March 26, 2008Fiduciary Forum1 The World Bank Fiduciary Forum 2008 e-GP Good Practices in SAR March 26, 2007.

Slides:



Advertisements
Similar presentations
KYRGYZ REPUBLIC Programmatic Public Expenditure Review Monitoring and Evaluation The MOF/Donor Workshop on PPER Bishkek, September 26, 2005.
Advertisements

______________________
Forest Carbon Partnership Facility Progress with Due Diligence Activities in Panama Participants Committee Meeting (FCPF PC5) La Lopé National Park, Gabon.
The use of Procurement Agents
1 Transport against HIV/AIDS Session 2: Mainstreaming the Response in Africa and South Asia November 29, 2005 Guang Z Chen Sector Manager, Transport South.
1 CREATING AN EFFECTIVE CENTRAL HARMONIZATION UNIT PEM-PAL WORKSHOP FOR INTERNAL AUDIT OFFICIALS Moldova, June 2007 Dr. Darius MATUSEVICIUS Financial.
Course: e-Governance Project Lifecycle Day 1
A case of Armenia: Legal framework for E-procurement in Public Procurement Sector Mr Karen Brutyan, PhD, PFM and PP EBRD Consultant, Wolf Theiss 1-2 December.
Significance of Public Procurement in Sri Lanka
2 ND S OUTH A SIA R EGIONAL P UBLIC P ROCUREMENT C ONFERENCE Islamabad, Pakistan, (March 25-27, 2014) C OUNTRY P RESENTATION - N EPAL Naresh Kumar Chapagain,
ARTF Financing Strategy SY1389 – SY1391 Ministry of Finance, Islamic Republic of Afghanistan ARTF Donor Meeting, London 29 January, 2010.
Transport and Trade Linkages: Central Asia & Eastern Europe
1 NIC / NICSIGePNIC - MMP Overview & Status of eProcurement implementation under Mission Mode Project As on
Public Procurement Agency Public Procurement System in Bosnia and Herzegovina.
2 ND S OUTH A SIA R EGIONAL P UBLIC P ROCUREMENT C ONFERENCE Islamabad, Pakistan, (March 25-27, 2014) Key Actions Agreed in Kathmandu Forum (2011) and.
Feedback Mechanisms in Malawi Key challenges and way forward Ministry of Finance and Development Planning MALAWI.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
Implementation of comprehensive end to end e-procurement Dte 12-9/2011/UPE dtd OM 10-3/2012/PPC dtd by ministry of finance Mandatory.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
BANGLADESH EXPERIENCE PUBLIC FINANCIAL MANAGEMENT AND PR OCUREMENT A presentation for Concurrent Session on Public Financial Management and Procurement.
The case of Saint Lucia IFC/World Bank Conference on Trade Logistics Washington DC - June 7, 2010 By Senator the Hon. Charlotte Tessa Mangal Minister for.
Public Procurement Regulatory Authority
1 PROCUREMENT PARTNERSHIP INITIATIVE: Regional Capacity Building 6 th Central Asian Public Procurement Forum Istanbul – 27 April 2010 Omar H. Tiwana Principal.
ADB Support of Public Procurement Reform Presented By: Amr J. Qari, Procurement Specialist Seventh Regional Public Procurement Forum, May , 2011.
The Ministry of Aboriginal Affairs Aboriginal Economic Development Supports Ontario Library Association Superconference January 29, 2014.
1 Lal Shanker Ghimire Joint Secretary FACD, Ministry of Finance Joint Evaluation in Nepal: Experience Sharing from the Paris Declaration Evaluation.
Design, Implementation & Roll-out of e-Procurement May 2013 Kang-il Seo | Deputy Director, International Cooperation Division Public Procurement Service.
MAF’s M & E System Development Achievements and Ways Forward SWG-ARD, September 30, 2014 DoPC, MAF By: Somphathay Liengsone Deputy Director of Project.
United Nations Statistics Division
Working with EBRD – Consultant Opportunities for Dutch Consultants The Hague, 22 May 2013 Getting started, being prepared and identifying EBRD consultant.
