Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.
Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
The Process of Siting and Approving a New Landfill in Ontario
Evaluating Shadow Flicker in the Current Regulatory Environment Massachusetts Wind Working Group Meeting: October 30, 2013 Richard Lampeter, INCE Senior.
Planning Permission Process and Procedures
URBAN INFILLING IMPACTS ON FLORIDA’S SOLID WASTE FACILITIES Debra R. Reinhart, PhD, PE, DEE Roger Wayson, PhD, PE University of Central Florida Marc Rogoff,
Freight-Supportive Guidelines ACT Canada – Sustainable Mobility Summit 2012 November 7, 2012 Ontario Ministry of Transportation.
Energy National Policy Statements Nick Cooper DECC.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING SURVEY ON NATIONAL CAPACITY NEEDS OF SERBIA FOR GLOBAL ENVIRONMENTAL.
A&WMA ONTARIO SECTION AND OPPI TORONTO DISTRICT Workshop on Land Use Compatibility and Nuisance Sources May 14, 2015 MUNICIPAL, PLANNING & DEVELOPMENT.
Air Quality Significance Criteria Dr Claire Holman LLP Director.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Talking Freight Seminars November 19, 2008 Caroline A. Mays, AICP Atlanta Regional Commission Integrating Freight and Land Use in the Atlanta Region.
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
Local Government Perspectives on Siting Criteria for Localized Air Pollution Sources “How do cities balance the goals of creating housing and employment.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
CCRPC Board Training Climate & Brownfields September 19, 2012 Julie Potter, Senior Planner.
Official Plan Review - Phase II CITIZEN REFERENCE PANEL.
Community Development Department Neoga Lakes – Development of Regional Impact (DRI) Master Planned Development (MPD) Rezoning Application.
Development Management Objective to promote proper planning and sustainable development and adopt a pro-active approach towards development that accords.
Small Drinking Water Systems Program December 2008 These materials are provided for informational purposes only, and should not be taken as legal advice.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
The Contaminated Land Regulations – Consolidated Review 21 September 2005 Craig Edwards.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
Bad Neighbours (land-use conflicts) Andrew Mack – Associate Director NELA WA State Conference 3 September 2015.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
FREIGHTSUPPORTIVE LAND USE PLANNINGGUIDELINESFREIGHTSUPPORTIVE PLANNINGGUIDELINES FHWA Talking Freight Series May 18/05 Video Seminar on Context Sensitive.
Small Drinking Water Systems Program Overview Ministry of Health and Long-Term Care Public Health Protection and Prevention Branch Environmental Health.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Pipeline Safety & Development Changes File # ZON Proponent Carl Weimer, Whatcom County Council Docketed Unanimously by the Whatcom County Council.
Regulatory Framework for Uranium Production Facilities in the U.S.
State Planning Policy 5.4 Noise and Freight Considerations in Land Use Planning Evan Jones and Kareena May August 2014.
SEA in the Czech Republic Prague, 24 September 2008.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
Life After Landfill – regulatory requirements Kate Hamer and Thomas Gallasch Waste to Resources, Regulation and Compliance EPA 27 th September 2007.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Modernization of Municipal Wastewater Approvals Program Water Environment Association of Ontario – Utility Management Forum October 19, 2015.
Air Quality, Human Health & the Built Environment For Health and Social Services Committee Kim Perrotta, Senior Policy Analyst Halton Region Health Department.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Socially Acceptable Costs for Municipal Solid Waste Management Services Vojtěch Doležal, SEWACO s.r.o 24 June 2015 ISWA Study Tour WASTE-TO-ENERGY.
Airport Land Use Relationship CE 633. errata Surrounding land use is difficult to control. Consider airspace issues with respect to local gov’ts and planning.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Project Manager & Author: Kim Perrotta Presenting to the CHNET-Works May 26, 2011 Public Health and Land Use Planning: How Ten Public Health Units are.
College Heights State College neighborhood plan SWOT analysis meetings pm State College Planning Commission Church of Christ.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Canadian Environmental Legislative David Hunter B.A., LL.B., LL.M. Bennett Jones LLP Presentation to: Fachbereich 1 Architektur, Bauingenieurwesen, Geomatik.
Airdrie Land Use Bylaw MPC Information Session December
ISO Session 3 Environmental Management and Ethics in Management.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
New Comprehensive Zoning By-law December 12, 2016.
Environmental Assessment and Licensing (EAL) in Manitoba
Integrated Bilateral Agreement (IBA) 2018 to 2028
Official Plan and Zoning By-law Amendment Application
Presentation transcript:

Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility 2015May14

This Introduction The Proximity Issue The Pressure Points Available Guidance D-6 Report & Study Examples 2 A&WMA/OPPI Land Use Compatibility 2015May14

The Proximity Issue The air Ontario Regulatory system, including noise, is primarily based on off-property impacts. Concept of ‘Points of Impingement (POI)’, or points of potential adverse effect 3 A&WMA/OPPI Land Use Compatibility 2015May14

The Proximity Issue Points of impingement 2. (1) A reference in this Regulation to a point of impingement with respect to the discharge of a contaminant does not include any point that is located on the same property as the source of contaminant. O. Reg. 419/05, s. 2 (1). (2) Despite subsection (1), a reference in this Regulation to a point of impingement with respect to the discharge of a contaminant includes a point that is located on the same property as the source of contaminant, if that point is located on, (a)a child care facility; or (b)a structure, if the primary purpose of the property on which the structure is located, and of the structure, is to serve as, (i)a health care facility, (ii)a senior citizens’ residence or long-term care facility, or (iii)an educational facility. 4 A&WMA/OPPI Land Use Compatibility 2015May14

