How does ETSI work? ETSI Seminar © ETSI 2010. All rights reserved.

Slides:



Advertisements
Similar presentations
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
UNITED NATIONS Shipment Details Report – January 2006.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
SEM08-09 Organizing the work ETSI Seminar © ETSI All rights reserved.
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
SEM14-05 Approving your draft ETSI Seminar © ETSI All rights reserved.
SEM08-14 Specialist Task Forces (STFs) Who they are ? What can they do for you ? How we manage ? ETSI Seminar June 2010 Specialist Task Forces (STFs) Who.
SEM02-10 The ETSI Secretariat ETSI Seminar © ETSI All rights reserved.
EditHelp! Louise Webster editHelp! service © ETSI All rights reserved ETSI seminar.
24 May 2004Michael Sharpe, ETSI Secretariat Radio Competence Centre 1 How can ETSI help? The regulatory environment for RFID Michael Sharpe.
TECHNICAL ORGANIZATION Organizing the work ETSI Seminar © ETSI All rights reserved.
SEM08-14 SPECIALIST TASK FORCES (STFS) ETSI Seminar SEM08-14.
SEM02-10 APPLICATIONS. SEM02-10 The ETSI Portal the interface for accessing information on the technical activities for each ETSI TB the Portal can either.
SEM11-06 COMMITTEE PROCEDURES ETSI Seminar © ETSI All rights reserved.
SEM13-03 EDITHELP! ETSI seminar © ETSI All rights reserved Footer text (edit in View :Header and Footer)
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 Aberdeen City Probationer Teacher Induction Programme.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
1 IC GS J. Broome, Mar Introduction to the Informatics and Data Aspects John Broome (Canada)
2 |SharePoint Saturday New York City
VOORBLAD.
CEN, Avenue Marnix Brussels, Belgium  The CEN range of deliverables.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
12ECBF-2001/CB 1 ETSI Technical Committee ETSI Technical Committee Electromagnetic compatibility Electromagnetic compatibility and Radio Spectrum Matters.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Analyzing Genes and Genomes
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Technical Organization and approval procedures
The ETSI Standardisation Process
Specialist Task Forces (STFs)
Presentation transcript:

How does ETSI work? ETSI Seminar © ETSI All rights reserved

The ETSI standards process 2 Work Item introduced Approval of draft by technical committee Publication IMMEDIATE If Technical Specification or Technical Report DraftingApproval 6 – 12 MONTHS If European Standard NSO Enquiry and Vote 90 DAYS If ETSI Standard or ETSI Guide ETSI Member vote Drafting in technical committee, working group or Specialist Task Force

3 ETSI's deliverables Normative: European Standard (EN) ETSI Standard (ES) ETSI Technical Specification (TS) Informative: ETSI Guide (EG) ETSI Technical Report (TR) ETSI Special Report (SR)

4 ETSI's deliverables Also: Harmonized Standard (HS) An EN drafted by ETSI under a mandate from the European Commission under Directive 98/48/EC taking into account the applicable essential requirements of the "New Approach" Directive and whose reference has subsequently been announced in the Official Journal of the European Communities ETSI Group Specification (GS) An ETSI deliverable, containing either specifications and/or information elements, produced by an Industry Specification Group Reference: ETSI Technical Working Procedures, Annex A

5 ETSI's deliverables Also: Community Specifications European Standards for Air Traffic Management systems or constituents to support the Single European Sky Interoperability Regulation 552/2004 on a mandate from the EC under Directive 98/34/EC in cooperation with EUROCAE

6 Choice of deliverable type (1) Specifications and standards TS - ETSI Technical Specification Normative Short time to market May be converted later to ES or EN ES - ETSI Standard Normative Preferable/necessary that whole ETSI membership approves EN - European Standard (telecommunications series) Formal output for standardization at European level Specific to Europe & needs transposition into national standards or subject of an EC/EFTA mandate Reference: ETSI Technical Working Procedures, Annexes A & E

7 Guides and reports TR - ETSI Technical Report Informative Default deliverable EG - ETSI Guide Informative Guidance on handling technical standardization activity in whole or major parts of the Technical Organization ETSI Special Report Informative General ETSI member or public interest Also, deliverable with dynamic content generated by software application on ETSI web site Reference: ETSI Technical Working Procedures, Annexes A & E Choice of deliverable type (2)

8 Starting the preparation of an ETSI deliverable Each ETSI deliverable is produced as the result of an ETSI work item An ETSI work item is a description of a standardization task approved by an ETSI Technical Body (Technical Committee etc) and adopted by the ETSI members A proposal for a new ETSI work item must be supported by at least four ETSI full and/or associate members The supporting members are expected to contribute to the new work A single individual is named as Rapporteur for the ETSI work item, and he/she acts as the prime contact point on technical matters and for information on progress throughout the drafting phases

9 Initiation of a Work Item The description of a task defined in terms of the: title intended deliverable type technical scope, including field of application schedule of tasks for its production identities of the supporting members identity of the rapporteur

10 Applies ONLY to European Standards (EN) including Harmonized Standards and Community Specifications ETSI starts work on an EN… National Standards Organisations (NSOs) and ETSI Members are required to stop any national standards work that could prejudice that EN ("Standstill") ETSI publishes the EN… NSOs are required to adopt the EN at national level… ("Transposition") …and to withdraw any conflicting national standards ("Withdrawal") Standstill, national transposition and withdrawal

