With Ticon DCA, Copenhagen DC and Ace Global Evaluation of the International Trade Centre Funding Modalities and Organisational Aspects Presentation to.

Slides:



Advertisements
Similar presentations
KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
Advertisements

Moving the process forward Sálvano Briceño UN/ISDR.
Working Together for Greater UN Impact Repositioning the UN in a changing aid environment The case of Country xxx July 2005 Harmonization & Alignment to.
Delivering as One UN Albania October 2009 – Kigali.
ENHANCING AID EFFECTIVENESS
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Workshop on Sector Approaches in the Context of EU Integration Sarajevo, Bosnia and Herzegovina March 2010 Debriefing of the Workshop on Sector Approaches.
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
The International Trade Centre (UNCTAD/WTO) The International Trade Centre (UNCTAD/WTO)
“ONE UN”: Delivering as One at the Country Level.
How to build a sustainable framework for endogenous-led capacity development in the trade-related sector Phnom Penh, 5 February 2008 Fabio Artuso (
COST AND BENEFITS OF SIMPLIFYING AND HARMONIZING BUSINESS PRACTICES AT THE COUNTRY LEVEL UNITAR SEMINAR – February 22, 2012 Christian Schornich - Consultant.
Review of different stakeholders needs in relation to Joint Assessment of National Strategies and Plans (JANS) Preliminary Findings IHP+ Country Teams.
Role of RAS in the Agricultural Innovation System Rasheed Sulaiman V
Commonwealth Local Government Forum Freeport, Bahamas, May 13, 2009 Tim Kehoe Local Government and Aid Effectiveness.
Vietnam Country Programme Evaluation Presentation to the Evaluation Committee during their country visit to Viet Nam, 22 May 2013.
IFAD Reform towards a better development effectiveness How can we all do better? Mohamed Béavogui Director, West and Central Africa January 2009.
Session V: Programme Roles and Responsibilities
1 Katherine Sierra Vice President, Sustainable Development Network The World Bank April 14, 2008 Proposed Climate Investment Funds (CIFs) Recap.
Comprehensive M&E Systems
Lessons Learned for Strong Project Delivery & Reporting Sheelagh O’Reilly, Kristin Olsen IODPARC Independent Assessors for the Scottish Government IDF.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
1 THE UN IN A CHANGING WORLD: Update on UN reform Inyang Ebong-Harstrup, Associate Director UN Development Group Office.
Session 3 - Plenary on implementing Principle 1 on an Explicit Policy on Regulatory Quality, Principle 3 on Regulatory Oversight, and Principle 6 on Reviewing.
Presentation title goes here this is dummy text Joint Office : -What have we learned?- “Delivering as One” through Joint Programming and Joint Programmes.
Capacity Building for Better Agricultural Statistics Misha Belkindas and Graham Eele Development Data Group, World Bank.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
Disaster risk reduction – How did we get here?
Development partnership in the education sector Mokoro Seminar 24 January 2014.
Lessons from Ethiopia’s Productive Safety Net Programme & Aid Effectiveness.
Gender and Development Effectiveness. Entry points for Tanzania? DPG Main, 8 May 2012 Anna Collins-Falk, Representative, UN Women on behalf of DPG Gender.
Towards Greater Policy Coherence: Lessons from Mauritius Mr S. Puran Analyst Ministry of Finance Mauritius 27 OCT 2008.
Global Task Team: Improving AIDS Coordination Among Multilateral Institutions and International Donors Briefing for Theme Group on HIV/AIDS 1 November.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
1 S trengthening accountability for gender equality To learn more visit
February 21, JAS Consultation between the Government of Tanzania and Development Partners February 21, 2006 Courtyard Hotel, Dar es Salaam.
Institutional Arrangements for Adaptation Achala Chandani Researcher International Institute for Environment and Development european capacity building.
Informal JAG - 24 November ITC’s Comparative Advantage.
0 United Nations Capital Development Fund Summary of Strategic Partnership Between UNDP and UNCDF Moving Closer Together in the Context of the UNDP Strategic.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
United Nations Office of Funds and Programmes Cape Verde.
Towards Universal Access Scaling up HIV Prevention, Treatment, Care and Support: The Role of the United Nations.
Presented by CIDA on behalf of the Task Team on Multilateral Effectiveness.
Embassy of Sweden, Lusaka Working together for greater impact: Sweden’s collaboration with the Southern African Development Community (SADC) Francis Mangani.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
IFAD Reform towards a better development effectiveness How can we all do better? Mohamed Tounessi Bamba Zoumana Virginia Cameroon Retreat 4-5 November.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
With Ticon DCA, Copenhagen DC and Ace Global Evaluation of the International Trade Centre Overview, Key Findings, Conclusions and Recommendations Presentation.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
Informal JAG - 24 November ITC’s Management Response ITC’s Comparative Advantage Performance of Interventions Capacity of the organisation –Strengthening.
Bosna i Hercegovina Agencija za statistiku Bosne i Hercegovine Bosnia and Herzegovina Agency for Statistics of Bosnia and Herzegovina Donor coordination.
With Ticon DCA, Copenhagen DC and Ace Global Evaluation of the International Trade Centre Comparative Advantage of ITC Presentation to the Joint Advisory.
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
Joint Assistance Strategy for Tanzania (JAST) Poverty Policy Week Creative and Hard Work, the Key to Fighting Poverty Presentation by the Ministry of Finance.
Expanded “Delivering as one” funding window for achievement of MDGs Francesco Galtieri UN Development Operations Coordination Office (DOCO), New York JPO.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
SWA’s Role in Improving Aid Effectiveness in the WASH sector SWA Country Processes Task Team Geneva, November 2013.
“Delivering as One” through Joint Programming and Joint Programmes
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Claudia Uribe Colombian ambassador to the WTO
IHP+ First Steering Committee Meeting 15 January 2014
A year of progress on global and country coordination on PHC
Presentation transcript:

