Project Plan for VMC
VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour = 320 hr] Subsystem Development [1.3.0] [labor-hour = 1250 hr] System Integration and Testing [1.4.0] [labor-hour = 100 hr] Purchase [1.5.0] [labor-hour = 20 hr] Project Support [1.6.0] [labor-hour = 70 hr] Project Execution Plan (PEP) [1.1.1] [labor-hour = 80 hr] Project Monitor & Control [1.1.2] [labor-hour = 80 hr] PEP Review [1.1.3] [labor-hour = 16hr] System Requirement Analysis (SRA) [1.2.1] [labor-hour = 110 hr] SRA Review [1.2.2] [labor-hour = 4 hr] System Design Specification (SDS) [1.2.3] [labor-hour = 100 hr] SDS Review [1.2.4] [labor-hour = 3 hr] System Test Document (STD) [1.2.5] [labor-hour = 100 hr] STD Review [1.2.6] [labor-hour = 3 hr] VMC-REM Design & Testing [1.3.1] [labor-hour = 250 hr] VMC-PSS Design & Testing [1.3.2] [labor-hour = 250 hr] VMC-AM Design & Testing [1.3.3] [labor-hour = 250 hr] VMC-SYN Design & Testing [1.3.4] [labor-hour = 300 hr] VMC-TMS Design & Testing [1.3.5] [labor-hour = 200 hr] Software & Hardware Integration Testing [1.4.1] [labor-hour = 100 hr] Purchase Multi-Core Platform [1.5.1] [labor-hour = 20 hr] Configuration Management (CM) [1.6.1] [labor-hour = 30 hr] Technical Specification Writing [1.6.2] [labor-hour = 40 hr]
Project Life Cycle Architecture Design Requirement Development Project Planning System Subsystem System Development System Integration and Testing Design System Implementation
Project Life Cycle Definition According to the technique and specification, this project is developed by Waterfall Model The project could be divided into four phases: P1: Requirement and Specification Development Phase (2008/07/25~2008/10/31) P2: System Development Phase (2008/11/01 ~ 2009/04/30) P3: System Integration Phase (2009/05/01 ~ 2009/05/31) P4: The Phase of Concluding the Project (2009/06/01 ~ 2009/06/30)