France – Spain open season Results Lessons learned.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
French transport structure SG meeting Madrid – 15 July 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
South Region Second Edition
Gas Regional Initiatives
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
ERGEG South Gas Regional Initiative
ENAGAS – TIGF Agreement Larrau Interconnection, November 2007
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
In depth analysis of TYNDP issues
In depth analysis of TYNDP issues
RO-HU-AT - a pilot project for incremental capacity
مدیریت استراتژيک منابع انسانی
RO-HU-AT - a pilot project for incremental capacity
In depth analysis of TYNDP issues
Ռազմավարական կառավարում
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

France – Spain open season Results Lessons learned

France – Spain Open season at a glance 4 TSOs and 2 NRAs 2 phases (2013 : western corridor : eastern corridor) 6 different products 18 different development steps 6 levels of price proposed 2

- 3 - Results of the 2013 phase Capacities allocated /demand 27 /27 GWh/d 149 / 149 GWh/d 132 / 361 GWh/d Capacities allocated /demand 0 GWh/d 115 / 115 GWh/d 69 / 69 GWh/d Development of an existing interconnexion point : Larrau

- 4 - Results of the 2015 phase Capacities allocated /demand 0 / 200 GWh/d 0 / 13,6 GWh/d Development of an existing interconnexion point : Biriatou A very significant increase in interconnexion capacity (+120 GWh/d) but demand not sufficient to trigger the eastern corridor Capacities allocated /demand 30,4 / 30,4 GWh/d 40,8 / 40,8 GWh/d 44,8 / 71,6 GWh/d

- 5 - Lessons learned South GRI proved to be an efficient platform to coordinate the project Strong variation of demand between the two phases Reluctance to commit long term in the second phase Coordinated routes add significant complexity Competing products sold simultaneously Importance of tariff visibility