Chapter 6 Job Costing. 6-2 Learning Objectives 1. Explain what job and job shop mean.2. Assign costs in a job cost system. 3.Account for overhead using.

Slides:



Advertisements
Similar presentations
Copyright © 2008 Prentice Hall. All rights reserved 3-1 Job Costing Chapter 3.
Advertisements

Tracking Product Costs with Job Costing Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 34.
Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A.,
Fundamentals of Cost Accounting, 4th edition Lanen/Anderson/Maher
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product.
Systems Design: Job-Order Costing 11/09/04
Akumulasi Harga Pokok Penuh Berdasarkan Pesanan (Job-Order Costing) Pertemuan 3.
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hill Types of Costing Systems Used to Determine Product.
CHAPTER 15 Job Order Costing & Analysis. Cost Accounting Systems determine the costs associated with products (or services). ________ Cost System (this.
Job Order Costing and Analysis
Job Costing Chapter 7 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
Managerial Accounting
Chapter 2 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Systems Design: Job-Order Costing.
Chapter 2 Systems Design: Job-Order Costing. © The McGraw-Hill Companies, Inc., 2005 McGraw-Hill /Irwin Process and Job-Order Costing Process Costing.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Cost of Goods Reporting Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 33.
REVIEW of Chapter 14. Completed products for sale. Materials waiting to be processed. Can be direct or indirect. Partially complete products. Material.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Job Order Cost Accounting Chapter 19.
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 4 Professor Jeff Yu.
Systems Design: Job-Order Costing
3 Chapter Three Product Costing and Cost Accumulation in a Batch Production Environment.
Financial and Managerial Accounting John J. Wild Third Edition John J. Wild Third Edition McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies,
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Systems Design: Job-Order costing Chapter 3. © The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw-Hil2 Types of Costing Systems Used to Determine Product.
McGraw-Hill/Irwin 3-1 Product Costing and Cost Accumulation in a Batch Production Environment 3 Chapter Three.
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 19 Job Order Costing.
PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor of Accounting Bryant University © Copyright 2007 Thomson South-Western, a.
Cost Accounting Systems
Fundamentals of Product & Service Costing
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Three Systems Design: Job-Order Costing.
JOB ORDER COST ACCOUNTING
Prepared by Diane Tanner University of North Florida Chapter 4 Job Costing Concepts.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 3 Cost Accumulation for Job-Shop & Batch Production Operations.
Lecture 6 COSTING SYSTEMS 1 Job Costing Reference : Course Text Chapter 2.
11-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Is it a complex process for Washburn Guitars to accumulate the cost of each Maya Series guitar? 1.Yes 2.No.
1 Chapter 17 Job Costing and Overhead Allocation (omit pp )
CHAPTER 3 Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3: Product Costing and Cost Accumulation in a Batch Production.
ACTG 3310 Chapter 7 - Job Costing. Job Costing Must be able to identify product/service Set up each individual product/service as a “job” Jobs serve as.
Job Costing Chapter 7 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition Copyright © 2011 by The McGraw-Hill.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 Product Costing: Job Order Costing Chapter 4 Objectives:  Explain the types.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Product Costing and Cost Accumulation in a Batch Production.
Traditions and Innovations
Systems Design: Job-Order Costing Chapter 3. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Types of Costing Systems Used to Determine Product.
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
Accounting for Manufacturing Overhead
Chapter Three Job-Order Costing. 3-2 Types of Product Costing Systems Process Costing Job-order Costing  A company produces many units of a single product.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
A control account is a summary account within a general ledger that accumulates the details of an account in a subsidiary ledger.
Chapter 2 – Job Order Costing and Analysis
Chapter 2 – Job Order Costing and Analysis
Job-Order Costing: A Microsoft Excel-Based Approach
Job-Order Costing: Cost Flows and External Reporting
Prepared by Debby Bloom-Hill CMA, CFM
Chapter 3 Costing Systems: Job Order Costing
Job-Order Costing: Cost Flows and External Reporting
Systems Design: Job-Order costing
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Job Costing 1 1.
Job Costing Concepts ACG Prepared by Diane Tanner
2 Job Order Costing Learning Objectives
Job Order Costing and Analysis
Chapter 2 Classifying Costs
Job Costing, Overhead Calculation and Flow of Costs
Chapter 17 Job Order Costing Student Version
Presentation transcript:

Chapter 6 Job Costing

6-2 Learning Objectives 1. Explain what job and job shop mean.2. Assign costs in a job cost system. 3.Account for overhead using predetermined rates. 4.Apply job costing methods in service organizations. 5.Describe the difference between jobs and projects.

