10-11 Sept 2007 JRA2 - Opticon FP6 MTR 1 JRA2 Report “Fast Detector for AO” Opticon Mid-Term Review chairman: Philippe Feautrier – INSU/CNRS.

Slides:



Advertisements
Similar presentations
Corfu 10/9/07 ( HTRA: ~ 100 ms -- 1μs ) - To develop the most promising technologies for HTRA - Assess relative strengths/areas of application in astronomy.
Advertisements

19-24 June 2005 Philippe Feautrier - SDW Zero noise wavefront sensor development within the Opticon European network Philippe Feautrier a, Thierry.
The Adaptive Optics Lucky Imager High-resolution imaging in the visible on large ground-based telescopes Jonathan Crass Institute of Astronomy, University.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Characterization of the OPA350 operational amplifier at cryogenic temperatures EMIR is an infrared multiobject spectrograph and imager for the Gran Telescopio.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
21/05/2010Fast detectors - Opticon Board Malta1. The conclusion of FP6 21/05/2010Fast detectors - Opticon Board Malta2.
June 2005 SDW Dedicated L3CCD for AO 1 Mark Downing, Norbert Hubin, Markus Kasper, Javier Reyes, Manfred Meyer, Dietrich Baade European Southern.
SDW2005, juin, Taormina The Corot Space instrument.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
 Johann Kolb, Norbert Hubin  Mark Downing, Olaf Iwert, Dietrich Baade Simulation results:  Richard Clare Detectors for LGS WF sensing on the E-ELT 1AO.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
1 On-sky validation of LIFT on GeMS C. Plantet 1, S. Meimon 1, J.-M. Conan 1, B. Neichel 2, T. Fusco 1 1: ONERA, the French Aerospace Lab, Chatillon, France.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Measurement Results Detector concept works! Flood fields show MCP fixed pattern noise that divides out Spatial resolution consistent with theory (Nyqvist.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Position sensing in Adaptive Optics Christopher Saunter Durham University Centre for Advanced Instrumentation Durham Smart Imaging.
Our Mission Visible detectors fully matching the requirements of Adaptive Optics wavefront sensors for 10m class telescopes do not yet exist: current detectors.
Edimburg June 2006 Fast detectors 1 Fast detectors (for E-ELT AO) Philippe Feautrier INSU/CNRS-LAOG.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
OPTICON is funded by the European Commission under Contract no RII3-CT Site Characterization of the Canarian Observatories: Different activities.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
1 1 st Light AO 4 LBT Pyramid WFS Adaptive Secondary MMT Unit.
Andreas Quirrenbach and the CARMENES Consortium Searching for Blue Planets Orbiting Red Dwarfs.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
1 Characterization of the T/T conditions at Gemini Using AO data Jean-Pierre Véran Lisa Poyneer AO4ELT Conference - Paris June , 2009.
ASTRONET Coordinating Strategic Planning for European Astronomy T HE N ETWORKING.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
Solar Physics within OPTICON O. von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Status and achievements of Opticon FP6 (+FP5) Gerry Gilmore coordinator.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
1 ASTRONET Coordinating strategic planning for European Astronomy.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
Dr. Filippo M. Zerbi OPTICON JRA6 Coordinator INAF- Osservatorio di Brera Via Bianchi, 46 I Merate (Lc) Italy Telephone:
Virtual Visits to Astronomical Observatories M. Serra-Ricart L. Martínez L. Cuesta Instituto de Astrofísica de.
A Search For New Planets Matthew Livas Science, Discovery, and the Universe Computer Science Introduction My capstone was to observe.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
Optical Detector Systems at the European Southern Observatory
WP2 – Definition of European DCA strategy EuroVO-DCA Final Review, 29 April 2009 Françoise Genova, Coordinator, WP2 lead WP2 Definition of European Data.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
Comparison of a CCD and the Vanilla CMOS APS for Soft X-ray Diffraction Graeme Stewart a, R. Bates a, A. Blue a, A. Clark c, S. Dhesi b, D. Maneuski a,
Building an ENI CBC project
Photon counting CCDs as wavefront sensors for LBT A.O. systems
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
LSST Camera Detector Status
WP12200: Instrumentation, measurements and modelling
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Observing with Modern Observatories (the data flow)
ASTRONET Coordinating strategic planning for European Astronomy
Optical Detector Systems at the European Southern Observatory
Presentation transcript:

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 1 JRA2 Report “Fast Detector for AO” Opticon Mid-Term Review chairman: Philippe Feautrier – INSU/CNRS

