Mary Dunne 7 February 2013 Procurement Conference To what extent is it possible to reward good prior performance or punish poor past performance.

Slides:



Advertisements
Similar presentations
© International Road Transport Union (IRU) 2009 Regional TIR Seminar Tunis, 3 rd and 4th June 2009 Raphaël Hirt Head – TIR Carnet Management and SafeTIR.
Advertisements

Personnel Background Investigations. Introduction The interests of the national security require that all persons privileged to be employed in the departments.
HAYLEA CAMPBELL SUSTAINABLE PROCUREMENT IN THE EU.
The Data Protection (Jersey) Law 2005.
UNCITRAL United Nations Commission on International Trade Law Developing local procurement legislation - Adapting the UNICITRAL Model Law Caroline Nicholas.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
The ISO 9002 Quality Assurance Management System
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Procurement Workshop 27 th June 2012 Alison Riley Senior Procurement Officer.
EU Criminal Law Introduction, Lisbon Treaty. EU criminal legislation EU cannot adopt a general EU criminal code EU cannot adopt a general EU criminal.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 “Summary results of the comparative survey on the transposition of Directive 2009/81” Col. Paolo LIZZA IT MoD SGD-DNA Rome, 12 july 2011”
PROMOTING HUMAN RIGHTS COMPLIANCE THROUGH PUBLIC PROCUREMENT (REGULATION): THE NEW EUROPEAN DIRECTIVE M. VOGEL VU UNIVERSITY AMSTERDAM.
ICEL PROCUREMENT CONFERENCE Kevin Kelly McCann FitzGerald Blackhall Place, Dublin 7 7 February 2013.
Directorate-General for Translation EUROPEAN COMMISSION Tendering for EU projects – Why and how? London, 25 September 2008 Klaus Ahrend Head of Unit S.2.
Public Contracts Regulations 2015 (became law on 26th February 2015)
Contratación en los Organismos Internacionales de Propiedad Industrial Ignacio de Medrano Caballero Director Adjunto Área de Recursos Humanos 25/10/2011.
Sustainable Procurement and Community Benefits Getting ready for Procurement Reform in Scotland Jennifer Marshall.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Organ, body, authority Prof. Gyula Bándi. A reference to the competent organ or body, particularly to the competent authority, are part of legal regulation.
M. ANGELA JIMENEZ 1 UNIT 5. REGULATION OF EXTERNAL AUDIT IFAC AND E.C.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
Enhancement Measures on Teacher Appointment and Related Matters
OCR Nationals Level 3 Unit 3.  To understand how the Data Protection Act 1998 relates to the data you will be collecting, storing and processing  To.
Moving Forward With the African Dialogue Cross-Border Principles By Mary Gurure Manager, Legal Services and Compliance COMESA Competition Commission Lilongwe,
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Social Considerations in EC Public Procurement Loredana Puiu Internal Market & Services DG Directorate C: Public Procurement Policy.
Socially Responsible Public Procurement Ethical Procurement Christine Storry 25 March 2011.
Lecture 4. OUTCOMES What must the equity plan include?. What must affirmative action measures include? Which factors are taken into account in determining.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
STATE COMMITTEE for STANDARDIZATION of the REPUBLIC of BELARUS.
QUALITY MANAGEMENT STATEMENT
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
1 Public Procurement Local Government Network Conference Warsaw Thorsten Behnke 26 April 2005.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Of XX ©2015 PubKLearning. All rights reserved.1 Professor Christopher R. Yukins George Washington University Law School Washington, DC Comparing Causes.
Assessment Validation. MORE THAN YOU IMAGINE ASQA (Australian Skills Quality Authority) New National Regulator ASQA as of 1 July, 2011.
Tom McBride.  This report on the PPIR Project proposes a way of defining and formally recognising how professional engineers interact with, and respond.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
Evaluation of restrictions: art. 15 and art TAIEX Seminar on the EU Service Directive, 3 May 2007 Carlos Almaraz.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
ACCESS TO JUSTICE IN THE EUROPEAN UNION presentation JOHN HONTELEZ, SECRETARY GENERAL EUROPEAN ENVIRONMENTAL BUREAU Seminar Dublin 26 February 2010.
European Single Procurement Document – ESPD Directive 2014/24/EU Meeting of the Commission Government Experts Group on Public Procurement 2 and 3 July.
Commission Staff Working Document Free Movement of Workers in the Public Sector 18 January 2011 Ursula Scheuer European Commission DG Employment, Social.
Best practices related to procurement within a project (for part of the expenditure) implemented by the beneficiary itself (art. 67, par. 4 of Regulation.
Bangor University – 30 March 2012 Antitrust, Competition and Economic Regulation The proposed new EU procurement directive: do the new rules enhance SMEs'
Public procurement and human rights
PRESENTATION OF MONTENEGRO
Public procurement directives
Public Participation in Biofuels Voluntary
Evaluation Grids Evaluation Grids.
The Final Decision in the Environmental Impact Assessment Procedure in Ukraine as a Multilateral Agreement Tretiak Taras Associate Professor of National.
European case studies relating to the administrative approach
UK Legal Requirement for Notification of Serious Breaches of Good Clinical Practice or The Trial Protocol John Poland, PhD Senior Director, Regulatory.
Bid exclusion risks in Public Procurement Procedures With focus on Competition and new Data Protection rules related breaches 11 APRIL 2017.
Operationalizing Export Certification and Regionalization Programmes
MINISTRY OF ECONOMY AND FINANCE
Avv. Roberto Panetta LL.M. Ph.D. ISCL Secretary General
How to conduct Effective Stage-1 Audit
Andrea Sundstrand Associate Professor
Compliance in the Federal Acquisition Regulation in the European context University of Florida, January Professor Michal Kania University of Silesia.
Cross-Debarment Christopher Yukins.
Remedies in European public procurement
Competitive Dialogue/Competitive Procedure with Negotiation
Presentation transcript:

Mary Dunne 7 February 2013 Procurement Conference To what extent is it possible to reward good prior performance or punish poor past performance

1 Q To what extent is it possible to reward good prior performance or punish poor past performance? Under the current EU & Irish public procurement regime. Under the Proposed new Public Procurement Directives. A Past performance can be assessed at: Exclusion Stage: Articles 45 Directive 2004/18/EC & Reg 53 S.I. 329/2006.; Pre-Qualification/Section: Article 48 Directive 2004/18/EC & Reg 53 S.I. 329/2006

2 Mandatory Exclusion Article 45(1), Directive 2004/18/EC & Reg 53(1), SI 329/2006. A Contractor Authority shall exclude a candidate or tenderer where “to the knowledge of the authority [a candidate or tenderer] has been convicted of an offence involving: –participation in a prescribed criminal organisation; –corruption; –fraud; or –money laundering Evidence What evidence can the Contracting Authority rely on in order to exclude a candidate or tenderer?

3 Discretionary Exclusion Article 45(2) Directive 2004/18/EC &Reg 53, SI 329/2006 A Contracting Authority may exclude a candidate or tenderer in the case of: –bankruptcy or insolvency –found guilty of professional misconduct determined by a professional body –grave professional misconduct provable by means the authority can demonstrate –failure to pay social security, tax or levies –knowingly provided false or misleading information to the authority

4 Mandatory Exclusion Grounds Directive 45(2) & (3) - Regulation 53 –Judicial record or –A certificate issued by a competent judicial or administrative authority. These must be accepted as proof. The authority must ask tenderers to supply these documents but if it has doubts can obtain them themselves. –If the country in question does not issue the above documents if they do not cover the case in question the authority can accept: A declaration on oath; or A solemn declaration made before a person authorised for the purpose under law.

