1 NuMI BEAM POSITION MONITOR via MAIN INJECTOR, and RECYCLER Brajesh Choudhary, 06.Mar.2003 MINOS Collaboration Meeting University of South Carolina, Columbia.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Instrumentation Specifications July 26, 2001 S. Childress Page 1 NuMI Specifications for NuMI Primary Beam Instrumentation.
Automated Beam Steering Software at FNAL Keith Engell Accelerator Controls.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
MI 1 REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE Brajesh Choudhary for the MI Dept.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron R. K. Kutschke †, J. Steimel, R.Webber, S. Wolbers, Fermilab*, Batavia,
SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Specifications of Tevatron BPM Upgrade Jim Steimel.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Anatomy of Accelerators Marty Peters Summer 2006.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
14-Oct-02MI/RR Dampers - G. W. Foster Beam Dampers for Main Injector and Recycler Bill Ashmanskas, Bill Foster, Dave Wildman Warren Schappert, Jim Crisp,
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Large Booster and Collider Ring
Limits on damping times
Beam Current Monitoring with ICT and BPM Electronics
Feed forward orbit corrections for the CLIC RTML
Electron Rings Eduard Pozdeyev.
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

1 NuMI BEAM POSITION MONITOR via MAIN INJECTOR, and RECYCLER Brajesh Choudhary, 06.Mar.2003 MINOS Collaboration Meeting University of South Carolina, Columbia.

2 FERMILAB ACCELERATOR COMPLEX MI/Boster Circumference m (474.2m7) MI harmonic No. 847=588 Booster Circumference 474.2m. Booster Harmonic No. 84 TeV Circumference 2000  m TeV Harmonic No NuMI

3 MAIN INJECTOR BASICS The Fermilab MI is a synchrocyclotron which accelerates:  Protons from 8.9GeV to 120GeV, for  anti-proton production  low intensity slow resonant extraction (slow spill) for test beam  high intensity slow spill for dedicated kaon experiments  high intensity fast single turn extraction for NuMI/MINOS  Protons from 8.9Gev to 150GeV for collider operation, and  Anti-protons from the Accumulator and the Recycler (when integrated) from 8.9GeV to 150GeV for collider operation. Only 6 Booster cycles are utilized to fill the MI, allowing rest of the space for the abort gap.

4 RECYCLER RING BASICS Recycler Ring is an 8 GeV storage ring constructed using permanent magnets. It is expected to increase the Tevatron collider luminosity in two ways:  Maintain high anti-proton production rate in the Accumulator by periodically sending the anti-proton stack to the Recycler, and  By recycling the left over anti-protons from the Tevatron to the Recycler and further cooling it, before injecting again in the Tevatron. [May Not Happen - AAC has advised against it – 4-6, Feb 2003.]

5 WHAT IS A BPM?  A beam position monitor is a non-intercepting device, used in particle accelerators and beam lines to measure the beam position by processing the beam induced signal on the pickup electrodes.  In the limit of very high beam energy, the fields are pure transverse electric and magnetic(TEM). So, if a beam is displaced from the center of a hollow conducting enclosure, the magnetic and electric fields are modified accordingly. Detailed knowledge of how the magnetic and electric fields depend on the beam position allows accurate determination of the beam position.  A conventional beam position monitor has a pair of electrodes (or 2 pairs, if 2 beam position coordinates are to be measured) on which signals are induced. The ratio of the amplitudes of the induced signals at the carrier frequency, either the beam-bunching frequency or a harmonic, is uniquely related to the beam position.

6 WHY DO WE NEED A PRECISION BPM SYSTEM? A precision BPM system is needed to:  Reproducibly center the orbit in the physical aperture of the machine, thereby maximizing acceptance (1mm position error leads to 10% loss in aperture)  Verify stable orbit position from day to day, ensuring stable tuning condition  Have an accurate turn by turn measurement (ex: to measure lattice function of the machine, non-linear properties of the lattice, injection oscillation etc. etc.)  Understand geometrical and optical defects in the ring in terms of a calibrated geometrical survey  Understand and interpret the results of a beam experiments which are expected to produce static or transient beam orbit changes (pinging, orbit bumps, synchrotron oscillation, understanding the kicker behavior for NuMI)  Monitor and adjust the beam position in the injection and extraction lines, and the single turn orbit between the lambertson and the kicker in the ring  Independently measure orbit closure and injection oscillations.