Dao Dinh Kha National Centre of Digital Signature Authentication - Agency of Information Technology Application A vision on a national Electronic Authentication.
High-level forum on strategic planning for statistics: Bishkek, May 2006 Why statistics? Why strategic planning? Presentation by PARIS21 Secretariat.
Trade Facilitation Implementation: Some evidence from Africa David Luke Coordinator of the African Trade Policy Center Regional Integration and Trade Division.
International Organizations Nvard V. Manasian.  The World Bank lends money to low and middle-income countries to support development and change.  Development.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
KEY GENDER ISSUES IN LABOUR MARKET AND PRODUCTION OF LABOUR STATISTICS IN MALAWI Household Surveys and Measurement of Labour Force with Focus on Informal.
P UBLIC P ROCUREMENT IN THE K YRGYZ R EPUBLIC MINISTRY OF FINANCE OF THE K YRGYZ R EPUBLIC.
1 Strategies for Enhancing Procurement Reforms: Monitoring Results & Involvement of Civil Society: Bangladesh Case Zafrul Islam Lead Procurement Specialist.
AFRICA INFORMATION HIGHWAY Department of statistics, ESTA- Chief Economist Complex, ECON.
PROCUREMENT IN PRSCs – Case of Uganda March 24-28, 2008 Playing a Key Role in achieving the Development Results Playing a Key Role in achieving the Development.
PUBLIC PROCUREMENT INFORMATION TECHNOLOGIES IN THE REPUBLIC OF TAJIKISTAN PUBLIC PROCUREMENT AGENCY UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
HIV/AIDS Prevention in the Infrastructure Sector 14 March 2008 Sector Strategy Development Department, Japan Bank for International Cooperation (JBIC)
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
IHP+ Financial Management Technical Working Group One year after formation FMTWG (Nov 2015)
Procurement & Fiduciary services Department Development Bank African The 1 THE HIGH LEVEL FORUM ON PUBLIC PROCUREMENT REFORMS IN AFRICA Progress, Challenges,
Argentina – Fiduciary Action Plan Fiduciary Forum March 2008.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
AFR Observatory on monitoring and evaluating procurement reform programs Working for a world free of poverty.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Transforming Procurement E- GP Planning and change management Action Plan for E- GP implementation in Kenya Jerome Ochieng Public Procurement Oversight.
1 First Nations Economic Development Readiness Questionnaire Presented By: Ontario First Nations Economic Developers Association and Ministry Of Economic.
Red Flags in Procurement BIMILACI 10 & 11 May 2007 IADB – DEV/PRM & PRE/OII.
E-Procurement : Towards Transparency and Efficiency in Public Service Delivery.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Review of CEPSIP2 and PSIP tools March 2016 PROJECT FOR CAPACITY ENHANCEMENT IN PUBLIC SECTOR INVESTMENT PROGRAMMING PHASE II (CEPSIP2)
TOWARDS PUBLIC PROCUREMENT KEY PERFORMANCE INDICATORS Paulo Magina Head of the Public Procurement Unit Public Sector Integrity Division 10 th INGP Annual.
DIMEX’s Project Implementation for 4-10/2016 and Work Plan 2017
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
PROCUREMENT FIDUCIARY ARRANGEMENTS IN SECTOR-WIDE APPROACHES (SWAps)
Asha Ayoung Lead Procurement Specialist, OPCPR
Africa Information Highway
Public Private Partnerships
Sybi Hida ALBANIA February, 2005
Management Group on Statistical Cooperation
Sybi Hida ALBANIA February, 2005
Introducing the Climate Finance Network
Presentation transcript:

March 26, 2008Fiduciary Forum1 The World Bank Fiduciary Forum 2008 e-GP Good Practices in SAR March 26, 2007

March 26, 2008Fiduciary Forum2 Agenda SAR Strategy and ProceduresSAR Strategy and Procedures Status of e-GP Implementation Status of e-GP Implementation

March 26, 2008Fiduciary Forum3 SAR Strategy > SAR Strategy > Mainstreaming technology into procurement reform, thereby reforming procurement reform itself. Mainstreaming technology into procurement reform, thereby reforming procurement reform itself. A nodal agency that will set policy and information standards and mandate the implementation of the standards and the exchange of information between systems. A nodal agency that will set policy and information standards and mandate the implementation of the standards and the exchange of information between systems. A standard e-GP Portal for a country. A standard e-GP Portal for a country. A standard e-GP System for a country/state. A standard e-GP System for a country/state.

March 26, 2008Fiduciary Forum4 To Move towards e-GP: e-GP Readiness Assessment [done in 4 countries] e-GP Readiness Assessment [done in 4 countries] e-GP System Assessment e-GP System Assessment e-GP Pilot e-GP Pilot Pilot Results Assessment Pilot Results Assessment Cleared for Use across Cleared for Use across

March 26, 2008Fiduciary Forum5 e-GP System Assessment Request for assessment could be for : Country/State e-GP system Agency/Department e-GP system Planned e-GP system

March 26, 2008Fiduciary Forum6 Steps: 1.DPS has the primary responsibility. 2.The System should be up and running and, preferably, is being used for govt. contracts for certain time. 3.Request Client for self assessment of the system. 4.Forward an ‘e-GP System Performance Assessment Questionnaire’ and request Client’s response. 5.Review self assessment and prepare for WB assessment. 6.Consultant carries out the assessment and then the country e-GP FP (+ DPS) join the consultant in the discussion with the Client. Share the Assessment Report with the RPM Office/OPCPR and decide on the result. 7.Convey the assessment result to the Client. Country/State e-GP Sys. Assessment

March 26, 2008Fiduciary Forum7 8.If ready for pilot under WB-funded Project(s), the DPS works with the Client and agrees on sample procurement packages for the pilot. 9. We prefer Pilot to be results oriented. And a set of performance indicators [Governance, Competitiveness, Effectiveness, Private Sector Confidence, System performance] are agreed with the Client. 10. Pilot Reporting 11. Assessment and Evaluation of Pilot. 12. Decision – Cleared for use in all Bank-funded projects!!!

March 26, 2008Fiduciary Forum8 Harmonization with ADB India office on:Harmonization with ADB India office on: Approach of e-GP system assessmentApproach of e-GP system assessment State vs agency e-GP systemState vs agency e-GP system e-bid vs dual bid submissione-bid vs dual bid submission Sharing of system assessment and pilot reportsSharing of system assessment and pilot reports GDLN sessions for sharing of international best practices.GDLN sessions for sharing of international best practices. CMU and Sectors on board on e-GP system acceptability requirements and our roles.CMU and Sectors on board on e-GP system acceptability requirements and our roles. E-GP Awareness Flyer (Quick Tips for TTLs)E-GP Awareness Flyer (Quick Tips for TTLs) E-GP Harmonization and Supporting Initiatives

March 26, 2008Fiduciary Forum9 Agenda e-GP Implementation Status in SAR Countries

March 26, 2008Fiduciary Forum10 E-GP activities initiated in Bangladesh since 2002.E-GP activities initiated in Bangladesh since Public Procurement Law supports e-GP.Public Procurement Law supports e-GP. CPTU of Bangladesh has an electronic portal for all public procurement related information and bidding opportunities.CPTU of Bangladesh has an electronic portal for all public procurement related information and bidding opportunities. PMIS has been developed and piloted in 4 target agencies.PMIS has been developed and piloted in 4 target agencies. e-GP Readiness Assessment and implementation strategy has been worked out at 2006.e-GP Readiness Assessment and implementation strategy has been worked out at e-GP is a component (US$ 4.5 M) of the PPRP II.e-GP is a component (US$ 4.5 M) of the PPRP II. Bangladesh

March 26, 2008Fiduciary Forum11 WB has completed assessment of the AP and TN and BWSSB (Karnataka) e-GP systems. Pilot to start in AP and BWSSB.WB has completed assessment of the AP and TN and BWSSB (Karnataka) e-GP systems. Pilot to start in AP and BWSSB. Discussion in progress with Karnataka and Assam to plan assessments; and with UP, HP, Orissa, Bihar and Punjab to develop e-GP implementation strategy as part of ongoing reform dialogue.Discussion in progress with Karnataka and Assam to plan assessments; and with UP, HP, Orissa, Bihar and Punjab to develop e-GP implementation strategy as part of ongoing reform dialogue. WB has supported MoF, through an NLTA, to work towards a strategy to promote e-GP in central ministries.WB has supported MoF, through an NLTA, to work towards a strategy to promote e-GP in central ministries. WB funded eBharat project is designed to address comprehensively the core issues relating to application of e-GP nation wide. Work has started in 3 states and central Health Ministry.WB funded eBharat project is designed to address comprehensively the core issues relating to application of e-GP nation wide. Work has started in 3 states and central Health Ministry. At the federal level, DGS&D, Indian Railways and National Informatics Center (NIC) are the key performers; and the Ministry of Commerce and Ministry of Finance are the lead agencies.At the federal level, DGS&D, Indian Railways and National Informatics Center (NIC) are the key performers; and the Ministry of Commerce and Ministry of Finance are the lead agencies. India

