Visual Management – an Overview. What is Visual Management? Visual Management is a set of techniques for creating a workplace embracing visual communication.

Slides:



Advertisements
Similar presentations
 Sort the necessary from the unnecessary  Use the Red-Tag technique to highlight unneeded items  Manage all removed items Separate the essential from.
Advertisements

Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
A3 Reports. Aims & Objectives Target Audience : Anyone who has to write a report or proposal Purpose of Module : To confirm understanding and benefits.
Giving Meaning To Values. Meaning to Values (1) For any set of values to have an impact, they need to be clearly defined and aligned to the overall process.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Productive Maintenance
How will this benefit your organisation? More problems will be solved! Fewer escalations of issues to managers as people gain confidence to address problems.
Introduction to 6S.
MSE507 Lean Manufacturing
5S Essentials Five action verbs.
Just-In-Time “Eliminate Waste”.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Lean Training 5S. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
 There are five primary 5S phases: 1.Sort. 2.Straighten. 3.Shine. 4.Standardize. 5.Sustain. The 5 S's Kamalnathan, MIM.
NHS Highland Quality and Patient Safety Framework
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
Hazard Identification
HA Lean Guides An Introduction to Lean Visual Management An Introduction to the Collaborative Planning System February 2011.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Topic 4 How organisations promote quality care Codes of Practice
When education goes lean. The right process will produce the right results. Presented by: Michael Cermak Director of Career Education Rockford Public Schools.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
Lunch n’ Learn Simple Visuals in the Workplace Welcome !
BUILD WITH US. ™ 5S – The Foundation for Improvements Safety the “6 th ” S.
1.Provide real-time information on work place status by a combination of simple, effective visual information aids that allow employees to understand.
LEAN for Competitive Advantage and Customer Delight – Case study of an Application Development (AD) project Agile India 資工四 黃泓霖 1.
MANAGEMENT SUPPORT SYSTEMS II 7. Business Intelligence.
Visual Management Quick Review
Project monitoring and Control
Total Productive Maintenance (TPM)
It’s All About Engagement Positive Disruption Presenter: Paul Spencer, PMP 2.
5S Workplace Audit Category Item Level Sort Store Shine Standardize
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
Manufacturing Engineering Statistical Process Control (SPC) Tools: Gantt Chart Copyright © Texas Education Agency, All rights reserved. 1 NO DEFECTS.
A European campaign on Risk Assessment Common errors in Risk Assessment.
5-S Quick Learning Module Industrial Solutions, Inc.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Responsible Care® Health & Safety Task Force – 06 H&S.
Continuous Improvement (CI) Overview A quick review of principles, methodology, and tools.
A guide to... Safe Systems of Work.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
CfE Business Education The Role of Human Resources – Lesson 3 HUMAN RESOURCES.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
Dashboarding with IBM Cognos Cognos User Group August 5th 2011.
Managing programs that promote personal effectiveness.
Visual Management Visual Management.
6 S System The Visual Workplace Directorate of Training and Education
Version 3.0.
ECEYE208A Manage a children’s service Week 6 © Romi Sharma 2012.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
PREVENTION. The management should adopt well-defined, precise, clear and progressive HRM policies for the maintenance of good industrial relations in.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
LEAN OPERATIONS PROVIDE PRODUCTS OR SERVICES IN RIGHT QUANTITY OF RIGHT QUALITY AND AT RIGHT TIME.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Driving to Results: Key Changes and Leadership Behaviors: Management Systems to Deploy & Sustain the Improvements David Munch M.D. IHI Faculty Chief Clinical.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
Workplace Organization (WPO) and Visual Controls (VC)
IENG 451 / 452 Stability: Visual Management and 5S
LEAN ORGANIZATION SUMMARY
5S TRAINING.
5S workplace organisation
Presentation transcript:

Visual Management – an Overview

What is Visual Management? Visual Management is a set of techniques for creating a workplace embracing visual communication and control throughout the work environment. The visual management philosophy is underpinned by the view that ‘what gets measured & displayed gets done’ It makes it easy to understand the processes which have been put into place

The Vision The work environment should be immaculate, safe and self-cleaning Standards are easy to recognise and abnormal conditions are quickly identified, enabling speedy analysis & resolution. Performance and progress are readily apparent to employees. Plans are in place to significantly reduce or remove waste and defects in the process.

Two Tools of Visual Management Displays To make staff aware of related data and information – charts, graphs etc Controls To guide the action of staff members – sign boards, dos and don’ts signs

Visual Display Using visual mechanisms to communicate information Visual display builds on the fourth ‘S’ (standardise) Show how to do the job (standard, agreed- upon best practice). Show how things are used. Show performance status. Identify hazardous areas

Types of Visual Display Product and process information Area information, boundaries Standard work instructions - Standard work charts, etc Performance information - tracking against key metrics Status of current issues and improvement activities Schedules of maintenance, calibration or other support activities

Visual Control Goes beyond simply tracking and reporting performance and any Highlights deviations that occur from the planned outcomes. Many forms of visual control exist in the Lean workplace

Types of Visual Control Shadow boards Indicators on various items e.g. gauges Heijunka boards – showing the status of daily schedules Design pull systems (Kanban)

Benefits of Visual Management Leads to information sharing. Facilitates worker autonomy. Supports elimination of waste. Fosters continuous improvement. Exposes abnormalities. Enables quick response & recovery. Promotes prevention. Maintains the gains.

Steps Required To Implement A Visual Management System There are three basic steps: 1)Organise the workplace using 6S 2)Ensure that all required work standards, instruction and related information are clearly displayed in workplace 3)Control workplace processes by exposing and stopping errors and by preventing future occurrences