State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.

Slides:



Advertisements
Similar presentations
Engineering Economy Practice Problems
Advertisements

OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
INTEREST AND CASH FLOW DIAGRAM
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Chapter 11 Replacement Decisions
Operations Management Capacity Planning Supplement 7
Warm-Up Review Time Value of Money Calculation of Future Value
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Making Capital Investment Decisions Chapter Ten.
Engineering Economic Analysis - Ninth Edition Newna/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
1. Cost Concepts & Design Economics
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Cost Analysis and Estimation
Valuation and Reporting of Fixed and Intangible Assets Chapter 7.
Determining How Costs Behave
Chapter 2 Engineering Costs and Cost Estimating
1 Engineering Economics Engineering Costs and Cost Estimating William Loendorf, P.E.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
Chapter 10 Making Capital Investment Decisions McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Making Capital Investment Decisions.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
DECISION MAKING BY THE NUMBERS
CTC 475 Review  Course Requirements  Applications  Multiple Decision Criteria  Selling The Project  PSP.
Financial Statements Business Management.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
COST-VOLUME-PROFIT ANALYSIS
ENGINEERING ECONOMICS ISE460 SESSION 16 June 23, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? New homework – Random Variable IRR –Review –Multiple.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Other Operating Budgets Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 39.
1 © Copyright 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star Logo, and South-Western are trademarks used herein under.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
Engineering Economic Analysis Canadian Edition
Analytical Tools Marginal analysis Discounted cash flow.
Engineering Costs and Cost Estimating. Manufacturing Cost Structure Direct Materials Direct Labor Direct Labor: Cost of all “hands-on” effort required.
Property, Plant, and Equipment, and Intangibles
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 22 Cost-Volume-Profit Analysis.
CHAPTER 2 ECONOMIC MODELS: TRADE-OFFS AND TRADE. Welcome to ECON 2301 Principles of Macroeconomics Dr. Frank Jacobson Mr. Stuckey Week 2 Class 2.
 Accountants are responsible for answering questions surrounding the financial side of business  Accountants make sure records of a business are up.
Linear Programming Technical Supplement 3 Learning Curves Copyright © 2014 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
YEAR 11 ACCOUNTING CAPITAL EXPENDITURE REVENUE EXPENDITURE.
1/26/2016rdcw2a-1 Engineering Economic Analysis Chapter 2  Engineering Costs and Cost Estimating.
Engineering Economic Analysis Canadian Edition
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Analytical Tools Marginal analysis Discounted cash flow.
Chapter # 5 Financial Plan. Financial Plan for start up business A financial plan is a series of steps or goals used by an individual or business, the.
F Designed to give you the knowledge and application of: Section C: Financial Statements C1. Statements of cash flows C2. Tangible non-current.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin BNFO 621: Business and Entrepreneurship : ACCOUNTING Roxanne M. Spindle Associate Professor.
Chapter 3: Cost Estimation Techniques
Fixed Assets and Intangible Assets
Chapter 8 – Financial Statements for a Proprietorship
Accounting for Long-lived and intangible assets
Plant and Intangible Assets
Engineering Economics Engineering Costs and Cost Estimating
Cost Concepts and Design Economics
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Capital Budgeting Decisions
CHPE308 Engineering Economy Estimation Of Capital Cost
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
CTC 475 Review Course Requirements Applications
Investments: Property, Plant, and Equipment and Intangible Assets
Chapter 3: Cost Estimation Techniques
Presentation transcript:

State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any form or by any electronic or mechanical means, including the use of information storage and retrieval systems, without written approval from the copyright owner. ©2006 Binghamton University State University of New York

ISE 211 Engineering Economy Cost Estimating (continued)

Estimating Models (cont’d) 4) Power Sizing Model:  Used to estimate costs of industrial plants and equipment  It “scales up” or “scales down” previously known costs, thereby accounting for common “economic scales” Example: Building a refinery – would the cost to build the same refinery with double the capacity be twice as much? Answer:

Estimating Models (cont’d)  The Power Sizing Model Cost of equipment A Capacity of A Cost of equipment B Capacity of B x Where:x – power sizing exponent (from Handbooks) Cost of A and B are at the same time Capacity is measured in the same units  Note: You may need to use both power sizing and costs indexes together to account for capacity changes and time changes.

Example Power Sizing Exponent Values

Example Based on her work in the previous example, Miriam has been asked to estimate the cost today of a 2500 ft 2 heat exchange system for the new plant being analyzed. She has the following data:  Her company paid $50,000 for a 1000 ft 2 heat exchanger 5 years ago  Heat exchangers within this range of capacity have a power sizing exponent of  The Heat Exchanger Cost Index (HECI) was 1306 five years ago and is 1487 today.

5) Learning Curves  As the number of repetitions increase the faster and more accurate performance becomes -- “Learning and Improvement”  They capture the relationship between task performance and task repetition  In general, as output doubles, the time to do the task reduces by some amount -- For a 95% learning curve: this means the new time will be 95% of the old time.  Example: if it takes 300 minutes to make the 3 rd item, how long would it take to make the 6 th item if it has a 95% learning curve? Solution:  Also called: progressive curve, improvement, experience curve, etc. Estimating Models (cont’d)

 Expression for time estimating in repetitive tasks: T N = T initial x N b Where T N -- time requirement for the Nth unit of production T initial -- time requirement for the first/initial unit of production N -- number of completed units (cumulative production) b -- learning curve exponent (slope of the learning curve)  A learning curve is often referred to by its percentage learning slope  A curve with b = is a 95% learning curve: = 0.95  This equation uses 2, because the learning curve percentage applies for doubling cumulative production  The learning curve exponent can be calculated as follows: b = log (learning curve expressed as a decimal)/log 2.0 Estimating Models (cont’d)

Calculate the time required to produce the 100 th unit of a production run if the first unit took 32.0 minutes to produce and the learning curve rate for production is 80%. Solution: Example 1

Estimate the overall labor cost portion due to a task that has a learning curve rate of 85% and reaches a steady state value after 16 units of 5 minutes per unit. Labor and benefits are $22.00 per hour and the task requires two skilled workers. The overall production run is 20 units. Solution: Example 2

Example 2 (cont’d)

 Fixed and variable benefits, recurring and non-recurring benefits, incremental benefits, etc  Benefits are more likely to be overestimated than under estimated  Many of the models, concepts and issues that apply in the estimation of costs also apply in the estimation of economic benefits. Estimating Benefits

 The costs and benefits of engineering projects occur over time and are summarized on a Cash Flow Diagram (CFD)  CFD illustrates the size, sign, and timing of individual cash flows Cash Flow Diagram

The expenses and receipts due to engineering projects usually fall into one of the following categories: 1) First cost: expense to build or to buy and install 2) Operations and maintenance (O&M): annual expense, such as electricity, labor, and minor repairs 3) Salvage value: receipt at project termination for sale or transfer of the equipment (can be salvage cost) 4) Revenues: annual receipt due to sale of product or services 5) Overhaul: major capital expense expenditure that occurs during the asset’s life Categories Cash Flow

Drawing Cash Flow Diagrams with a Spreadsheet

Homework # 02 (Practice Problems)