Detailed Design Review Multidisciplinary Senior Design 1 Friday, February 15 th, 2013 P13051.

Slides:



Advertisements
Similar presentations
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Advertisements

Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Chapter 3 Hydraulic Cylinders
Fluid Power Systems Mill Creek High School Power and Energy.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
Experiment 8 : Minor Losses
PIV Lung Model Test Setup December 14 th, Components Model Pump Pressure measurement Pressure control.
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
Hydraulics.
Basics of Pump Vigyan Ashram, Pabal.
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND DETAILED DESIGN REVIEW 1.
P10054 Enhancements to Cigarette Smoking Machine Senior Design Fall/Winter 2009 Team Lead Frank Forkl (ME) Slide 1 of 8 P10054.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Senior Design II Film Thickness Measurement Julian Peters Joe Fitzmyer Brad Demers Coordinator: Dr. Wayne Walter Advisor: Dr. Dale Ewbank Sponsor: Dr.
Film Thickness Measurement Julian Peters Joe Fitzmyer Brad Demers P06402.
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
Optical Stage Redesign Team 4025 Senior Design II – Spring
GE Energy Silicon Wafer Measurement System Team 10 Olin Biddy Scott Johnson Chetwyn Jones Rob McCoy Tim Weber.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Closed Conduit Measurement Techniques ä Pipeline systems ä pipe networks ä measurements.
Fluid Power Introduction
Flow Sensors.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
TP4-ENERSOL-TD/PV double function
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
Blown Film Unit 300 It is suitable for production of small films used by the food industry and in the packaging field where the application of big production.
Muhajir Ab. Rahim School of Mechatronic Engineering
SubsystemCost Tanks and Containment$ Camera Positioning$ Pumping System $2, Common Header$ Pressure Control and Measurement$11,
Viking Pump Flow Manager - Phase 2 Senior Design May
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Flow Characteristics Viscosity determined through index matching, (550 SSU, 109 cP, Pa-s) – Much higher than water (1 cP) Flow tested by Army is.
Systems Level Design Review Multidisciplinary Senior Design 1 Friday, December 21 st, 2012 P13051.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
THE ROCHESTER INSTITUTE OF TECHNOLOGY MICROGRAVITY DROP TOWER P14651 Project Description Background: Microgravity is a condition in which objects experience.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
General Energy Equation. Chapter Objectives Identify the conditions under which energy losses occur in fluid flow systems. Identify the means by which.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject : Fluid Power Engineering Name of Unit : Pumps Topic : Reciprocating.
PF3W Series 3-Color Display Digital Flow Switch Planned release date: May 2012.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Introduction to Energy Management
Nanofluidic Characterization David Sharp David West Justin Davis.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Speed Sensor Calibration
GOVERNMENT ENGINEERING COLLEGE, BHARUCH (014) Chemical Engineering department SEM-iii Sub: fluid flow operation topic: orifice meter & rotAmeter Guid by:
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Bicycle Instrumentation Hardware Steven Brendel Joe Rinek Eric Chan.
Zach Bolotin Cody Hatch Robert Swartz Moog Flight Simulator Visual Display.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Week 1 Unit Conversions Conservation of Mass Ideal Gas
Project Background The Army Medical Research Lab needs to validate their CFD models for healthy and diseased lungs RIT will perform particle image velocimetry.
Turbomachinery Flow Visualization P08453
Investigation of Flow in a Model of Human Respiratory Tract
Industrial Skills Fasteners & Hardware.
Speed Sensor Calibration
Threads and Threading.
P16081: Systemic Circulation Detailed Design Review
S. Ghosh, M. Muste, M. Marquardt, F. Stern
HEMODYNAMIC SIMULATOR II P09026
Prepared by Dr. Mohamed Ahmed Awad
P15661 Reciprocating Friction Tester Base Subsystem
Active Reciprocating Compressor Valve Assembly P16452
SCITEQ End closure series
Optical Stage Redesign
Presentation transcript:

Detailed Design Review Multidisciplinary Senior Design 1 Friday, February 15 th, 2013 P13051

P13051 – PIV Experiment for Flow Mapping in Lungs Customers: ▫Dr. Risa Robinson ▫Dr. Steven Day Team Guide: ▫Michael Antoniades – Chemical Engineering Team: ▫Kristin Roberts – Project Manager, ME ▫Morgan DeLuca – ME ▫Brad Demarest – EE ▫Ryan Mark – ME ▫Jimmy Moore – CE ▫Jake Snider – ISE

Agenda Project Background Customer Needs & Engineering Specifications Component Design & Feasibility ▫Pressure Measurement & Control System ▫Pump System ▫Lung Tank & Reservoir ▫Camera/Laser Positioning System Preliminary Test Plans Risk Assessment

Project Background The Army Medical Research Lab needs to validate their CFD models for healthy and diseased lungs RIT will perform particle image velocimetry (PIV) on lung models to validate the CFD. The senior design team will design and develop the lung models and testing apparatus.

What is PIV? Used for flow visualization and velocity measurements Fluid is seeded with tiny tracer particles The particles are illuminated using a laser sheet, and a camera takes pictures of the particles. Fluid velocity profiles can be obtained by analyzing particle movement from frame to frame.

Key Customer Needs 1.Accommodate various image locations 2.Simulate inhalation and exhalation 3.Monitor flow rate and pressure 4.Control flow at outlets to mimic boundary conditions of CFD model 5.Accommodate imaging with no distortion 6.Create LabVIEW Program and procedure to run experiment 7.Can easily switch between models

Pressure Control Subsystem Comprised of: T-hose splitter Dual flow needle valve Amplified voltage pressure transducer Powered breadboard

Needle Valve High resolution, therefore minor adjustments to flow can be made (5 turns) Dual flow capability (allows inhale and exhale simulation) Low profile for organization purposes Low cost (20$)

T-Hose Splitter Reasons for using a T-hose splitter: Separate static pressure from dynamic flow Allow pressure readings to be taken parallel to flow increasing accuracy Organize flow path from model to valve system

Amplified Pressure Sensor Accuracy (can measure static pressures +/- 1% with proper calibration) Cost (65$ per sensor) Compact design (no extensive cables or adaptation, plug into breadboard) Easy to calibrate and characterize to increase accuracy

Breadboard Implementation Keeps voltage sensors organized and setup compact Allows user to adjust voltage getting applied to sensors easily Flow from pressure control to DAQ device will be smooth

Pressure Control Path Fluid will leave outlet With steady state conditions fluid will separate due to splitter and apply static pressure on sensor Flow will be adjusted with needle valve based on logger pro readout compared to desired conditions Back to pump

Calibration Technique Fluke 718 series Can use to apply very accurate known pressure Output voltage can then be read and adjusted to create new curves accurately matching sensor performance Device is on loan from ME Department

Flow Characteristics Viscosity determined through index matching, (550 SSU, 109 cP, Pa-s) ▫Much higher than water (1 cP) Flow tested by Army is from 2-10 L/min ▫Using Reynolds number matching, 6-32 GPM Pressure loss through system ranges from 20 psi to 50 psi ▫Calculated using Poiseuille flow

Positive Displacement vs. Centrifugal Conclusion: PD pumps provided better flow control, regardless of pressure and handle high viscosities. Graph Credit: pumpschool.com

PD Pump Selection PumpFlow RatesPressuresCommentsCost (3 highest) Gear pump Acceptable, Up to 30 gpm Acceptable, Up to 50 psi Common, can be self- priming 2 Rotary VaneAcceptable Not really used in our application, better for thin fluids and high pressure differentials 1 DiaphragmAcceptable Create pulsing flow, need air supply, cheaper 1 Lobe PumpAcceptable Used in Sanitary applications where fragile solids are used, bi-rotational, may be overly complex 3 Image Credit: Wikipedia; Info Credit: pumpscout.com

