1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

1 HBD Update Itzhak Tserruya DC meeting, April 9, 2008 April 9, 2008.
HLT & Calibration.
Beam Position Monitors MICE CM Harbin January, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
1 TPC online  offline calibration November 2002.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Calorimeter Status Electronics Installation and Commissioning
The Silicon Drift Detector of the ALICE Experiment
Power pulsing of AFTER in magnetic field
HLT & Calibration.
Large CMS GEM with APV & SRS electronics
Maki KUROSAWA VTX Group 2014 Feb 20
On the Prototype beam test: (I) Noise and signal extraction
Technische Universität München
Presentation transcript:

1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006

2 Pre-beam commissioning (I) October 3: cooldown starts on Dec. 1 st and that we will not see collisions before Jan. 1 st, Present situation: cooldown starts on Jan 2 nd and we will not see collisions before Feb. 1 st. Pre-beam commissioning status: done  in progress  to be done the two detectors installed all cables (signal, HV and LV) connected Gas recirculation system operational  Gas monitoring system – Bob/Craig  UV lamp monitoring -- Sasha/Tom/Craig  readout electronics operational & take data in stand-alone mode – Chi  HV software fully operational – Deepali/Takao

3 Pre-beam commissioning (II) noise optimized  dead channel count  pedestal runs done routinely  timing and data taking with pulser done routinely  data taking with UV-lamp – Sasha/Tom/Craig  ADC charge calibration for all detector modules  first order zero suppression -- Maxim  Monte Carlo simulations basic Geometry and materials in reconstruction up to the pad response  3d map in +- configuration  cluster reconstruction  tracking to HBD

4 Pre-beam commissioning (III)  HBD online monitoring, including: Event display: pad response  Event display: cluster response  Pulse height distribution of a detector modules  Pad frequency vs. pad number  Cluster size distribution  Cluster pulse distribution  Tracking in the +- field 3d field map Very good progress over the last two months in spite of QM and we still have about 2 months to complete this program. I think it is doable in this amount of time.