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 2 Content of this talk Who we are? What we do? Work Packages review Highlights of the JRA2 Schedule and comments Future plans for FP7 Conclusion

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 3 Who we are? European Community Opticon board WP2 Detector procurement Industrial partner Detector subcontract WP5 Detector testing WP1 JRA-2 Coordinator P. Feautrier WP3 Detector Controller WP4 Cryogenics

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 4 What we do ? JRA2 “Fast Detectors for AO” JRA2 “Fast Detectors for AO” Goal as defined in Annex I of the contract: “define, fabricate and fully characterize the best possible detector working at visible wavelengths for Adaptive Optics (AO) wavefront sensors.” “define, fabricate and fully characterize the best possible detector working at visible wavelengths for Adaptive Optics (AO) wavefront sensors.”

10-11 Sept 2007 JRA2 - Opticon FP6 MTR x40 SH subapertures x 6x6 pixels/sub-aperture  240x240 pixels. 2. Versatility: 100% fill factor / 240x240 square grid array of pixels that can be used with any type of WFS system; SH, curvature, or pyramid. that can be used with any type of WFS system; SH, curvature, or pyramid. 3. > 1.2 kHz frame rate to match the increased spatial sampling. Detector requirements 40x40 SH-WFS (mag~10, RON=1e-) 240x240 pixels Next Generation Systems Each Sub-aperture 6x6 pixels Present Systems 14x14 SH-WFS

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 6 Store Area Image Area 240x120 24µm Store Area Image Area 240x120 24µm OP 1 OP 2 Gain Registers OP 3 OP 4 Gain Registers OP 8 Gain Registers OP 7 OP 6 Gain Registers OP 5 The CCD 220 Design Metal Buttressed 2Φ 10 Mhz Clocks for fast image to store transfer rates. Store slanted to allow room for multiple outputs. Split frame transfer 8-output back-illuminated e2v-L3Vision CCD. 8 L3Vision Gain Registers/Outputs. Each 15Mpix./s.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 7 L3CCD with lower read noise wins Low read noise of EMCCD is clearly better for white-yellow guide star and better even for red GS if RON of Thick CCD > 2e. Conclusion low RON (~ 0.1e-) is better than higher red response. Reason e2v-L3 CCD was chosen. GS Magnitude. RON=5 RON=3 RON=2 EMCCD RON=0 Thick CCD Strehl ratio RON=5 RON=3 RON=2 EMCCD RON=0 Thick CCD Strehl ratio GS Magnitude.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 8 Funds and detector sub-contract CCD220 funds for the first contract with e2v: 700 k€ from Opticon JRA2, ~ 400 k€ from ESO internal funds. Contract signed between ESO and e2v after official call for tender, e2v UK is a sub-contractor, not a partner.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 9 The CCD220: firsts e2v CCD220 detectors provided

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 10 Test Camera controller is being built by a collaboration of French Observatories (LAM Marseille, LAOG Grenoble, and OHP Haute Provence): –It will be loaned to e2v for testing. –Very challenging design –To be delivered to e2v next month WP3 : Controller

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 11 WP4: mechanics and cryogenics This WP was delivered and is achieved Cooling specifications achieved

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 12 Cryogenics results

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 13 The OCam Test Camera OCam, the Test Camera of the CCD220, is the product of the WP3 + WP4:

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 14 The OCam story OCam will be duplicated for a lot of European places: –On loan to e2v for detector testing –OCam will be delivered to IAC (normal JRA2 plan), but also duplicated for ESO for their CCD220 testing facility. Free OCam license transfer between CNRS/INSU to help for ESO NGC development –But also implemented on the GTC… Very high probability of OCam license transfer to Andor Technology Belfast (UK) for commercial applications (Astronomy, WFS, medical imaging…): our mission is not to infinitely duplicate cameras. Good progress of negotiations.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 15 OCam on the GTC OCam will also be used, with the CCD200 on the GTC (Gran Telescopio Canarias), a 10.4 m segmented telescope in La Palma under contruction. Contract currently under negociation between CNRS (owner of OCam) and GTC (GRANTECAN telescope, La Palma) OCam + CCD220 will be used as WFS camera for the GTC AO system Schedule: signature of contract: autumn 2007, delivery ~ one year later