3 GPM35 GPM 6 GPM33 GPM19 GPM Siewert, GPM, $2,079 Siewert, GPM, $2,319 Siewert, GPM, $2,189 Emerick, GPM, $2,754

Max flow rate: 33 GPM Min flow rate: 3.3 GPM Max Pressure: 200 psi Speed Ratio: N/A Price: $2,745 Shipping not included Lead time: 3-4 weeks Max flow rate: 32 GPM Min flow rate: 3.2 GPM Max Pressure: 100 psi Speed Ratio: 10:1 Price: $2,319 Shipping included Installation Assistance Lead time: 5-6 weeks Emerick Siewert

Inhalation Pipe Schematic

Lung Tank Design The project team has decided to go with acrylic siding for the tank, as it is easy to machine and is readily available in the needed sizes. The tank will be 24” x 16’’ x 16’’, which will hold slightly less than 27 gallons worth of liquid.

Lung Tank Design The case will be made watertight using silicone gel, and then made more structurally sound using L-brackets along the side. 8 holes will be drilled along the bottom of the side panels for the multi- tube connectors A single hole on the top of the case will allow liquid to be pumped in to the model.

Tank Wall Deformation Analysis ANSYS Workbench was used to analyze wall deflection due to hydrostatic pressure (P=ρgh). Original choice of 1/8” thick acrylic resulted in 1.868” outward deflection. Needed to find appropriate wall thickness that would not affect PIV results 1/8” 5/16”

Tank Wall Deformation Analysis Treated tank wall as a simply supported beam Able to calculate deflection and slope of deflection Calculate angle between laser and perpendicular

Tank Wall Deformation Analysis Used Snell’s Law to calculate the angle of the laser after it enters the tank (θ 2 ). We can then calculate the error associated with refraction using the distance the lung is from the wall. θ2θ2 Error Distance to model

Tank Wall Deformation Analysis Panel Thickness (in) I (in 4 ) Max P (psi) (q) Max Deflection (approx) Max Slope (Magnitude) θ 1 (deg)θ 2 (deg) Distance to Model (in) Error due to refraction (in) Error due to refraction (mm)

Tank Wall Deformation Analysis For a 16”x24” acrylic panel, 7/16” thick

Reservoir Design Similar design to Lung Tank 1/8” thick acrylic will be fine since tank is not used for PIV – only 0.17” deflection. 12”x12”x12” box Holes cut for connection to pump system

Omega Multi-tube Connectors Can handle 10 tubes per connector. Will allow easy connection/disconnect when we switch out models. Allows for thru-wall connection to simplify the tank and tube interface.

Lung Holder Used to hold lung in tank Put rubber between holder and lung model to ensure a tight and secure fit Can rapid prototype in clear Watershed XC for ~$300

Lung Holder Drawing

Labview – Data Acquisition NI-USB-6225, Screw Terminated ▫80 Analog Input Ports ▫Compatible with Labview ▫$1749 This will output to the Labview program which will collect the pressure data and display it to the user.

Labview Code Not fully completed ▫Need all components before testing and construction can occur.

Positioning System Need: Ability to take PIV pictures of all branches and bifurcations XYZ Stages alone are not the answer ▫Used for low travel, high resolution ▫Very expensive for more than one Optics rods and clamps also too expensive & precise Make it ourselves – 80/20

Design Essentially a square arch that translates L-Handle brakes to keep it in position Strong frame – no vibration Drop-in T-studs allow for camera movement When combined with a rotation allows for all angles

Result Contacted Bob Proscher at Ralph W. Earl Co. Developed a kit including all requested machining ▫Quote: $ Mount an optical stage (5 – 10 mm) ▫$600 - $1,000

Refractive index (RI) of fluid must match that of the model. ▫Model will be made using RedEye Veroclear  n = 1.47 Fluid used will be made from glycerin. ▫85% Glycerin, 15% Water  n = 1.45  While RI may not be matched exactly, the difference is negligible. Index Matching Fluid

