigid reference cavity laser is directly stabilised to suspended cavities 3 sequential Pound- Drever-Hall control loops common mode of the Power-Recycled Michelson serves as frequency reference Measured in-loop stability at the main interferometer input : Hz

May 20, 2002 Andreas Freise Mode Cleaners Output Mode Cleaner Michelson Length Control Michelson Interferometer Laser 15 MHz 10 MHz Differential arm length: (gravitational wave signal) heterodyne detection Schnupp modulation Signal-Recycling control: separate modulation frequency reflected beam from beam splitter AR coating

May 20, 2002 Andreas Freise Test Mass Actuators Reaction Pendulum: 3 coil-magnet actuators at intermediate mass Electrostatic actuation on test mass

May 20, 2002 Andreas Freise Alignment Control (I) differential wave-front sensing spot position control 4 degrees of freedom at MC 1 +4 at MC 2 +4 at MI (common mode) +2 at MI (differential mode) +2 at Signal-Recycling cavity = 36 Status May 2002: Complete (except for Signal- Recycling mirror)

May 20, 2002 Andreas Freise Alignment Control (II) Light on the main photo detector

May 20, 2002 Andreas Freise Data Acquisition Data acquisition uses 3 Data Collecting Units (DCUs) with (in total) : Hz Hz ~ Hz Possible data rate: 600kB/sec ~ 50 GB/day

May 20, 2002 Andreas Freise Daily overall duty cycles, maintenance periods not subtracted 430 hours of continuous data taking ~ 0.9 TB of data recorded Engineering run Coincidence Run with LIGO

May 20, 2002 Andreas Freise Detector Improvement (I) Detector characterisation groups analyse data from coincidence run Example: analysis of detector data for all times at which the Michelson interferometer left its normal operating point: 36 lock losses (on ) 9Not identified 7Acquisition failure 12Spike in laser channel 2Spot position event 2Stack movement 2Seismic event 2Manual alignment NoCause of loss of lock Checked wiring of the laser electronics, found and removed ground loops. duration of continuous locking of the mode cleaner section improved from ~4 hours to up to 100 hours

May 20, 2002 Andreas Freise Detector Improvement (II) Experimental optimisation period: electronics for Michelson servo loops are being completed Michelson automatic alignment is completed losses inside interferometer have been reduced (PR gain improved from 15 to 200) known problem with beam splitter suspension has been fixed sensitivity has been improved from /sqrt(Hz) to ~ 300 Hz

May 20, 2002 Andreas Freise Future steps Optimisation (Michelson) June 02 Coincidence run with LIGO (S1) July 02 Implementation of Signal-Recycling end of July 02 Optimisation (Dual-Recycling) Aug.-Oct. 02 Installation of final subsystems starting Nov. 02 Coincidence run with LIGO (S2) end of Nov. 02