COLD FRONT END Stephen Muchovej Caltech. CONSIDERATIONS RF System Itself Physical Considerations Packaging Mounting.

Slides:



Advertisements
Similar presentations
Feedback Control Dynamically or actively command, direct, or regulate themselves or other systems.
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
30-meter cabin refurbishment for a large Field Of View: status of on-going study S.Leclercq 28/04/2008.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
COLD FRONT END STATUS. OUTLINE RF Cryo System Mounting Apparatus 27-m cryo upgrades.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Chapter 33 Charging System Fundamentals.
1 숙명여자대학교 지구환경연구소 Ground-Based Microwave Observation of Stratospheric Ozone April 3, 2003 Jung Jin Oh Sookmyung Women’s University Seoul, South Korea.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
STARLight PDR 3 Oct ‘01 L. van Nieuwstadt Receiver - Page 1 STARLight Objective To design, build and test RF front end receiver as small as possible, meeting.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Ch7 Operational Amplifiers and Op Amp Circuits
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
1 Business Development (Service). What is DTH How DTH works How DTH works Type of DTH Connections Type of DTH Connections Advantages of DTH Advantages.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Namaste Project 3.4 GHz Interference Study Preliminary document - Work in Progress updated The intent of this study is to collect data which may.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/16/2012OVSA Preliminary Design Review.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
FIFO 64KX9 FIFO 64KX9 CLOCK D/A Converter 10 bit D/A Converter 10 bit Up-Converter LO Down ConverterIntegrator To DAQ Card 9 Bit Basic Schematic of.
Abstract The purpose of this project is to create a fully functional 8.5 meter radio telescope which can receive signals at a frequency of 1.42 GHz. The.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Codan 5700 Series C-Band Transceiver Technical Overview.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Thoughts on the Design of a WVR for Alan Roy (MPIfR) the Twin Telescope at Wettzell.
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MULTI-FREQUENCY OBSERVATIONS USING MULTIFEED SYSTEMS ALESSANDRO ORFEI, INAF-ORA (IRA) (Istituto Nazionale di Astrofisica-Osservatorio di Radioastronomia)
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
Q, Ka, K, Ku & X-Band Receivers
CRYOGENICS Stephen Muchovej Caltech.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Defining the volumes and functions of the cryogenic suspension Discussion guidance Kashiwa October JGW-G
Rick PerleyEVLA Feeds CDR 17 February Performance of the L-Band Feed Rick Perley.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Introduction to JEM/SMILES
Cosmic Microwave Technology, Inc.
Matt Morgan National Radio Astronomy Observatory
Green Bank Telescope Mark M. McKinnon
WP02 PRR: Master Oscillator and RF Reference Distribution
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
TB8100 Technical Training July 2005
Present status of the laser system for KAGRA
Rick Perley National Radio Astronomy Observatory
Terry Cotter LO/IF Group Leader
Feed & Front End PDR—Sys. Reqts
EVLA Advisory Panel Mtg. System Overview
Instrument Overview Larry Springer HMI Program Manager
Gunter Neugebauer VE7CLD
System Specifications Lab Tests
Presentation transcript:

COLD FRONT END Stephen Muchovej Caltech

CONSIDERATIONS RF System Itself Physical Considerations Packaging Mounting

RF System Requirements Noise temps of < 50K from 1-18GHz 1% Amp Stability, 1 degree phase stability Polar accuracy: 15 dB isolation Ready in Fall – completely done by Summer 2013

RF System Note: amp symbols are reversed.

Horn Considerations - Spillover

Horn Considerations - Cooling

Possible Solution Well-matched optics Low spillover Free Design …only operates over factor of 6 in frequency. Means we have to split the system

Telescope Focus Point 2m in front of platform. We can put the two systems side- by-side, and cool all components in a single dewar.

Features Better system temp ( <50K across whole band ) Perfect beam matching between two systems. Lateral translation between 2 systems. Need 15cm Vertical Translation between two feeds. Needs to rotate to calibrate smaller dishes.

Mount Proposal Replace the mechanism up there with a full, self-contained system that bolts onto the ring platform. Uses tracks for linear (and vertical -- focus) translations with actuators. Uses a gear for rotation Install whole rx system at once Adjust y once on installation

Mount Proposal Replace the mechanism up there with a full, self-contained system that bolts onto the ring platform. Allows for rotation and translation

Prime Focus Inventory Rx and cryo lines. Temp Controlled (TECA) box with: Bias for amps Temp Stable noise source Temp monitoring RF switch Pre-amp module RF-optical converter Ethernet Switch Ethernet controllable power supply Small computer to control Noise Diode, Bias, and Alignment jig (rotation, x, and z)

Timeline Other people involved are Tomi Hovatta (most machining) and Russ Keeney March-Mid May: Component Selection and Costing, Rx Design, and Support Jig Design May 15: Order RF components, Quotes on Machining (that won’t happen here) May-July: Machining (Jig, horns, cryostat), control subsystem development August-September: Rx construction, Mechanical testing of Jig, Rx Testing October: Buffer Month. Nov-Dec: Installation/Commissioning

Still to define 1.Communications between small computer and control system 2.Amount of focus shift in pointing the telescope 3. Tolerances for Rx placement -- laterally and rotationally 4. Control of focus mechanism (distortion of dish) 5. Budget.