March 26, 2008Fiduciary Forum12 Afghanistan Reconstruction Development Services (ARDS) PU is the central agency to facilitate procurement services across the country.Afghanistan Reconstruction Development Services (ARDS) PU is the central agency to facilitate procurement services across the country. Public Procurement Law supports e-GP.Public Procurement Law supports e-GP. ARDS introduced IT-based Vendor Registration System more than 3 years back. It decided to expand the facility by introducing a user friendly, interactive and dynamic website on ARDS PU, leading to e-GP in 3 phases.ARDS introduced IT-based Vendor Registration System more than 3 years back. It decided to expand the facility by introducing a user friendly, interactive and dynamic website on ARDS PU ( leading to e-GP in 3 phases. Results so far: On date 75% of bidders access and download the bid documents online. Only 25 % are presently collecting bid documents manually.On date 75% of bidders access and download the bid documents online. Only 25 % are presently collecting bid documents manually. Total number of firms registered 3000 (Works: 2137, Goods:1837, Services:1779).Total number of firms registered 3000 (Works: 2137, Goods:1837, Services:1779). Daily average of ARDS website visitor: 80Daily average of ARDS website visitor: 80 Maximum Bid Documents for any project downloaded : 90Maximum Bid Documents for any project downloaded : 90 Afghanistan

March 26, 2008Fiduciary Forum13 Lessons Learned: Given the administrative/political structure of India, any eGP strategy needs to be evolutionary and include elements of capacity building at various levels of government as well as integration with ovearll PFM structures, which makes the task very challenging.Given the administrative/political structure of India, any eGP strategy needs to be evolutionary and include elements of capacity building at various levels of government as well as integration with ovearll PFM structures, which makes the task very challenging. Private sector has an important role to play.Private sector has an important role to play. India

March 26, 2008Fiduciary Forum14 Current status: GoP has carried out an assessment of its readiness at the federal level. Report yet to be finalized. GoP intends to seek Bank’s assistance in the way forward.GoP has carried out an assessment of its readiness at the federal level. Report yet to be finalized. GoP intends to seek Bank’s assistance in the way forward. E-GP readiness assessment is planned for Punjab.E-GP readiness assessment is planned for Punjab. Mission ahead to begin e-GP dialogue with Sindh and NWFP.Mission ahead to begin e-GP dialogue with Sindh and NWFP. Pakistan

March 26, 2008Fiduciary Forum15 Currently, the NPA publishes the following on-line: All procurement plans, IFBs and Notification of Awards for large contracts, SBDs for Goods, generic specifications for commonly procured goods and non-consulting services. Initial E-GP Readiness Assessment was done in A detailed assessment will be done under the proposed Public Financial Mgmt and Statistical Capacity Building project. E-GP is proposed to be introduced in phases, to begin with: Interactive single portalInteractive single portal Online registration, downloading of BDsOnline registration, downloading of BDs Online appointment of TECs, and monitoringOnline appointment of TECs, and monitoring Srilanka

March 26, 2008Fiduciary Forum16 Nepal: An e-GP Readiness Assessment was done in FY 07 and an Implementation Strategy has been developed in conformity with the overall procurement reform program.An e-GP Readiness Assessment was done in FY 07 and an Implementation Strategy has been developed in conformity with the overall procurement reform program. Nepal already has an e-GP system in place, which has not been used because of capacity and skill constraint.Nepal already has an e-GP system in place, which has not been used because of capacity and skill constraint. The Department of Roads (DOR) e-GP system has been allowed for pilot under a Bank funded Project, following an assessment.The Department of Roads (DOR) e-GP system has been allowed for pilot under a Bank funded Project, following an assessment. Based on the result of the DOR pilot, comprehensive efforts will be made to functionalize the existing country e-GP system, with the Bank’s assistance.Based on the result of the DOR pilot, comprehensive efforts will be made to functionalize the existing country e-GP system, with the Bank’s assistance. Nepal

March 26, 2008Fiduciary Forum17 Thank You!