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 16 WP5: detector tests Detector Tests at Factory Tests under responsibility of the detector manufacturer (E2V) To verify basic operational parameters and detector characteristics. Defined in VLT-PLA-E2V _issue_3_TestPlan and testing equipement and facilities, according to VLT-SPE-E2V _issue_6_TestEquip_Req Detector Controller and Camera supplied by JRA2 Tests at IAC split in 2 main topics: Laboratory tests Telescope tests

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 17 Detector Tests in Laboratory Detector characterization facility will be available on time –All the equipment has been already acquired –Test Bench components are computer controlled –Variable monochromatic flat field source is now under calibration –Direct imaging targets are assessed IAC Test Objectives –Verification of IAC Test Bench performance with calibrated detector systems –Independent verification of all CCD220 factory test results –Additional tests with emphasis on: Long term gain stability Detailed assessment of unwanted charge generation and charge confinement problems (CIC, dark current, smear, PSF) and optimization of operational parameters Detector / Camera health check procedures

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 18 Detector Tests at IAC Telescope The tests will run in a Telescope, either at the Observatory of El Teide in Tenerife or at the Observatory of Roque de Los Muchachos on La Palma. Telescope/IAC Test Objectives –Verification of performances of the CCD220 as the detector of a wavefront sensor in a real situation –To include the CCD220 WFS within the very-low-latency IAC AO Real Time Controller, based on reconfigurable logic (FPGA), and test under real circumstances, at the telescope. Comparison with previous detectors. –To confirm the suitability of CCD220 for AO, measure system performances and give inputs for further developments. –AO Tests will be performed with science grade detectors, either on loan from ESO or bought by IAC with a new joint ESO/IAC contract for CCD220 detectors delivering.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 19 Detector Test Facility at IAC Detector Characterization Laboratory: –A group called LISA (Laboratory of Imaging and Sensors in Astronomy) has been created at the IAC to be in charge of detector testing and will characterize the CCD220. –LISA has a new general Detector Test Facility at the IAC complying with the requirements of the CCD220 test plan

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 20 LISA Test Bench at IAC

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 21 Status of deliverables and milestones (Month: 43)

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 22 Schedule: milestones and deliverables Achieved: Delayed: Management Detector Controller Cryogenics Tests

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 23 Schedule and delays: some remarks Schedule late, but this can be explained: Late arrival of funds at beginning of the contract (6/12 months)  has delayed activities where hardware/contracts are concerned. WP3 (controller) and WP4 (cryogenics) strongly dependent on final detector design (WP2), so did not start as early as expected Under-estimation of the time to deliver detector controller and cryogenics (extremely challenging development, critical path) All these dependencies explain the delay of the overall schedule, but this delay is under control. Main objectives of the JRA2 will not be affected and remain compatible with the Opticon FP6 schedule Some testing activities may run after formal end of the FP6 contract (i.e. in 2009). Should be also tested on the GTC!

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 24 FP7 proposal Edinburgh 07: " Fast detectors for E-ELT AO " JRA2 FP6: was dedicated to 2 nd generation of AO instrument for m class telescopes FP7: two needs for E-ELT AO WFS detectors identified: –LGS WFS detector: very large pixel format to sample spot elongation, high frame rate (700 Hz), low noise (~1 e). –XAO WFS detector: for a pyramid WFS, pixels are sufficient, but extremely high frame rate (3 to 4 kHz) and very low noise (~1 e) are required. ~ 5.5 years development ( ) 3.6 M€ eligible cost: clearly too much… De-scope to be done. For the proposed activity: at least ~ 3 European countries (Germany, Spain, France), 2 European institutions (ESO, IAC), ~ 3 laboratories (INSU/CNRS), 2 industrial partners. AO applications are strategic for E-ELT but this activity open to wider applications in the field of fast detectors.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 25 Conclusions Great succes of the JRA2 activity: –The CCD200 detector developed here by a European manufacturer (e2v UK) will be used by every AO system in Europe: ESO, IAC, GTC. And also probably in the US ! –The OCam test camera will be duplicated for a lot of European places: IAC, ESO, GTC –Products of this JRA will be re-used in the European astronomical community: OCam will help for ESO NGC development, OCam will be used as GTC wavefront sensor camera –Complete program of detector validation carried out by IAC on telescope, as foreseen at beginning of JRA2. –Strong probability for a commercial transfer license of OCam to Andor Technlogy (UK) Excellent partnership between the European laboratories/institutes/industry of the JRA2. Wish to continue during the FP7, same kind of applications in the framework of E-ELT development.

10-11 Sept 2007 JRA2 - Opticon FP6 MTR 26 END Many Thanks for Listening