7 RECYCLER BPMs Split tube BPM Design End View Top View Pictures - Courtesy Jim Crisp 9.6cm 4.4cm 30cm

8 MI BPMs MI Ring BPM Large Aperture BPM Long face outer/inner size 4.75”/4.625” Short face outer/inner size 2.1”/1.9” Plate diameter outer/inner 4.75”/4.625”

9 NuMI SPLIT PIPE BPMs Transport BPM Target BPM

10 BPMs TO BE UPGRADED  In the RR we need to upgrade 104 horizontal and 107 vertical beam position monitors. We also need to upgrade 26 BPMs in the associated transfer lines. The total estimated cost is about $920K. (Phyics requirements defined + Technology approved + Purchase Order placed)  In the MI, we need to upgrade 203 ring BPM and 5 large aperture BPM. We also need to upgrade 64 BPM in MI8 line, 16 BPM in A1line, 15 BPM in P1 line and 11 BPM in P2 line. The total estimated cost will be ~$1.2M. (Physics requirements defined.)  NuMI needs only 26 BPM. The estimated cost will be around $100K. (Physics requirements defined.)

11 WHY UPGRADE MI BPM?  Present MI BPM electronics is blind to 2.5MHz time structure, and unreliable for position measurement of a single coalesced 53MHz bunch, as well as for  bunches of 53MHz beam.  The system is quite limited. It is essentially a single user, single buffer system. The data in the buffer gets overwritten every time any valid MI reset occurs.  The system is self (beam intensity threshold) triggered. It does not have a general purpose beam synch clock based trigger.  The system has limited resolution (beyond  10 mm) because of the non-linearity of AM to PM detection, the BPM geometry, and the 8-bit ADC used in the present electronics.  The firmware is written in Z80 machine code, which is now obsolete. Only one person (Alan Baumbaugh) at the laboratory is familiar with the code. Sharon Lackey used it ~15yrs ago for switchyard, and if it is really needed she can be called to help.  The system is 20+ years old and is approaching its end-of-life.

12 WHAT IS NEEDED ?  The MI BPM electronics should be functional at 2.5MHz, & 53MHz time structure. It should be reliable for position measurement either with a single Booster bunch, or a single coalesced bunch (53 MHz), as well as with multiple bunches, and multiple batches in the MI.  The system should be event driven to support multi-user with multi-buffer, so that different type of data can be taken during the same MI cycle, and the data taken with a particular MI reset does not overwrite the data taken with other MI reset.  Attenuation due to varying cable lengths, limits the “dynamic range” of the system and thus detection of small bunch intensities. Gain should be adjusted to account for this variation.  The system should at user option be self (beam intensity threshold) triggered as well as beam synch. clock triggered.  The present(old) multi-bus based system with 8-bit ADC computer interface should be replaced by a modern and better supported architecture (for ex: with a VME contained system) using 12/14-bit ADCs (for a bit resolution of ~50  m). [Engineers to determine how this condition will be met].

13 WHAT DO WE NEED TO MEASURE? We need to measure:  Beam Position at every BPM  Beam Intensity at every BPM, and  Calibrate every BPM properly.

14 Beam Position Horizontal(  m)Vertical(  m)  ± 5mm ~100  m ~150  m 5mm  x  10mm ~150  m  m 10mm  x  15mm  m 15mm  x  20mm  m  ± 20mm 1-4 mm DESIGN RESOLUTION – MI BPM Measured Resolution for beam position  ± 5mm varies between ~  m. Lets preserve the level of resolution.

15 MEASURED RESOLUTION

16 MEASURED RESOLUTION

17 1. Protons or anti-protons to/from the RR, and anti-protons from the Accumulator (2.5 MHz) 0.5E10/bunch (2.0E10 total) to 7.5E10/bunch (30E10 total).  t)= 25ns to 50ns. 2. Protons from the Booster (53MHz) (19ns spacing) From 1 to 84 bunches. Min. Intensity = 0.5E10/bunch. Max. Intensity = 12E10/bunch 3. Protons to the Tevatron (5-9 bunches, typically 7) (53 MHz) (19 ns spacing) Up to 30 Booster bunch for tune up. Each bunch intensity between 1-12E10. For Collider running – up to 4.5E10/bunch or 30E10 after coalescing. (27E10 – TeV Run IIB doc.) 4. Anti-Protons to(from) the Tevatron. (53 MHz bunch in 2.5 MHz spacing). 36 single bunches, 4 bunches each in 9 separate batch (4X9), each bunch with intensity of  11E10(5E10). (9.4E10 – TeV Run IIB doc.) 5. For the Fixed Target Running. (including NuMI/MINOS) (53MHz) 0.5E10 to 12E10 per bunch for bunches. DYNAMIC RANGE FOR MI DYNAMIC RANGE OF 24 The BPM system should be capable of measuring beam position with 6 batches in the MI.