with Ticon DCA, Copenhagen DC and Ace Global Evaluation of the International Trade Centre Funding Modalities and Organisational Aspects Presentation to Informal Meeting of the JAG November 24, 2005 Allan Barry and Murray Smith Evaluation Core Team and Team Leader

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 2 Funding Modalities & Organisational Aspects Governance and Accountability Financing Modalities & Harmonisation Corporate Management and Capacity Supporting Trade and Development

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 3 Governance and Accountability Methodology Findings and Conclusions Recommendations

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 4 Methodology Analysis of documentation establishing ITC, its mandate, governance and oversight structures. Analysis of how structures have changed over time, their size, participation, nature of their role, input and output documentation, and effectiveness. Analysis of previous reviews and assessments of supervisory structures, and interviews with some of those participating.

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 5 Findings and Conclusions Basic weaknesses in current governance and accountability structure: Currently lacks either an expert advisory group or a small enough management body to provide adequate programme review or policy guidance. Absence of effective policy and programme review at level of ITC’s overall operations. Differing priority and accountability arrangements for different programme areas.

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 6 Findings and Conclusions Past experience provides: Substantial evidence of benefits that can be provided by a smaller and more expert group. Precedents and lessons that can be drawn on. Confirmation of feasibility of such a governance mechanism within framework of formal oversight by parent bodies.

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 7 Findings and Conclusions Changing circumstances include: Bilateral donors now provide half of ITC funding, including part of its operational base. The donor and beneficiary community has established increasingly clear priorities post- Monterrey on: Increased aid coherence, Measuring, monitoring and achieving results, Increased accountability for results.

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 8 Findings and Conclusions (2) This provides a strong case for reassessing supervisory and accountability structures for the agency. Such a mechanism would support a new ITC management team with a more effective body for dialogue, program review and results assessment. This need not detract from the important but different role played by the larger ‘board of governors’ type of intergovernmental body of the JAG

Governance and Accountability with Ticon DCA, Copenhagen DC and Ace Global 9 Findings and Conclusions (3) Burden of current oversight arrangements by parent institutions, in particular the UN, is excessive for a small organisation that is not operationally part of the UN Secretariat, and is not well-suited to ITC’s current needs.

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 10 Funding Modalities and Harmonisation Methodology Findings and Conclusions Recommendations

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 11 Methodology Analysis of: Nature of funding arrangements: regular budget and extra-budgetary resources. Changes in composition and level of resources. Programmes financed from different sources. Individual bilateral funding agreements and projects. Program-specific management or coordinating arrangements. Evaluation material on some of the programs, and interviews.

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 12 Findings and Conclusions Considerable progress in managing and simplifying a complex set of funding modalities. Still an overall lack of coherence, insofar as differing modalities do not provide an integrated program and budget that can be effectively reviewed, monitored and assessed by governments.