6-3 Job Costing L.O. 1 Explain what a job and job shop mean. Job Cost object that can be distinguished easily and for which a cost is desired Job shop Firm that produces jobs Job cost sheet Record of the cost of the job kept in the accounting system

6-4 Job Costing Continued Subsidiary ledger account Control account Account that records financial transactions for a specific job Account in the general ledger that summarizes a set of subsidiary ledger accounts Job 1 WIP Job 2 WIP Job 3 WIP Work-In-Process

6-5 The Cost of A Job L.O. 2 Assign costs in a job cost system. Suppose Room With a View (RWV) builds custom homes. Room With a View Job Cost Sheet SubdivisionDate Initiated Date Completed Lot Direct MaterialsDirect LaborManufacturing Overhead Req. No.AmountTicketHoursAmountHoursRateAmount Cost Summary Direct Materials DateNumberBalance Direct Labor Manufacturing Overhead Total Cost 10 May 15, 200XLa Cresta

6-6 The Cost of A Job Continued MaterialsWork-In-Process Direct Materials Indirect Materials Raw Materials Overhead Total WIP Lot 10 Lot 12 Lot 14

6-7 The Cost of A Job Continued LaborWork-In-Process Direct Labor Indirect Labor Labor Overhead Total WIP Lot 10 Lot 12 Lot 14

6-8 The Cost of A Job Continued OverheadWork-In-Process Overhead OH costs applied to each job using the POHR. Lot 10 Lot 12 Lot 14 Total WIP

6-9 Recording OH L.O. 3 Account for overhead using predetermined rates. Predetermined Overhead Rate (POHR) Estimated overhead $ Estimated allocation base RWV $900,000 $1,200,000.75/DM$ Direct Material Costs

6-10 During June RWV worked on three homes, Lot 10, 12 and 14. On June 1 RWV had one home, Lot 10, in process with costs of $255,000. Let’s record June activities for RWV. WIP Lot 10 6/1255,000 RWV’s Job Cost System

6-11 Room With a View RWV purchased $100,000 of Raw Materials on account. RM Inventory 100,000 Accounts Payable 100,000

6-12 Room With a View Used $10,000 materials for Lot 10. Started Lots 12 and 14 and used $40,000 and $30,000 respectively. Used $20,000 indirect materials. Raw Materials WIP Lot 10WIP Lot 12WIP Lot 14Overhead 100,000 10,00040,00030,00020,000

6-13 Room With a View Incurred labor of $62,000. $10,000 for Lot 10, $30,000 Lot 12, $20,000 Lot 14 and $2,000 indirect labor. WIP Lot 10WIP Lot 12WIP Lot 14 10,00030,00020,000 OverheadWages Payable 2,00062,000

6-14 Room With a View Recorded depreciation of $30,000 and incurred other indirect costs of $15,000 on account. Overhead Accumulated Depreciation Accounts Payable 45,000 30,00015,000

6-15 Room With a View Applied overhead for June based on the POHR. WIP Lot 10WIP Lot 12WIP Lot 14Overhead 7,50030,00022,500 60,000.75/DM$

6-16 Room With a View Sold Lot 10 for $550,000. Cash 550,000 Sales Revenue COGS 282,500 WIP Lot 10 7, ,000 10,000 Record sale 550,000 Record COGS 282,500

6-17 Room With a View At June 30 Lot 12 is completed but not sold. WIP Lot 12 40,000 30,000 FG Lot ,000

6-18 Room With a View Accounts at June 30 WIP 72,500 COGS 282,500 Finished Goods 100,000 Lot 10 Lot 12Lot 14

6-19 The excess of actual overhead costs incurred over applied overhead costs The excess of applied overhead costs over actual overhead costs incurred Over and Under Applied Overhead Underapplied Overhead Overapplied Overhead

6-20 Ending Balance in MOH Accounts Not a balance sheet account Ending balance must be ZERO Ø Overhead 60,00020,000 2,000 45,000 67,00060,000 MOH underapplied $7,000

6-21 Ending Balance in MOH Accounts Charge underapplied overhead to cost of good sold. Overhead 60,00020,000 2,000 45,000 COGS 7,000

6-22 Room With a View Accounts at June 30 WIP72,500 COGS$282,500 Finished Goods100,000 % of total Total$455, % 62.1% 22.0% 100% Costs

6-23 Ending Balance in MOH Accounts Allocate underapplied overhead to finished goods, cost of good sold and WIP. Overhead 60,00020,000 2,000 40,000 7,000 WIP 72,500 COGS 282,500 Finished Goods 100,000 4,347 a 1,540 b 1,113 c a 7,000 x.621 b 7,000 x.220 c 7,000 x.159

6-24 Ending Balance in MOH Accounts Not a balance sheet account Ending balance must be ZERO Ø Overhead 60,00020,000 2,000 45,000 67,000 7,000 Ending balance equals zero

6-25 Normal, Actual and Standard Costing Normal Actual Standard Cost of job determined by actual direct material, actual direct labor and applied overhead using the POHR and the actual allocation base. Cost of job determined by actual direct material, actual direct labor and applied overhead using actual overhead rate and the actual allocation base. Cost of job determined by standard (budgeted) direct material, standard direct labor and applied overhead using the POHR and a standard (budgeted) allocation base.

6-26 Service Organization L.O. 4 Apply job costing methods in service organizations. JobClient Direct Labor Indirect Labor Labor Overhead WIP Client A Client B Client C Total WIP

6-27 Job Managing Projects L.O. 5 Describe the difference between jobs and projects. Project Complex job that spans several periods and requires the work of many different departments, divisions, or subcontractors Cost object that can be distinguished easily and for which a cost is desired

6-28 Managing Projects Example Project A WIP Project B WIP Project C WIP Road Construction One job; several projects.

6-29 Chapter 6