RECREATIONAL CARRYING CAPACITY ASSESSMENT FOR THE CHIKLY ISLAND AND SURROUNDINGS (TUNIS) María José VIÑALS Imma MARTÍNEZ Aida ABDENNADHER Maryland MORANT.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Salt Marsh Restoration Site Selection Tool An Example Application: Ranking Potential Salt Marsh Restoration Sites Using Social and Environmental Factors.
National/State Scenic Byways Program Overview Frost/Stagecoach Byway route Progress on Byway Corridor Management Plan Public Visioning Forum Robert Frost.
Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
“ Establishment of a Land Resources Information System for the evaluation of scenarios of sustainable agriculture land use “ Regional Project FAO - GCP/RLA/126/JPN.
María José Viñals Universitat Politècnica de València THE TOURIST EXPERIENCE.
Establishing GIS for Management in the Sauvie Island Wildlife Management Area, Oregon Jeremy Hruska Masters Degree in GIS Candidate Penn State University.
Operational Fire fighting Social Perspective Disaster Planning Perspective Fire Behaviour Perspective Planning Design Perspective Building Design Perspective.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Feasibility Studies National Heritage Areas. Initiating National Heritage Areas National Heritage Area designations have been initiated in four different.
Ecotourism Badema Dizdar.
Lecture :TitleEcotourism Management Considerations
Ecosystem Vulnerability Profile. Ecosystem Resources Vulnerability Profile What values and benefits do natural resources provide? What natural resources.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
1 Eco-tourism: A Potential adaptation strategy to Climate Change in the Greater Limpopo Basin - Eastern Botswana. N. N. Moswete University of Botswana.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
SISTEM PLANIRANJA V SLOVENIJI Okvirni sistem Analiza možnosti dolgoročnega (srednjeročnega) razvoja Krajinska zasnova Primerjalna študija (za presojo variant.
National Park Russian Arctic & Perspective of Tourism Development in the Northern Russian Barents Sea RUSSIAN TOURISM ROADSHOW /Berlin, Paris, London 2012/
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
1 Visitor Use and Wildlife Protection in US National Parks Pathways to Success Conference October 6, 2014 Ericka Pilcher, Jennifer Stein, & Susan McPartland.
Lake Planning …the health of your lake depends on it! French Planning Services Inc
In support of the Strategic Environmental Plan for Palawan (Republic Act 7611) Research Agenda for Palawan.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
Development of Lantau Island. Background of the development Lantau Island is the biggest island in Hong Kong Well recognized for its nature conservation.
Methods and Tools to Integrate Biodiversity into Land Use Planning
Coastal Web Atlases in the Chesapeake Bay Region: Examples from Virginia and Maryland Marcia R. Berman Center for Coastal Resources Management Virginia.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
A STUDY USING PHOTO METHOD TO EVALUATE RECREATIONAL CARRYING CAPACITY IN PENGHU ISLANDS, TAIWAN Shyi-Liang Yu Shyi-Liang Yu Department of Leisure Management,
How Are Marine Protected Areas Created? A Guide for the Lay Person.
1 Fabián Lozano Laboratorio de Sistemas de Información Georreferenciada, Centro de Calidad Ambiental, ITESM Campus Monterrey, Nuevo León, México Ordenamiento.
Sears Point ACEC: SEZ Regional Mitigation Site Thomas Jones Asst. Field Manager Bureau of Land Management Yuma Field Office November 14, 2014.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Carrying Capacity (CC) and LAC
National ecological network in Croatia Andreja Markovinović Ministry of Culture Department for Nature Protection Unit for Ecological Network.
1 RUSSIAN STRATEGY FOR CONSERVATION OF THE AMUR TIGER - A NATIONAL CONTRIBUTION TO GLOBAL TIGER RECOVERY PROGRAMME.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
ASSESSING AND MANAGING WILDLAND RECREATIONAL DISTURBANCE Stephen J. DeMaso, Fidel Hernández, and Leonard A. Brennan Caesar Kleberg Wildlife Research Institute,
Coastal Management Issues and Strategies: State and Municipal
Boat Densities and Carrying Capacities. Boat Density and Carrying Capacity What are they? Why do I care? What does this have to do with relicensing?
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Cécile BONINO-Pilot Wildlife Estates Spa August 2007 Wildlife Estates Darius Movaghar (ELO) WE Plenary Session - 2 September 2009 Delphine Dupeux.
Sample Codes of Ethics in Adventure Tourism
Tony MacDonald Director Urban Coast Institute Monmouth University November 30, 2009.
Planning and Sustainability Paul Farmer American Planning Association M6: Protecting the Urban Environment and Historical and Cultural Heritage.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Building Capacity on Protected Areas Law & Governance Module 10 Marine Protected Areas - Special Features & International Law Obligations and Guidan ce.
Draft Recommendations from the NH Coastal Risks and Hazards Commission Sherry Godlewski Department of Environmental Services Coastal Adaptation Workgroup.
Wikwemikong Tourism MEMORIAL.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
Lake Marion / South Creek Greenway Project Introduction December 2012 Lake Marion / South Creek Greenway Project Introduction December 2012.
Mendota / Lebanon Hills Greenway Project Introduction November 2012 Mendota / Lebanon Hills Greenway Project Introduction November 2012.
The Fish and Game Commission has designated the states portion of the South Bay Salt Ponds an Ecological Reserve. Planning for the management of Ecological.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
E X P E R I E N C E Y O U R A M E R I C A Transportation Study for Bodie Island National Park Service U.S. Department of the Interior Cape Hatteras National.
The Nomination Process for New National Marine Sanctuaries William Douros Regional Director NOAA's Office of National Marine Sanctuaries December 2014.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Konstantinos Loukidis
Julia Kintsch, ECO-resolutions Paige Singer, Rocky Mountain Wild
Parks and Recreation Commission
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
General overview of Module
Building Capacity on Protected Areas Law & Governance
AquaSpace Case Study Basque County, Spain: Issues and Tools
Development of Lantau Island
A three steps assessment
Management Strategy for Natura 2000 sites in Finland
Presentation transcript:

RECREATIONAL CARRYING CAPACITY ASSESSMENT FOR THE CHIKLY ISLAND AND SURROUNDINGS (TUNIS) María José VIÑALS Imma MARTÍNEZ Aida ABDENNADHER Maryland MORANT Lola TERUEL

1 INTRODUCTION AND OBJECTIVES 2 RESEARCH SOURCES AND METHODS Field inspections (two field trips) Collecting data Infrastructures and facilities analysis. Analysis of the current activities developed in the site. In-dept h interviews with stakeholders Analysis of comparative studies of the Spanish sites. 3 DEVELOPMENT OF THE RECREATIONAL CARRYING CAPACITY ASSESSMENT Lagoon, Island and Fortress Spatial Analysis Study of the natural, cultural and scenic resources involved Critical revision of the recreational activities planned Visitors’ profile and behaviour study. 4 RESULTS AND DISCUSSION Results from the Physical Carrying Capacity study Results from the Real Carrying Capacity study Results from the Effective Carrying Capacity Determining the Recreational Carrying Capacity and related-indicators. 5 CONCLUSIONS AND MANAGERIAL GUIDE 6 REFERENCES 7 ANNEXES

8,13 KM 2,80 KM 6,45 KM1,39 KM 1,16 KM 1,43 KM

NORTH LAKE OF TUNIS NORTH LAKE OF TUNIS

BIRDS HABITAT ZONING (NORTH LAKE OF TUNIS) BIRDS HABITAT ZONING (NORTH LAKE OF TUNIS)

CHIKLY ISLAND CHIKLY ISLAND

CHIKLY ISLAND (Constructions and Facilities) CHIKLY ISLAND (Constructions and Facilities)

FORT OF SANTIAGO FORT OF SANTIAGO

FAUNA & FLORA FAUNA & FLORA

HISTORIC BUILDING FORT OF SANTIAGO

FORT DU SANTIAGO

SCENIC RESOURCES: PANORAMIC VIEWS

NORTH-WEST VIEW SOUTH-WEST VIEW

SOUTH-EAST VIEW NORTH-EAST VIEW

INTANGIBLE KNOWLEDGE REOOURCES: TRADITIONAL FISHING

1/ Interpretative Route in the Natural Reserve of the Chikly Island 2/ Interpretative Visit of the Fort of Santiago 3/ Birdwatching in the Northern Lagoon of Tunis SUITABLE RECREATIONAL ACTIVITIES