Complete Test Setup Positioning System Lung Tank Pump System Reservoir

SubsystemCost Tanks and Containment$ Camera Positioning$ Pumping System $2, Common Header$ Pressure Control and Measurement$11, Total:$15, Budgetary Overview

PartPrice/UnitQuantityCost Acrylic Sheet, 48"x24", 7/16" thick $ $ Multitube Quick Coupling Set $ $ Perforated framing, zinc-plated steel, 4ft each, pkg qty 12 $8.781 Plain Steel Square Head Low Strength Bolt 5/16"-18 Thread, 1" Length, pkg. 25 $5.592 $ SS Type A USS Flat Washer 5/16" Screw Size, 7/8" OD,.06"-.11" Thick, pkg. 25 $5.602 $11.20 Plain Grade 8 Steel Hex Nut 5/16"-18 Thread Size, 1/2" Width, 17/64" Height, pkg. 100 $4.281 Steel Perforated Flat and Angle Framing Hardware: Zinc- Plated Steel Bolts W/Nuts & Washers $7.421 Zinc-Plated Steel Machine Screw Hex Nut 2-56 Thread Size, 3/16" Width, 1/16" Height, pkg. 100 $ SS Pan Head Phillips Machine Screw 2-56 Thread, 1/2" Length, pkg. 50 $6.181 Acrylic Sheet, 12"x12", 1/8" thick $8.636 $51.78 All-Seal Sealant for Wet and Oily Surfaces, Clear, 10.2 oz $ Standard Pipe Thread Sealant 1-1/4-Ounce Stick $3.463 $10.38 Lung holder – rapid prototype in Watershed XC 11122$3001 Total: $ Tanks and Containment

PartPrice/UnitQuantit y Cost 1515 Profile $ $69.95 Drop-in T-studs $2.145 $10.70 Single Flange Linear Bearing $ $77.20 Hidden Corner Connectors $7.252 $14.50 L-handle Brake $9.552 $19.10 Total: $ Camera Positioning

Pump System PartPrice/UnitQuantityCost H75M Gear Pump $2, Variable Frequency Drive Motor Tubing, 1'' ID $2.455$12.25 Tubing, 1/4'' ID, 3/8'' OD $0.7125$17.75 Tubing, 1.5'' ID $4.2210$42.20 Tube clamps, 1.5'' 10$7.22 Tube clamps, 1'' 10$7.07 Tube clamps, 3/8'' 20$5.67 Tube to pipe, adapter, 1'', 1'' $8.321 Pipe to tube, adapter, 1.5, 1.5 5$8.73 Tube to pipe, adapter, 1/4'', 1/2'' 10$4.97 Pipe to tube, adapter, 1/2, 1'' 10$8.48 Valve, ball, 1.5'' $ Valve, ball, 1/2'' $9.841 Valve, ball, 1'' $ Pipe, 1-1/2'', 4'', Male-Male $3.182$6.36 Reducer, 1'', 1 /2'' $ Coupling, 1 1/2'' $6.372$12.74 Bulkhead, 1'' $6.052$12.10 Cap, rigid plastic, tubing, 1/2'' $ $5.50 Stopper, rubber, 1-1/2'' $0.8712$10.38 Total: $2,597.91

Common Header PartPrice/UnitQuantit y Cost Manifold, 10 outlets, 1 inlet23.18$ Fitting, wye, t-t-t, 1/4,1/4,1/44.911$4.91 Plug, tube, 1/40.971$0.97 Tubing, polyurethane, 1/4'', 1/8'', 100'24.71$24.70 Total:$266.62

Pressure Control and Measurement PartPrice/UnitQuantit y Cost Minature Voltage Sensor $ $5, Needle Valve $ $1, Urethane Hose 50 ft $ $ Hose Connectors $ $1, Polycarbonate sheet $ $ Data Acquisition Device $3, Powered Breadboard $ $ T splitter $ $ Total: $11,703.00

Risk Assessment