5 1 Bankruptcy/Insolvency Art 45(2)(a) and (b) – Reg 53(4)(a) and (5) same as mandatory exclusion evidence 2.Professional Misconduct same as mandatory exclusion evidence e.g. certificate of Good Standing from the Law Society 3.Failure to pay social security or tax Same as mandatory exclusion or a Tax Clearance Certificate Discretionary Exclusion Grounds

6 4Grave Professional Misconduct “Provable by [any] means that the authority can demonstrate”. No guidance is given in the Directive or the Irish Regulations. Decision of the Court of Justice in Praxis v Porzta Polska SA A contracting authority cannot automatically exclude an economic operator where the Contracting Authority has terminated a previous contract with that economic operator where the economic operator is responsible. Grave Professional Misconduct; “Denotes a wrongful intent or negligence of a certain gravity….Incorrect, imprecise or defective performance of a contract….does not automatically amount to grave misconduct. In addition in order to find whether “grave misconduct exists, a specific and individual assessment of the conduct…must be carried out.

7 Draft Directive Art 55(3)(d) – may exclude –“where the economic operator has shown significant or persist deficiencies in the performance of any substantive requirement under a prior contract or contracts of a similar nature with the same contracting authority”. To apply this ground of exclusion –Contracting authorities shall provide a method for the assessment of contractual performance that is based on objective and measurable criteria and applied in a systematic, consistent and transparent way; –plus, assessment to be communicated and opportunity to object to the findings and to obtain judicial protection; –and operator may provide evidence demonstrating its reliability.

8 Draft Directive (contd) Art 55(4) –Any candidate facing exclusion may provide evidence demonstrating its’ reliability despite the existence of the relevant ground for exclusion. –Candidates shall prove that it has compensated any damage, caused by the criminal offence or misconduct, clarified the facts or circumstances in a comprehensive manner by actively collaborating with the investigating authorities and taken concrete technical, organisational and personal measures that are appropriate to prevent further criminal offences or misconduct. Art 55(3) A contracting authority may exclude an economic operator where it is aware of any violation of obligations established by Union or international legislation in the field of social and labour and environmental law.

9 The Pre-Qualification Stage PQQ stage may serve two distinct purposes 1.Minimum Pass/Fail standards Does operator meet minimum standards of technical or professional ability? Article 44(2) – must be included in the tender notice. 2.Shortlisting Which operators should be selected to tender/negotiate/participate in dialogue? Both minimum and selection criteria are governed by the same provisions in Directive 2004/18/EC and the Irish Regulations Article 48 Directive 2004/18/EC Regulation 57, 58 and 59 of S.I. No 329/2006

10 Technical & Professional Ability “Technical and/or professional abilities of the economic operators shall be assessed and examined in accordance with paragraphs 2&3” –Experience in last 5 years (works) or 3 years (supplies and services) accompanied by certificate of satisfactory performance or references –Key team allocated to the contract –Description of technical facilities and measures used to ensure quality –Description of R&D facilities –A check on the production and technical capacity, quality measures and R&D facilities –Educational and professional qualifications of the contractor/managerial staff and in particular those persons responsible for providing the services –Environmental management measures –Average annual manpower and number of managerial staff for the last 3 years –Statement of tools, plant or technical equipment available –Samples descriptions and/or photos of products to be supplied –Quality control certificates confirming conformity with Specification

11 Selection Criteria The list of criteria in Article 48 and Regs is exhaustive. C-76/81 Transporoute [1982] ECR 417. Commission v Italy [1992] ECR I Art 48(5) Directive 2004/18/EC, 57 (4) and 59(4) provide that the contracting authority may assess the operatory’s “skills, efficiency, experience and reliability”. However, assessment of skills, efficiency, experience and reliability must be within the context of the criteria listed before in Article 48.

12 Award Criteria Past Performance not relevant and should never be included in award criteria Lianakis – Case C – 532/06