E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
HL-LHC: UPDATE ON MAGNETS
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
General Considerations for the Upgrade of the LHC Insertion Magnets
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
Thursday Summary of Working Group I Initial questions I: LHC LUMI 2005; ; ArcidossoOliver Brüning 1.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
FCC week March 2015 Marriott Georgetown Hotel D2 for FCC P.Fabbricatore INFN Genova D2 for FCC P.Fabbricatore & S.Farinon INFN Genova Presented.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
J.P. Koutchouk, L. Rossi, E. Todesco A phase-one LHC luminosity upgrade based on Nb-Ti J.P. Koutchouk, L. Rossi, E. Todesco Magnets, Cryostats and Superconductors.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
E. Todesco HL LHC LAYOUT FROM Interaction POINT TO SEPARATION DIPOLE E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CERN, 11th November 2011 Hi-lumi meeting
MQXC Nb-Ti 120mm 120T/m 2m models
SLHC –PP WP6 LHC IR Upgrade - Phase I.
The R&D programme on High Field Magnets (HFM)
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
HIGH LUMINOSITY LHC: MAGNETS
Beam-Induced Energy Deposition Studies in IR Magnets
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
EIC Accelerator Collaboration Meeting
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
Task 2.3 Particle simulations studies
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Review of Quench Limits
Presentation transcript:

E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet, L. Rossi, P. Wanderer, R. V. Weelderen CERN, 15 th April 2011 High Luminosity LHC Design Study: kick-off meeting

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 2 TASK LIST 1. Communication and management 2. Nb 3 Sn quadrupoles 3.Separation dipoles 4.Cooling 5.Miscellaneous

E. Todesco 15 th April 2011– HL-LHC Design study: Magnets - 3 TASK 2 – Nb 3 Sn quadrupoles Task Objectives Finalize the requirements for the HL-LHC inner triplet Nb 3 Sn quadrupole Analyze the performance of existing Nb 3 Sn models, in particular LARP HQ quadrupoles Conceptual design of the final aperture option (135 mm ? 150 mm ?) Task description This task is intended to give a final assessment of the possibility of using Nb 3 Sn quadrupoles for the LHC inner triplet and the performance parameters that can be achieved. A tentative layout with a 120 mm aperture quadrupole is given from WP2, and the necessary full list of requirements (field quality, radiation resistance, integration in the machine) should be worked out. A comparison with the present performance of the 120 mm aperture short model (HQ) magnets of LARP should be done, and iterations on the design if needed should be carried out. In particular we plan to analyze the following issues: (i) radiation resistance of all components (ii) magnet field quality and the possibility to apply corrections using magnetic shims (iii) option of splitting the magnet into two coils, with a related estimate of the loss in performance, possibly complemented by a hardware test, (iv) design of a helium containment vessel compatible with a magnet structure based on aluminum shrinking cylinder (v) magnet protection). This task will be mainly driven by LARP collaboration (BNL, FNAL and LBL). LASA will lead the quench protection study.

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 4 TASK 2 – Nb 3 Sn quadrupoles Deliverables M48 Report on design study of the Nb 3 Sn inner triplet Milestones M12 Requirements for Nb 3 Sn inner triplet and comparison with present status of the art (to be started asap) M24 Study of magnetic shimming in HQ M36 Study of minimal distance between two coils in a cold mass Relation to other WP Inputs from WP2. Moreover, this task feeds directly back to WP2 (e.g. required space for eventual absorber inserts at regions with higher losses etc which have an impact on the detailed IR layout). Task leader: G. Luca Sabbi

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 5 TASK 2 – NEWS Latest news about HQ This is the LARP Nb 3 Sn 120 mm aperture quadrupole – testbench for checking all the requirements for going in the machine First assemblies had electrical problems (shorts) et al. Fourth assembly tested a few days ago: started at 80% of short sample, and reached 86% after 10 quenches Nominal MQXC Latest news on HQ training [S. Caspi, April 2011]

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 6 TASK 2 – WISHES The aperture is the crucial parameter for us 120 mm aperture models are being built (Nb-Ti and Nb 3 Sn) 150 mm proposed We should take a decision before the end of this year Even if not all information from beam dynamics is available Otherwise we will stay with 120 mm Optimal aperture for the LHC triplet versus time

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 7 TASK 3 – SEPARATION DIPOLES Task Objectives Conceptual design of separation dipoles according to the specifications given by WP2 using either Nb 3 Al or Nb-Ti. If a model is built, specify and follow-up the tests needed for assessing the design. Explore the possibility of using separation dipoles to create doglegs to increase the beam separation, thus allowing the installation of non-compact crab cavities. Task description For the D1 we propose considering Nb 3 Al or Nb-Ti conductor. For the D2 the Nb-Ti option only is considered. Main issues as (i) field quality, (ii) peak stresses at operational field, (iii) integration in the machine, (iv) radiation resistance (v) magnet protection will be analysed. 2 nd step: short model to assess the Nb 3 Al technology. 3 rd step: follow-up the construction of the model, contributing to the test definition and to the analysis of the test results. A similar type of technology would allow to further separate the LHC beams from the nominal distance of 194 mm to a wider one (400 to 500 mm). This task is lead by KEK for the Nb 3 Al part and by BNL for the Nb-Ti option. LASA will steer the studies on protection

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 8 TASK 3 – SEPARATION DIPOLES Deliverables M48 Report on design study of the separation dipoles Milestones M12 Requirements for separation dipoles M24 Conceptual design of Nb 3 Al and Nb-Ti separation dipoles M36 Conceptual design of a crab cavity dogleg Relation to other WP Inputs from WP2 and WP4. The task results feed also back to WP: the final length for the dipole magnets will impact the space available for local Crab Cavity installations and potential installations for the compensation of long-range beam-beam interactions. Task leader: T. Nakamoto & P. Wanderer