The ETSI standards process 11 Work Item introduced Approval of draft by technical committee Publication IMMEDIATE If Technical Specification or Technical Report DraftingApproval 6 – 12 MONTHS If European Standard NSO Enquiry and Vote 90 DAYS If ETSI Standard or ETSI Guide ETSI Member vote Drafting in technical committee, working group or Specialist Task Force

Drafting Drafting is carried out by the Technical Committee or one of its Working Groups possibly with the assistance of a Specialist Task Force a group of experts working together under contract with ETSI normally working in the ETSI premises in France Specialist Task Forces give ETSI a competitive advantage by accelerating the development of urgently needed deliverables Experts for the Specialist Task Forces are proposed by ETSI Members The Specialist Task Force works under the technical guidance of the relevant Technical Committee 12

Drafting ETSI has plenty of help about drafting standards! ETSI Drafting Rules Making Better Standards web site editHelp! service and web site Guides for Committee/Working Group Chairmen Rapporteurs STF Experts Document templates Terminology and Use of English Downloads Helpline … and lots more! 13

14

15

Centre for Testing & Interoperability (CTI) CTI experts can be attached to a standardization group CTI experts can provide: Protocol engineering know-how Dedicated language and tool know-how Testing and test tools know-how Key assistance in planning interoperability related activities Project management 16

Finding out about work in progress 17

The ETSI standards process 18 Work Item introduced Approval of draft by technical committee Publication IMMEDIATE If Technical Specification or Technical Report DraftingApproval 6 – 12 MONTHS If European Standard NSO Enquiry and Vote 90 DAYS If ETSI Standard or ETSI Guide ETSI Member vote Drafting in technical committee, working group or Specialist Task Force

Approval The relevant Technical Committee is responsible for approving the draft What happened then depends on the type of deliverable… Web-based approval tools are available for all types of ETSI deliverable 19

Decision Support An optional web-based tool for use by Technical Committees 20

Decision Support 21

22 Who approves what? Technical Body ETSI Technical Reports (TR) ETSI Technical Specifications (TS) Members ETSI Guides (EG) ETSI Standards (ES) Public (National Standards Organizations) EN (telecommunications series) including Harmonized Standards and Community Specifications Industry Specification Group ETSI Group Specifications (GS)

23 ETSI Technical Body approval ETSI Technical Reports (TR) ETSI Technical Specifications (TS) approval can be instantaneous 60 days to publication draft sent to ETSI Secretariat within 30 days of TB approval publication within 30 days provided draft complies with ETSI Drafting Rules

24 Industry Specification Group approval ETSI Group Specifications (GS) decision-making procedures defined in Groups Terms of Reference draft sent to ETSI Secretariat within 30 days of TB approval publication within 30 days provided draft complies with ETSI Drafting Rules

25 ETSI Membership approval (MAP) ETSI Guides (EG) ETSI Standards (ES) 19 weeks to publication draft sent to ETSI Secretariat within 30 days of TB approval ETSI Secretariat prepares draft for vote within 30 days 60 day voting phase weighted individual voting by Full & Associate Members voting report by Secretariat within 15 days if successful, publication within 15 days without modification, except editorial changes

26 Public Approval EN (telecommunications series) involves National Standards Organizations involves Public Enquiry and public Vote allowance has to be made for summer holidays! weighted national voting Two-step procedure (TAP) 11,5 - 12,5 months One-step procedure (OAP) months draft must be non-contentious suits conversion from ES to EN or the deliverable has a high degree of maturity

27 The Two-step approval procedure - for ENs Drafting by Technical Body ETSI processing 1 Month 2 Weeks 1 Month2 Weeks Months2 Months2 - 2,5 Months2 Weeks 11,5 - 12,5 Months Technical Body Approval Draft received by Secretariat Start of Public Enquiry End of Public Enquiry Start of Voting End of Voting Adoption Publication Public Enquiry ETSI review Technical Body review ETSI processing Voting ETSI evaluation Publication

28 The One-step approval procedure - for ENs Drafting by Technical Body ETSI processing 1 Month 2 Weeks Months 2 Weeks Technical Body Approval Draft received by Secretariat Start of Public Enquiry & Voting End of Public Enquiry & Voting Adoption Publication ETSI evaluation Publication Months Combined Public Enquiry and Vote

29 The e-Approval application - for ES, EG and EN

The ETSI standards process 30 Work Item introduced Approval of draft by technical committee Publication IMMEDIATE If Technical Specification or Technical Report DraftingApproval 6 – 12 MONTHS If European Standard NSO Enquiry and Vote 90 DAYS If ETSI Standard or ETSI Guide ETSI Member vote Drafting in technical committee, working group or Specialist Task Force

Publication All ETSI deliverables are published on the ETSI portal and can be downloaded free of charge Deliverables can be searched for using the PDA application… … or directly accessed if you know the document number and version 31

Publications Download Area 32

Direct access to published deliverables 33

The ETSI standards process 34 Work Item introduced Approval of draft by technical committee Publication IMMEDIATE If Technical Specification or Technical Report DraftingApproval 6 – 12 MONTHS If European Standard NSO Enquiry and Vote 90 DAYS If ETSI Standard or ETSI Guide ETSI Member vote Drafting in technical committee, working group or Specialist Task Force

Remember… editHelp! is there to help you! 35 Web: Phone: In ETSI:Einstein building, ground floor