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 13 Findings and Conclusions (2) Significant further scope for reducing the use of earmarked funding other than in support of an agreed program such as GTF. ITC’s operations would be facilitated in terms of reduced transaction costs, with potential gains in efficiency and effectiveness of program operations if the share of extra-budgetary funding provided through GTF, in particular Window I, could be increased further.

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 14 Findings and Conclusions (3) Evidence of recent improvements in individual funding arrangements readiness of donors to envisage changes to strengthen program coherence and reduce transaction costs. Commitments in Rome and Paris Declarations to achieve greater harmonisation in donor financing provide a strong case for further improvement in funding modalities.

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 15 Findings and Conclusions (4) Harmonisation of donor-provided extra- budgetary resources and improved governance and accountability are closely related. Progress on harmonisation is likely to require steps to strengthen governance structure and provide for review of an integrated program and budget.

Financing Modalities and Harmonisation with Ticon DCA, Copenhagen DC and Ace Global 16 Findings and Conclusions (5) Greater use of multi-year commitments, and early availability of promised funding, would allow more effective programming and likely enhancement of results. A single fiscal year for all ITC operations, and development of an integrated program and budget document, for review by contributors and beneficiaries, would provide a better basis for consideration of an overall harmonised approach to extra-budgetary funding.

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 17 Implementing Harmonisation Increased harmonisation of donor support should be undertaken as a priority with the objective of reducing transaction costs and further improving overall program coherence and effectiveness. If possible, this should be in the form of a Program-Based Approach (PBA)

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 18 Program-Based Approach (PBA): Key Elements An integrated program and budget document, with a structured medium-term strategy, to facilitate an assessment of tradeoffs and relationships between different activities. A results-based management framework that reflects the needs of the organisation and is responsive to requirements of sources of funding. An overall program review body, representative of both donors and beneficiaries.

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 19 Implementing Harmonisation (2) Consideration should be given to greater use of multi-year commitment authority and reduction of late availability of funding authority for the year or years in question. Steps should be taken to facilitate a harmonised approach, in particular movement to a single fiscal year for all ITC operations, and preparation of an integrated program and budget document covering all ITC operations.

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 20 Strengthening Governance & Accountability Governance and accountability structures should be re-examined, with a view to providing a smaller and more effective mechanism for overall program review and policy guidance. Such a mechanism should complement and support the existing Joint Advisory Group. It should also replace some existing mechanisms such as Consultative Committee of GTF.

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 21 Strengthening Governance & Accountability (2) Any such new arrangement should be relatively small and representative of both donor governments and different geographic groupings of beneficiary governments. Interested governments should establish a process for initial review of the governance structure and further steps for greater harmonisation of donor support.

Recommendations with Ticon DCA, Copenhagen DC and Ace Global 22 Strengthening Governance & Accountability Current overload of technical oversight mechanism appropriate to UN secretariat bodies should also be reviewed.

with Ticon DCA, Copenhagen DC and Ace Global Evaluation of the International Trade Centre Capacity of the Organisation Presentation to the Joint Advisory Group November 24, 2005 Murray Smith, Team Leader

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 24 Capacity of the Organisation Monitoring systems differ for Regular Budget and Extra-budget ITC is at an early stage of implementing RBM Self-Evaluation is effective but is linked to operational management at present ITC programming is in line with its comparative advantage; newer programming draw on ITC’s experience and capacity for networking of TSI partners

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 25 Strengthening Operational Performance More systematic needs assessment and measuring unit costs including backstopping Monitoring of utilisation of products and results achieved Managing for Development Results (MfDR) is best addressed by more emphasis on country-specific projects in the portfolio of projects

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 26 Strengthening Operational Performance ITC should implement a change management strategy Implementing RBM should be a high priority Monitoring of results will require TSIs to measure results achieved in terms of capacity building for TSIs and especially Greater emphasis on strategic HR, professional development and gender balance

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 27 Supporting Trade and Development ITC should utilise an “MDG” lens to integrate development goals including ITC should explore innovative programmes for the informal sector and women entrepreneurs ITC should work with TSI partners to develop performance standards, monitor results achieved and increase sustainability of TSIs

Evaluation of the International Trade Centre with Ticon DCA, Copenhagen DC and Ace Global 28 Supporting Trade and Development (continued) Sustain co-operation with UNCTAD and WTO Explore new development partnerships Options to strengthen field presence should be explored Greater emphasis on country-specific projects If key management and institutional reforms can be implemented, the scale of ITC programming should be increased