INTERPRETATIVE ROUTE IN THE NATURAL RESERVE OF CHIKLY INTERPRETATIVE STATIONS 1/ Roman sites 2/ Brackish Marsh areas 3/ La Digue 4/ Façade of the Fort

INTERPRETATIVE VISIT FORT OF SANTIAGO

BIRDWATCHING NORTHERN LAGOON

1.PHYSIOGRAPHIC UNITS MAPPING 5. RESOURCES INVENTORY AND APPLIED ASSESSMENT 2. NATURAL HAZARDS MAPPING 3. ACCES INFRASTRUCTURES MAPPING 4. AVAILABLE SURFACE FOR RECREATIONAL PURPOSES 6. TERRITORY COMPETENC E MAPPING ZONNING Spatial considerations “The best place for hosting the planned activity”

Inventory and Assessment Intrinsic Values: significance, representativeness and singularity Recreational Criteria: attractiveness, accessibility, fragility/vulnerability, feasibility, availability, educational values, and increasing awareness values

ZONING OF THE PHYSIOGRAFIC UNITS OF THE CHIKLY ISLAND Circular Trail: 850 m x 2-3 m width Visitor Spatial Standard: 4 m m x 2.5 m / 4 = Coefficient of Land Use: 10% /10= 53 Visitors

ZONING OF THE ACCESIBILITY OF THE FORT OF SANTIAGO Access floorMain floor and courtTerrasse Tower

EXHIBITION ROOMS IN THE MAIN FLOOR 6 Exhibition rooms about 8,00 m 2 each one Visitor Spatial Standard: 1,2 m 2 8 m 2 / 1,2 m 2 = 6,66 Tower: 17,4 m 2 / 1,2 m 2 = 14.5

Ecosystems and Habitats to conserve Mapping SUITABILITY FOR USE MAPPING Physical and ecological, cultural and social Impact Analisys due to the activity or users Vulnerability Mapping TERRITORY COMPETENCE MAPPING “The best place for hosting the planned activity” … …where causes the least impacts Limiting Factors -Analysis of the site conditions (space limiting factors) -Physical and ecological factors (Impacts study) -Social factors (Visitors’ Psychological Comfort)

NESTING AREAS ZONING (Ecological limiting factor) Visitor Spatial Standard: 10 m 2 (instead 4 m 2 ) in order to protect nests close to the trail. 850 m x 2.5 m / 10 = Coefficient of Land Use 10%: / 10= 21 Visitors

ISLAND VISUAL IMPACTS ZONING (site conditions limiting factor) High Visual Fragility of the Island 20 Visitors is a large number of people to be held in an interpretation station (Group size: maximum 10 people) Visitors themselves cause visual impacts (2 groups can’t visit at the same time the Island) 1 group visiting the Island 1 group visiting the Fort

EXHIBITION ROOMS (site conditions limiting factor) Reading focal length: 0,70 m Windows Safety distance: 0,70 m Final Available Surface: 2,00 m 2 Visitor Spatial Standard: 1,2 m 2 2 m / 1,2 m 2 = 1,66

TOWER OF THE FORT OF SANTIAGO (Site conditions limiting factors) PhCC: Tower surface: 17,4 m 2 Visitor Spatial Standard: 1,2 m 2 17,4 / 1,2 = 14,5 people RCC: Activity limiting factors: Space Availability in the front line Spatial reference: available perimeter: 3,5 m Visitor Spatial Standard: 1,0 m 13,5 / 1,0 = 13,5 birdwatchers

(Managerial limiting factors)

Standars indicate the minimal acceptable conditions for the site. Fauna / Vegetation / Water / Landscape / Hitorical building An Indicator is a type of performance measurement used by the administration to evaluate the established conservation standards

-Determining the Conservation Standards -Reinforce the preventive protection measures -Establish access restrictions in special periods (nesting, etc.) -Set up physical barriers in order to protect roman remains -Write a Ethical Code -Prepare a Management Plan -Implement an Interpretative Programme -Control the boat speed -Improve site facilities -Develop an integrated signage system -Facilitate the basic services (first aids, telephone, chemical WC, drinkable water, etc.) -To provide the site with 2 wardens (1 day / 1 night) + 1 guide-interpreter (ToR must be writen) -Economic and material needs for conservation purposes and for recreational uses must be evaluated -Finantial strategies must be studied -Public-privat partnership implemented EFFECTIVE CARRYING CAPACITITY RECOMMENDATIONS