Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.

Slides:



Advertisements
Similar presentations
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Advertisements

Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Current Assessment and Future Prospects Student : Mahmoud Qassrawi Mo’taz Abboshi Raja Rabaya Dr: Khalid Al-Sahli Mon 20/05/2013.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
The Transit Metropolis. What is a Transit Metropolis? Transit metropolis is a region where a ‘workable fit’ exists between transit services and urban.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Project Introduction Methodology Data Collection Data Analysis Counter Measure for Improving Quality of Traffic Counter Measure for Improving Safety Performance.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
Final Exam Tuesday, December 9 2:30 – 4:20 pm 121 Raitt Hall Open book
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
Norman W. Garrick Travel Flow Data Some Basic Concepts Good travel flow data for all modes of travel is important for transportation planning and design.
TRIP ASSIGNMENT.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
Center City Access Strategy A Transportation Vision for Growth and Access.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Transportation and Cities Mark Magalotti P.E. Senior Lecturer University of Pittsburgh School of Engineering Department of Civil and Environmental Engineering.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Making Way for Public Rapid Transit in South Asia and its Impact on Energy and Environment Bangalore, Dhaka and Colombo Ranjan Kumar Bose & Sharad Gokhale.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Prepared by Hakam J. AarajQadri H. Shaheen Mutaz H. O’deh Under the supervision of Prof. Dr. Sameer A. Abu-Eisheh “ Moh’d Bin Rashid Al-Maktom Road ” Design.
Interpreting Demand and Capacity for Street and Highway Design Lecture 6 CE 5720 Norman Garrick Norman W. Garrick.
RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
Roads & Traffic Department College Green Public Transport Priority measure.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Welcome. Traffic Analysis & Design for Al-Biereh City Network Prepared By: Mahfouz Hassoun Amjad Khuffash Fadi Jarraraa Supervised By: Dr. Khalid Al-Sahili.
Traffic Flow Parameters Surface Street Application.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Analyzing the Mobility Impacts of TOD Level of Service in Transit Oriented Districts Service for Who?
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Making Headways Smart Card Fare Payment and Bus Dwell Time in Los Angeles Daniel Shockley Fehr & Peers Julia Salinas Los Angeles Metropolitan Transportation.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Amal S. Kumarage 4 th November 2015.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
Urban Land Uses 6 Land Classifications. 1.0 Residential Land Uses includes all the places where people live often takes up to 40% or more of the developed.
Evaluation and Re-Design Haifa and Yafa Streets.
Towards More Sustainable Mobility in Nablus City, Palestine
Bus Rapid Transit (BRT) System: Nablus Case study
Traffic System Management for “Tulkarem”
Fishermans Bend Draft Framework Transport Recommendations
Evaluation and Redesign Faisal and Amman Streets
Bus Rapid Transit Study
Kabinkový systém electrically powered - 2kW continuous
Graduation Project Thesis: Redesign of Faisal Street-Nablus
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Comparative Visualization
Presentation transcript:

Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the West Bank with around 20,000 students.

Many businesses have either moved from or have been established outside Nablus. Three complexes were constructed to serve the inter-city public transportation in Nablus City.

Current Problems Congestion Delay Safety Pollution Time waste and fuel consumption Economic view

Objectives To improve the current traffic system in order to create a new system that connect the internal and external movements through the city. Applicable solution to solve the current problems for at least 20 years.

Data Collection Composition Maps Photos Traffic counts Average headway Routes specification Number of spaces

Table 2.1: Data collection form

Table 3.1: Total number of vehicles entering and leaving the complexes over two hours period Public transport complex Representative day (Monday, Tuesday) Peak day (Thursday) Inbound OutboundInboundOutbound Western complex serves cities Western complex serves villages Eastern complex

Table 3.2: Total number of registered vehicles and parking spaces Public-transport complex Number of available parking spaces Number of registered vehicles Western complex serves cities Western complex serves villages Eastern complex31334

Solutions Reallocation of the public transport complexes away from the CBD. Providing an internal transport system.

Reallocation the complexes Two separate public transport complexes at the two outskirts of the city. Two available land spaces each is around 17 donums.

to estimate the number of passengers during the project period. The following relationship was used:

The project has a design period of 20 years. An assumed value of 1.5% is considered as Passenger’s growth rate passengers/hr is the current maximum number of passengers(271 veh/hr)

Total area of 4.6 dunoms is required as parking spaces and circulation area for vehicles in the new western public transport complex. Only 3.2 dunoms required for the eastern complex.

Remaining area can be used as vehicles storage, private cars parking “ park and ride”,coffee shops and restaurants, shopping centers, waiting hall, etc

Internal Public Transport System Connect between the suggested locations of the public transport complexes. Cover the needs of the city. Several options can be suggested as internal transport system.

International Systems of Internal Public Transportation Light Rail System

Cable Cars System: either traditional or modern

Bus Rapid Transit : provide faster than an ordinary bus line

Trams

Why Tram? Provide higher capacity service than buses. Load faster that other type of vehicles. Trams’ stops are easily accessible Right-of-way are narrower than for buses.

Can adapt to the number of passengers. Can be driven from either end. Create less pollution than the vehicles using rubber tires. Efficient and operating costs are low.

Distance reserved by trams from each street along tram path is around 7 meters except when the two track separate at Faisal street. The distance will be 4 meters.

StreetWidthRemaining width after tram construction for each direction Comments Al-Ziot Street Jamal abd Al-Naser Street Faisal Street at the separation of the track Faisal Street after the two tracks meet again (around 500m long) 154Widening is required Haifa Street

Map shows the trams routes served during the day hours

Routes served by two trams during night hours

Capacity of the tram was calculated based on the following assumptions Tram will carry 60% of the whole number of passengers. The other 40% may not need to use the tram to go into or out of the city center.

Two trams will serve each public transport complex. Each tram needs an estimated time of 30 minutes to complete one round (including stops).

The two trams serving one route will be separated by 15 minutes. Most common vehicle is currently the shared-taxi which carries 7 passengers Annual growth rate of 1.5% for passenger demand.

Average number of passengers using tram/15min Number of passengers using tram/hr Number of passengers/hr Number of veh/hr Number of years

For a design period of 20 years the tram required to carry 383 every 30 minutes. Tram of 400 capacity will be efficient to serve the city such as the tram in Stockholm. 25% of daily trips to Balata Camp and Al-Ain Camp will be replaced by the tram.

RouteNumber of trips per hour Balata refugee camp 240 Ain Beit Al-ma’ camp115

Faisal street is considered as a multilane highway. LOS for Faisal street was calculated by using HCS2000 program (Highway Capacity Software )

The current Level of service for Faisal street is D which is resulted from the high volume of traffic along the street. The provision of tram along Faisal Street will improve the LOS to become C.

Project Constraints The studied project will serve for 20 years. Available budget. Tram transit system feasibility.

Bus rapid transit can be considered as an alternative transportation system for the near future. The BRT will follow the same route designed for the tram.

Recommendations Study the impact of the tram on the overall movement of traffic along and crossing the tram path at intersection. Provide a preemption system at intersections controlled by signals to give priority for the tram path.

Conduct a feasibility study for the suggested system to take into consideration capital and operating costs of the tram system, estimated impact on the overall traffic operation for the network impacted by the tram, etc.

Consider overpass for tram at intersection with major location in the CBD area. Study for the suggested tunnel of pedestrians that will connect the main station at Al- Watani Hospital with the CBD area.

THE END