NewExt Structure of the final report 1.Executive Summary 2.Introduction 3.Monetary Valuation of mortality risks 4.Valuation of impacts based on the standard-price.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

MAP-IT! Review Meeting 5 March Brussels Project management Overview Cybion Srl.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Talent Status Report Succession Planning Presentation for (Executive Meeting) on DD/MM/YYYY Organisation Logo Confidential.
Paul Scherrer Institut 5232 Villigen PSI NewExt-Project, 13./ , Bath (UK) Assessment of externalities from major accidents in non-nuclear fuel.
IMPACT OF HIGH ENERGY COSTS: RESULTS FROM A GENERAL AND A PARTIAL EQUILIBRIUM MODEL Francesco Gracceva Umberto Ciorba International Energy Workshop Kyoto,
CARPE DIEM 7 th (Final) meeting – Bologna Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
Energy Resources Human Impact on the Environment.
Chapter 3: The Project Management Process Groups
NewExt: WP2 Mortality Risk Valuation - Results and uses for Externe University of Bath Project Meeting May 26th, 2003 PSI.
California Energy Commission Integrated Energy Policy Report Lead Commissioner Workshop: Preliminary Results Natural Gas Common Cases California Energy.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Book 2.final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 7 Cairo, 17 July 2005.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
David Lamoureux CalPERS Deputy Chief Actuary
The 3 rd meeting of the Steering Committee of the INTOSAI Committee on Knowledge Sharing and Knowledge Services PROGRESS REPORT ON THE INTOSAI WORKING.
Jan MELICHAR Charles University Environment Center NEEDS Forum 3 - Cairo January 28, 2008 The external costs calculation in CEEC countries focusing on.
C R O P S T O I N D U S T R Y WP4 TaskS 4.1 & 4.2 Task leader: ICCEPT Crops2Industry “Non-food Crops-to-Industry schemes in EU27” Calliope Panoutsou &
Introduction. What do they have in common? CASA Peer Review California Association of State Auditors (CASA) California Association of State Auditors.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
IIASA J. Cofala Methodology for estimating the control potential and costs for PM emissions in Europe Costing method, cost components, parameters Types.
RAWG.  Risk assessment guideline for strategic and annual planning ◦ Identifying auditing universe ◦ Identification of risks ◦ Categorization of possible.
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th.
LOGO of SL Introduction to the NEEDS project SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] Andrea Ricci, coordinator ISIS Cairo, 28 January.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
California Energy Commission Integrated Energy Policy Report Commissioner Workshop: Revised Results Natural Gas Common Cases September 21, 2015 Leon D.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
ExternE _ The ExternE-Approach for Calculating External Costs – Methodology and Preliminary Results Peter Bickel IER - University of Stuttgart, Germany.
International Telecommunication Union Geneva, 9(pm)-10 February 2009 BUSINESS USE OF TELECOMUNICATION SECURITY STANDARDS PROJECT Patrick Mwesigwa, Director/Technology.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation.
July 17, GRAC 7/17/08 - Wrap-up I 1)Are the reference plant assumptions reasonable? More or less specificity? Important variations? 2)Should other.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
Topic 6 Managing stage boundaries
Energy. Index Energy Sources Turn Into Energy  Gas power station  Oil power station  Coal power station  Nuclear power station Advantages Disadvantages.
WP1: Synthesis and dissemination Leader: nn WP2: Climate scenarios Leader: E. Roeckner MPI WP5: Risk and Opportunity assessment Leader: Ø. Endresen, DNV.
4.5 Perform Integrated Change Control
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
1 External Costs: A Tool for Internalizing Imported Pollution Ari Rabl Ecole des Mines de Paris Damage cost of pollution = external cost Imported pollution.
GINA WP4.2 Business and Exploitation Plan March 10 th 2010 Lisbon GNSS for INnovative Road Applications.
Overview: Benefit Analysis in CAFE Paul Watkiss AEA Technology Environment.
Wind Turbine Power Plant. Sources ●
A.Ricci - 17/02/09 Introduction to NEEDS SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] Andrea Ricci, ISIS Brussels,
Copyright © 2012 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 11 Specific Types of Quantitative Research.
Presented by: Eastern Research Group, Inc. May 10, 2005 Status Report to the Stationary Sources Joint Forum: Task 2: Control Technology Analysis.
Community-Based Coastal Adaptation Planning Presenter Name Date.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Presented by: Eastern Research Group, Inc. February 23, 2005 Status Report to the Stationary Sources Joint Forum: Task 2: Control Technology Analysis.
Standard Design Process Overview
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
Reports Activities since last meeting in Lund #1
Impact Assessment of the revision of Regulation 445/2011
University of Wisconsin This talk is available on:
Joint Research Centre The European Commission’s in-house science service.
Update Interim implementation report and financial statement (December 2006) request from the Commission for additional documents in February –
ESS.VIP ADMIN Sorina Vâju.
Methods for Benefits Assessment and CBA for the NEC Directive Revision
Air Resource Specialists, Inc. July 23, 2004
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

NewExt Structure of the final report 1.Executive Summary 2.Introduction 3.Monetary Valuation of mortality risks 4.Valuation of impacts based on the standard-price approach 5.Multi-media impact pathways 6.Assessment of major accidents 7.Revision of external cost estimates 8.Conclusions

NewExt Work Package 6: Revision of External Cost Estimates IER (5.2 PM), ARMINES (2 PM), VITO (1.5 PM), PSI (1 PM) Draft Structure

NewExt Time plan until the end of the project End of May:Cost statements Annual report Mid of June:All inputs for WP 6 available End of June:Official end of NewExt WP 2/3/4/5 reports End of August:Final report ready Technology Implementation Plan Final Cost Statements Final Meeting (Brussels?)

NewExt Key technologies that have been analysed before within the ExternE project: Coal fired power plant Oil fired power plant Combined-cycle plant using natural gas Photovoltaic plant Wind turbine How do new methodologies affect external cost estimates? Work Package 6: Revision of External Cost Estimates

NewExt DIEM workshop / GreenSense ? Work Package 6: Revision of External Cost Estimates Status ExternE National Implementation Status before / without NewExt Status including NewExt Changes due to new values applied according to WP 2/3/4/5 Changes due to parameter, DRF, and database updates etc.

NewExt Changes by new methods of assessment? Monetary Values of mortality Valuation of impacts based on standard-price New multi-media impact pathways (real EcoSense extensions) Major accidents Calculations within / without EcoSense ? (in the frame of this project) Work Package 6: Revision of External Cost Estimates

NewExt

Comments and conclusions:

NewExt