TC INT #21 SUMMARY © ETSI 2013. All rights reserved.

Slides:



Advertisements
Similar presentations
Name of patternPrimary Base 10 Blocks PRINT IN COLOR AND ON CARD STOCK, IF POSSIBLE Suggested GradesK at the end of school; 1 st - anytime 2 nd at the.
Advertisements

Advanced Piloting Cruise Plot.
Kapitel 10. Copyright © Houghton Mifflin Company. All rights reserved.10 | 2 1. The passive voice.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration ETSI ETSI Jørgen Friis, VP ETSI SES (Standards Enabling Services) Document No: GSC-16-PLEN-XX.
TC PLT Liaison to E2NA Doc: E2NA(13)06_008 LS_E2NA_TC_PLT Source: TC PLT Chair Agenda item: For: Info © ETSI All rights reserved.
ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
EP E2NA Meeting # 6 –Wrap up Closing plenary notes, Jun 20, 2013 Co-Located meetings E2NA plenaries and WGs M493 #15 NTECH #3 INT #21 AFI #13 DECT #57.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
THE WORK AT ANTIOCH. I. WORKED ACCORDING TO ABILITY, Acts 13:1-3 A. "Ministered," v. 3; Eph. 4:11-13; 1 Pet. 4:11; 1 Cor. 12: 14-22; Matt. 25:15, 21,
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Slippery Slope
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Immunobiology: The Immune System in Health & Disease Sixth Edition
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
CpSc 3220 Designing a Database
Nation of Men! Elder Olen McCardell, Director Ministry Plan: NOM Year of our Lord: 2013.
DISTRIBUSI PROBABILITAS KONTINYU Referensi : Walpole, RonaldWalpole. R.E., Myers, R.H., Myers, S.L., and Ye, K Probability & Statistics for Engineers.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Conformance and Interoperability Testing Jørgen Friis VP ETSI SES (Standards Enabling Services)
TC INT STATUS OF DIAMETER TEST SPECIFICATION
Presentation transcript:

TC INT #21 SUMMARY © ETSI All rights reserved

Summary of TC INT#21 Review of INT ToRs INT ToRs has been reviewed to adapt the content after E2NA and to align to the real activity already performed. Presentation letter for the Board has been WebRTC and SDN As a follow up of the presentation from Fraunhofer Fokus on WebRTC – IMS Interoperability and SDN/OpenFlow TC INT decided to draft a questionnaire to be sent to all the TC INT contacts in order to evaluate interest for a plugtests in the area. ETSI/BOARD(13)92_0XX 2

Summary of TC INT#21 BFX presentation TC INT received presentation from Broadforward for BFX gateways of signalling interfaces. The topic could be in the E2NA and NTECH scope. Presentation is available at the INT(13)000044_BFX_Introduction.pdf STF Validation of Diameter Rx Gx interfaces Metaswitch, Tektronix Communication are already contributing to the evaluation. NIST, Telecom Italia and Broadforward are evaluating some contribution to complete the validation. New Work item Conformance test specification for EPC Diameter interfaces S6a, S9, S11 New STF Validation of 3GPP R10 Test specification. SUT already available from Italtel and Iskratel Develop of EPC Diameter test Speccification over S6a and S9 ETSI/BOARD(13)92_0XX 3

Possible Joint activities in E2NA ENUM testing: in the past TC INT has developed within TS interoperability test specification ENUM testing according to GSMA IR67 TC INT is open to work on E2NA/NTECH specs for ENUM scenarios for the fixed/mobile inteconnection producing TS and insert in plugtests event ETSI/BOARD(13)92_0XX 4

TC INT presentations at conferences Broadband World Forum Amsterdam on October 2013 (Under Evaluation) LTE Voice Summit 2013 London on 1 st and 2 nd October (Under Evaluation) Fraunhofer Fuseco Forum November 2013 ETSI/BOARD(13)92_0XX 5

TC INT meeting calendar INT#22 Sophia Antipolis 3-5 September 2013 INT#23 Sophia Antipolis December 2013 INT#24 tbd March 2014 INT#25 tbd June 2014 INT#26 tbd 2-4 September 2014 INT#27 tbd December 2014 ETSI/BOARD(13)92_0XX 6