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 9 SEPARATION DIPOLES NEWS KEK already sent Proj. Ass. (Q. Xu) At CERN since 1 March, preliminary work on separation dipole Analysing apertures from 120 to 180 mm with parametric approach Coil width from 10 to 30 mm Two cases studied in detail Margin: I would propose to stay at 67% of loadline Preliminary study on 180 mm aperture D1 [Q. Xu]

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 10 TASK 4 – COOLING Task Objectives Choose the operational temperature of the inner triplet quadrupoles and of the separation dipoles. Consider and compare both the superfuid and supercritical He options. Task description The cooling system of the Nb 3 Sn inner triplet can operate either in superfluid (i.e., below 2.17 K) or in supercritical helium (i.e., above 2.17 K). Contrary to Nb-Ti magnets, Nb 3 Sn can operate in supercritical helium at around 4.5 K with a limited loss in field gradient w.r.t. the superfluid option (about 10%). This would also solve the Nb 3 Sn conductor instability issues that have been found by the US colleagues during the last decade. As the heat loads envisaged today are more than one and a half order of magnitude above what is prevalent in the previous accelerators magnets designed for operation at supercritical helium (RHIC, HERA, Tevatron), it is mandatory to address the problem of cooling from the very beginning of the design of future quadrupoles. Both the supercritical and the superfluid options should be analysed and compared. The program can be divided into different phases: (i) analysis of heat loads and status of the different cooling scenarios (ii) principle of heat removal system, thermohydraulic simulations and first experiments (iii) validation of the system. A similar study should be carried out for the separation dipoles. This task is steered by CERN for the superfluid part and by CEA-Grenoble for the supercritical part.

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 11 TASK 4 – COOLING Deliverables M48 Report on design study of the cooling Milestones M18 Study of the supercritical He cooling M36 Study of the superfluid He cooling Relation to other tasks and WP Relation to tasks 3.2 and 3.3, and inputs from WP2. Task leader: R. Van Weelderen

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 12 TASK 5 – MISCELLANEOUS Task Objectives Design a two-in-one quadrupole for the outer triplet (Q4-Q6) with nominal beam separation (192 mm) and aperture as large as possible ( mm), satisfying the electromagnetic and mechanical requirements. Design of a two-in-one quadrupole for the inner triplet in the case of a dipole first option. Review the Nb-Ti option for the inner triplet considering the new targets in luminosity, and follow-up the tests of the short model built within the SLHC-PP program. Analysis of the expected lifetime of resistive quadrupoles in IR3 and IR7. Study of possible solutions for the time scale of 2030 with in integrated radiation of 3000 fb -1, both resistive and superconductive.

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 13 TASK 5 – MISCELLANEOUS Task description This task includes three different studies: The conceptual design of a large aperture two-in-one quadrupole for the outer triplet. The present baseline of the LHC involves 70 mm aperture magnets (MQY) whose aperture could be a bottleneck. One should explore the possibility of having two-in-one quadrupoles with apertures in the range mm, with the same constraint of the 194 mm beam separation. Electromagnetic and mechanical aspects should be analysed. This design also applies to the option of a two-in-one inner triplet in the option of a dipole first option. This subtask is steered by CEA-Saclay. The analysis of the expected lifetime of the resistive quadrupoles used in the cleaning insertion (MQWA and MQWB). The first step is to have an estimate of the radiation load, together with the lifetime of the present hardware. Then solutions to extend the lifetime of present hardware up to 2030 or options to replace them will be analysed. This subtask is steered by CERN (TBC). The Nb-Ti option for the inner triplet is the plan B in case that experience shows that the Nb 3 Sn technology is not suitable. A considerable work has been done in the SLHC-PP framework, i.e. the so- called phase I, which aimed at a peak luminosity of 2.3  cm -2 s -1. A short model is being built. One has to check that the Phase I scenario and lay-out is compatible with the new targets of the HL-LHC. This subtask is steered by CERN (TBC).

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 14 TASK 5 – MQXC NEWS First coils wound Press under commissioning Collaring test coming one month Assembly in summer 2011 Test end of the year Warning Aperture decided July 2008 First test end years for a well-known technology!! Follow-up of construction Field quality! Check design vs new requirements

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 15 TASK 5 – MISCELLANEOUS Deliverables M48 Miscellaneous issues in magnet design Milestones M18 Review of the Nb-Ti option for inner triplet for new peak and integrated luminosity targets M36 Analysis of options for quadrupoles in cleaning insertions M36 Study of two-in-one quadrupoles for outer triplet Task leader: J. M. Rifflet

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 16 OTHER REQUIREMENTS FROM WP2 What is missing Nested orbit corrector Project in progress: imagined for Phase-I, to be checked for new scenario Option of a magnetic TAS (either with dipole or quadrupole magnets) Options of a D0 design integrated in the detectors SC corrector magnet packages in the triplet assembly

E. Todesco 15 th April 2011 – HL-LHC Design study: Magnets - 17 PARTNERS EU: CEA Saclay (Fr) – Magnet design CEA Grenoble (Fr) – Supercritical cooling system LASA INFN Milano (It) – Magnet protection World LARP: FNAL, BNL, LBL (Us) – Nb 3 Sn quadrupoles BNL (Us) – Separation dipoles in Nb-Ti KEK (Jp) – Separation dipoles in Nb 3 Al