PIP Preparation for HP-III HP-III Workshop and wrap-up New Delhi Feb. 4, 2015.

Slides:



Advertisements
Similar presentations
CAPACITY BUILDING Atmospheric observations Laboratory measurements Modeling and data analysis 1.
Advertisements

FOOD SERVICE MANAGEMENT COMPANIES SFSP Procurement Procedures Part III, Page’s of the Administrative Guidance for Sponsors.
Information Workshops October 2014 Capability Investment Resource (CIR)
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Presentation 4 – How to Estimate Resource Requirements for the CPC? 1 Presentation 4 Presentation 4 How to Estimate Resource Requirements for the CPC?
OJJDP Performance Measurement Training 1 Incorporating Performance Measurement in the Formula Grant RFP and Application Format Presenter: Pat Cervera,
Capital Planning Update 1 Senate Fiscal Committee/COPE Presentation January 3, 2012.
Components of software quality assurance system overview
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
Financing Urban Public Infrastructure
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
RCUK fEC Update. Full Economic Costing From 1 September 2005, research grants awarded by the UK Research Councils.
This is the best Power Point Template ever. It comes with over 5 styles of colors and include lots of features. Serving New England Businesses Since 1988.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
Industrial Engineering Roles In Industry
 It is especially important if you are starting a new business that you get a proper record keeping system in place from the beginning.  Good record.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Board Retreat January FirstLine Schools Long-Term Goals GoalTargetNotes Improve student achievement Each FirstLine K-8 school will have.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Be an Effective Wi-Fi Buyer School Wi-Fi Buyer’s Guide Overview Fall 2015.
Who Provides it and Characteristics Needed in the CEO.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Algorithm.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Understanding School Finances School Councils. What are school council’s major responsibilities regarding finance? 1.To approve the school’s annual budget.
© 2015 Universal Service Administrative Company. All rights reserved Applicant Training Fiber Options.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Understanding School Finances School Councils. What are school council’s major responsibilities with regard to finance? 1.To develop the school’s annual.
1 On-Farm Irrigation Project, Credit No KG On-Farm Irrigation Project, Credit No KG Presentation: On-Farm Irrigation Project Prepared by N.A.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
1 Personal Investing. 2 Step 1: Set your financial goals Step 2: Understand investment vehicles Step 3: Develop an investment strategy Step 4: Implement.
Effective Case Costing for your ASC Jason Beam, RN, BSN CASC Sr. Vice President of Operations Ambulatory Surgical Centers of America.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
1 Version Rate Extensions under the Uniform Guidance Steve Bradley NECA September 2015.
Prussing Elementary School Budget Presentation FY
Introduction to the UND’s New Budget Model. Existing Budget Model? UND’s budget approach has been historical and incremental Meaning: The next year’s.
College-wide Meeting Budget Planning For FY March 17, /10/20161.
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
CENTRAL EUROPE PROGRAMME PROJECT DEVELOPMENT FINANCIAL ISSUES Project development seminar Prague, 1 st February 2010 Luca FERRARESE JTS CENTRAL.
Interprofessional Learning Clinical Placement Toolkit Module: Capacity What type of placement can we offer? “Building and sustaining training in WA”
New Directions in Auditing Construction and Public Works Projects Part 2 Beth Woodward, CGAP, CIA, CCA Senior Management Auditor Audit Services Division,
Autumn Staff briefings As a NHS patient, care is provided free at the time you need it, whether this is from a hospital or community nurse or.
PIPS!!! Performance Information Procurement System.
Texas Higher Education Coordinating Board November 4, 2011 Ben Ferrell, Jr., Executive Vice President, Finance & Administration Austin Community College.
6 Resource Utilization 4/28/2017 Teaching Strategies
WGA TRANSPORTATION FUELS FOR THE FUTURE INITIATIVE Electricity Report Summary Bob Graham, Electric Team Lead Transportation Fuels for the Future Workshop.
Nurse Education Practice Quality and Retention- Interprofessional Collaborative Practice: Behavioral Health Integration (NEPQR-IPCP:BHI) Program FY 2016.
Interreg Atlantic Area Programme Eligibility Rules.
7 Management of Physical and Fiscal Resources Unit 7.
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
Budgeting and Cost Estimation
Interreg Atlantic Area Programme Partner Budget & Eligibility Rules
Planning for Information System
Ministry of Water Resources, River Development and Ganga Rejuvenation
National Hydrology Project
National Hydrology Project
National Program of Action: Costing and Funding
Budgeting: Estimating Costs and Risks
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
4.3. Statistics Finland's experience on cost accounting
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Christy Jones Professional Learning Program Specialist
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
SPOT CHECKS 2016.
FY19 Budget Summit University Wide Joel Klucking
Presentation transcript:

PIP Preparation for HP-III HP-III Workshop and wrap-up New Delhi Feb. 4, 2015

Tentative budget allocations PIP budgets requested by the IAs substantially exceed the availability of funds under HP3. MoWR will provide budget allocations to IAs. Initial estimates of allocations were provided during the mission. Step 1: Develop full-scale dream PIP in line with the real needs for investment in WRIS/HIS infrastructure and services, keeping in view that building the optimal WRIS/HIS system is a long-term process and need not be fully completed during HP3. Step 2: Derive from the full-scale desirable PIP a second, downscaled Priority PIP, commensurate with the tentative budget allocations provided (for purpose of PAD) The Priority PIP aims to guide prioritizing state activities under the initial budget allocations, keeping in view State priorities in water management.

Budget allocations and timing Budgets of agencies demonstrating good performance in project implementation can over time be increased based on savings from less performing agencies. Therefore, all agencies should make at least token budget allocations (as placeholders) for all budget lines of possible future importance, to facilitate future budget reallocations. It is recommended to divide the budget into two parts: 50% - 60% for year 1 -4 (stage 1: FY ) and 40% - 50% for year 5-8 (stage 2: FY ) Reflects the need to procure more hardware, which is cost intensive, during stage 1 of the project and the need to develop water management tools and programs in stage 2.

Allocations for project components PIPs reviewed tend to focus on installing large numbers of expensive equipment (component A), building new offices and related facilities, and funding vehicles and incremental staff cost (component D). The goal of HP3 is to build capacity and tools, and to support data usage for improved water management (components B and C), and insufficient importance has thus far been given to the utilization and application of data Generally, allocations to components B and C need to be increased and costs under components A and D may be reduced accordingly. Tentatively allocations across components for new States could be in the range of: 40% for component A, 5% for component B, 15% for component C, and 40% for component D (usually some new buildings/offices are required). For the existing HP-I/II States the focus should be more on components C (including an extension of real-time networks for flood forecasting and other purposes) and less on component D, e.g. 40% for component A, 5% for B, 30% for C and 25% for D.

Unit cost rates and staff cost Incremental staff cost: Limit incremental staff cost mainly to the cost of temporary staff cost, with a focus on specialist staff such as IT experts and other professionals for data centres, chemists for laboratories, temporary data entry staff, etc. Filling-up vacancies of existing post cannot be funded. As a rule of thumb, cost of incremental staff (sub-component D5.1) should not exceed 10% of the total budget. Unit cost rates: Unit cost rates need to be reconciled with the rates prepared and distributed by the Bank’s team for guidance of the agencies. One may deviate from these unit rates, if they are demonstrably unrepresentative for the State.

Unit cost rates

AMC, taxes, contingencies and price escalation AMC and insurance for new equipment: It has been decided to include two years warranty and 5 years mandatory AMC in the bid documents. The average period of AMC to be paid by agencies during the project period will be less than 5 years. 35% extra cost for O&M of the equipment (5 average of 6% for AMC and 1% for insurance) included in unit rates. Extended warranty may be another option. AMC is part of the bidding document and contract, and costs of AMC may be added to the cost of ‘Goods’ instead of ‘Operation Cost’. Taxes: For the purpose of budget estimation 12.5% is added for VAT/service taxes to the unit rates. Contingencies and price escalation: Ten (10%) should be added for contingencies and price escalations “at the bottom” of the cost table.

Model PIP for a medium to large State