The Proximity Issue Air Points of Impingement: All off-property ‘receptors’, including All ground level locations including low rise structures: Elevated structures (e.g. medium and high rise buildings); And certain on-property locations (e.g. child care). c.f. Noise Point of Reception; later presentation 5 A&WMA/OPPI Land Use Compatibility 2015May14

The Proximity Issue The Pressure Points High demand for residential development Low demand for industrial land or industrial land development Redevelopment, Infilling and Mixed Use Functional ‘grandfathering’ of existing industries –Tolerance of some fugitive dust, noise and odour leaving the property Community perceptions of adverse impacts and nuisance 6 A&WMA/OPPI Land Use Compatibility 2015May14

Available Guidance 2014 Provincial Policy Statement (s1.2.6 Land Use Compatibility) The Environmental Protection Act The 1999 Land Use Compatibility Guidelines (the so called ‘D’ Guidelines); on the MOECC website: industrial-facilities 7 A&WMA/OPPI Land Use Compatibility 2015May14

Available Guidance D-1 Land Use And Compatibility D-2 Compatibility between Sewage Treatment and Sensitive Land Uses D-3 Environmental considerations for Gas or Oil Pipelines and Facilities D-4 Land Use on or Near Landfills and Dumps D-5 Planning for Sewage and Water Facilities D-6 Compatibility between Industrial Facilities and Sensitive Land Uses 8 A&WMA/OPPI Land Use Compatibility 2015May14

Available Guidance Details and Clarifications: D-1-1; D-1-2; D-1-3 D-4-1; D-4-2; D-4-3 D-5-1; D-5-2; D-5-3; D-5-4; D-5-5 D-6-1; D-6-2; D-6-3; D A&WMA/OPPI Land Use Compatibility 2015May14

AWMA-OS Breakfast Presentation 10 ECA Clarification D-6-2 Clarification The Ministry of the Environment & Energy requires that the industrial facility, for which the Air C of A application is being made, must comply with area zoning by-law(s). If the proposal conflicts with area zoning by-laws, the application will be returned.

Available Guidance NPC-300 Environmental Noise Guideline, Noise Assessment criteria for Stationary Sources and for Land Use Planning Ontario Regulation 419/05 Air Pollution — Local Air Quality 11 A&WMA/OPPI Land Use Compatibility 2015May14

Available Guidance Guideline A-10 Procedure For Preparing an Emission Summary and Dispersion Modelling Report Guideline A-11 Air Dispersion Modelling Guideline for Ontario Technical Bulletin Methodology for Modelling Assessments of Contaminants with 10-minute Average Standards and Guidelines under O.Reg. 419/05 12 A&WMA/OPPI Land Use Compatibility 2015May14

Available Guidance Halton 2014 Guidelines (Part of Halton ROPA 38; Report No. IMLC01-14) : Land Use Compatibility Guidelines Regional Official Plan Guidelines Air Quality Guidelines Regional Official Plan Guidelines Includes Transportation Corridors and Airports 13 A&WMA/OPPI Land Use Compatibility 2015May14

A D-6 Guideline Study Class Recommended Minimum Separation Distance (m) Potential Influence Area (m) I2070 II70300 III A&WMA/OPPI Land Use Compatibility 2015May Metre Study Area to search for Industrial Uses Definitions and examples of three Classes, based on noise, dust and odour: But the ‘actual influence area is site specific’

AWMA-OS Breakfast Presentation 15 D-6 Guideline Graphic

Sensitive land uses ( where humans or the natural environment may be adversely affected by emissions ): – Designated recreational uses, public spaces – Buildings and Amenity Areas; examples include residences, senior homes, schools, day care, hospitals, churches, campgrounds A D-6 Guideline Study 16 A&WMA/OPPI Land Use Compatibility 2015May14

A D-6 Report describes – the relevant existing and proposed industries and separation distances to – existing and proposed sensitive uses based on the potential for noise, dust and odour. Typically the report is commissioned to address encroachment of new residential on existing industry Report may also include mitigation as appropriate A D-6 Guideline Study 17 A&WMA/OPPI Land Use Compatibility 2015May14

An Overall D Guideline Study A full D Study Report includes: –Sewage Treatment Facilities; –Pipelines; –Landfills and Dumps; –Water Supply and Services; and –Industrial Facilities. A full sensitivity study might also include transportation corridors, airports and the like. 18 A&WMA/OPPI Land Use Compatibility 2015May14

AWMA-OS Breakfast Presentation 19 D-6 Example 1 Proposed Townhouses Adjacent to Small Sewage Treatment Plant: –Odour Issues –Complaint History –Community Odour Observations –Consultations with Regional Government –Peer Reviews

AWMA-OS Breakfast Presentation 20 Proposed Housing Near Industrial Park: –Survey of industrial & commercial facilities –Categorize facilities & identify separation distances –Site Visit Observations –Discussions with Municipal, Regional Government & MOECC D-6 Example 2

Thank you A&WMA/OPPI Land Use Compatibility 2015May14