18 MEASUREMENT PRECISION OVER THE FULL DYNAMIC RANGE - MI This is a 3  requirement, or 99.73% of the measurements should be within these limits. Position Accuracy – 0.40mm  5% of the actual position. Difference between two measurements on pulses with stable beam. It covers long term stability and resolution. Calibration precision of – 0.20mm ± 1.25% of the the actual position

19 BPMs in NuMI BEAM LINE  The NuMI beam line will have a total of 26 BPMs  A large aperture BPM with 6” long plates and a 4.625” aperture, at Q608 near Lambertson,  21 split pipe BPM called the transport BPM. The outer/inner diameter of the split pipe is 4”(10.1cm)/3.875”(9.8cm, aperture), and  4 split pipe BPM called the target BPM. The outer/inner diameter of the split pipe is 2.125”(5.4cm)/2”(5.1cm, aperture)  The position accuracy, and the stability(calibration) requirement for the transport and target BPM differ (as shown in table later).  Every BPM needs to measure the beam position individually for each batch of the proton beam.  For at least one house (for the 4 target BPM), the BPM system should be capable of making multiple measurements within at-least one batch of the proton beam.

20 NuMI MEASUREMENT PRECISION/BATCH (3  REQUIREMENT) Transport BPM (particle/bunch) Target BPM (particle/bunch) Position Accuracy  1E10  0.5E10 (over ± 20mm)  1E10  0.5E10 (over ± 6mm) Calibration Accuracy  1E10  0.5E10 (over ± 20mm)  1E10  0.5E10 (over ± 6mm) Intensity Precision  5% for Position  2% for Calibration  5% for Position  2% for Calibration If the transport BPM meets the MI BPM precision requirement, NuMI will be satisfied.

21 NuMI PRECISION  The precision for “Transport BPM” comes from the knowledge of beam control requirements based on previous usage of ‘Autotune’ beam control, as to be used in NuMI. For example, the corresponding numbers for some experiments were:  Switchyard system - activate tuning for 0.4 mm deviation from nominal (0.2 mm for septa lineup); then, correct to < 0.2mm (0.1 mm) accuracy. (NuMI has no septa).  KTeV (with a very large targeting optics magnification) - activate for 1.0 mm deviation along the transport (0.05 mm deviation at target) The precisions were determined initially from detailed calculations of error functions using transport matrices, and verified in beam operation.  The precision for “Target BPM” comes from MINOS target width of 6.4mm, and the upstream baffle beam hole diameter of 11mm.

22 DIGITAL DOWN CONVERSION  Sample the waveform at a fixed sampling rate.  Multiply the sample by sine and cosine function of the bunch frequency (I and Q) and integrate over a fixed gate.  The signal strength measurement I 2 +Q 2 is independent of the phase of the signal.  Tested with EchoTek 814, 8 channel 60MHz 14bit A/D’s  AD6620 Digital Receiver – Digital mixer followed by 3 digital filters (for integration and smoothing of the edges).  VME format  Like digital radio – Can be tuned to receive essentially any frequency 89KHz, 2.5MHz, and 53 MHz.

23 “A - B” gives bunch-by-bunch “in-phase” signal Vector Sum sqrt(I**2 +Q**2) is insensitive to clock jitter “D - (C+E)/2” gives bunch-by-bunch “out-of-phase” or “quadrature” signal IN-PHASE & QUADRATURE SAMPLING Argument for sampling at 4 X Frequency to be sampled Courtesy : BILL FOSTER

24 DDC TEST RESULTS WITH 53MHz BEAM Courtesy: WARREN SCHAPPERT Sample Number – 17ns sampling Raw ADC Sampling of 84 consecutive 53MHz(19ns) waveform at every 17ns (60MHz clock). One would like to sample at twice or more of the frequency rate. Ideally at 106MHz+. Best at 212MHz. Under Sampled. But due to long train of pulses (84 bunches) one can get away with under sampling.

25 DDC TEST RESULTS WITH 53MHz BEAM Courtesy: WARREN SCHAPPERT Batch Position (Average of 84 Bunches)  The measurement was done in MI54 line, in front of MiniBoone hall.  Beam moving around.  Measured resolution is 0.18% of the aperture.  Intrinsic resolution of the BPM will be better than the number presented here.

26 DDC TEST RESULTS WITH 53MHz BEAM Courtesy: WARREN SCHAPPERT  Resolution is limited due to beam motion.  Intrinsic resolution of the BPM better than measurement presented here.  Being worked upon. Moving Beam

27  Beam Position Measurement Precision with 2.5MHz Beam Structure for IBEAM = 1.24E11  Measured RMS = 10 – 20 mm  The beam position is very stable for repeated injection with different beam currents. MEASUREMENT PRECISION WITH DDC IN THE RECYCLER

28 SCHEDULE and SUMMARY SCHEDULE:  NuMI time frame is independent of MI needs. The technology decision for the NuMI BPM must be taken before the DOE review in 6/2003, and the system should be ready by the spring of SUMMARY:  NuMI BPM physics requirements have been defined. It is needed to commission the beam line, and will be ready in time.