Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8 Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon A whole new corridor of connectivity
With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors A whole new corridor of connectivity
And this is how Gurgaon will soon look, when the Expressway opens up The changing face of Gurgaon
Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors A catalyst of change and development
A result of years of planning, research and development by the best brains in real estate Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway Years of thought and planning
No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly No more toll! No more delays!
From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years Power cuts are history
Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch Exciting opportunities in Education
Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment Boom in Healthcare
All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!
18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed The widest road in the NCR
Constructed means black-topped and driveable The double yellow line indicates the constructed expressway Dwarka Expressway From Haryana From Delhi
Gurgaon - Manesar Urban Complex AD
800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved The Expressway today: The remaining 4 kms
On , HUDA announced a rehabilitation policy which was published in the Times of India The latest on the 2.5 kms under stay order
People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners As Per Policy Published on
Applicants had till to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months As Per Notice Published on
S.No. Chainage Length Clear Length Status Constructed / NOT Remarks Month of Handing Over FromTo Not ExecutedBuilt up Area Executed End of Dec Executed May Executed Dec Executed May Executed End April Executed End April Executed ClearWMM II CompletedMid August Not ExecutedStay on Land ClearWMM II CompletedMid August Executed End April 11 Actual availability of stretches (As per Actual Site condition)
S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo HSIIDC drain Executed Jan ExecutedReliance SEZ landJan Executed Feb Executed Pataudi Road Executed Executed End April Executed End April Not Executed/ROB ROB, Padmini Factory Executed Mid Sep Not ExecutedHUDA water sump house Executed Mid Sep 11
S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo One side executed RHS stay on land Executed Mid Oct Not ExecutedSTP Channel Executed Water logged area completed Last week of Jan Executed end April Executed Mid Oct Executed Mid Oct Executed Feb Not ExecutedNipon Factory Executed Feb Executed Nov Executed Nov Executed Nov Clear Slab approach is to be coming
Slab culvert over sewer channel is in progress by another contractor Work is stopped from last 2 month i.e on 6th Sep Executed ClearWMM 1st layer completed Not ExecutedNew Palam Vihar – R&R Not ExecutedNew Palam Vihar – R&R Not ExecutedNew Palam Vihar – R&R Not ExecutedNew Palam Vihar – R&R Executed 01-Mar Clear Stretch14,092 mtrs. S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo
Dwarka Expressway: The Delhi update
Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months Dwarka Expressway: The Delhi update
All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road! All obstacles soon to vanish
Strike while hot! (Average rate per sq ft)
Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion Besides, the best developers are building here
Glimpses of the Expressway
The golden road beckons Members of: