Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.

Slides:



Advertisements
Similar presentations
UNIT -6 Rapid Tooling.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Manchester 09/sept/2008 A.Falou & P.Cornebise {LAL-Orsay} 1 SLAB Integration & Thermal Measurements Slides Overview Thermal Measurements (Demonstrator)
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
ECAL silicon- tungsten status
CALICE Collaboration Meeting March 2014 Roman Pöschl LAL Orsay On behalf of: D. Grondin, J. Giraud J. Bonis, P. Cornebise, A. Thiebault, C. Bourgeois,
FEV Boards status N. Seguin-Moreau on behalf of
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
The HCAL barrel absorber structure
Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Status of GASPARD mechanics
ECAL EUDET MODULE Summary talk
Mechanical aspects of SiW Ecal PCBs
CALICE: Thermal, Mechanical and Assembly issues
New Design for Beam Test Structure
CALICE Collaboration Meeting KEK/Japan – April 2015
prototype PCB for on detector chip integration
Module/Ladder Assembly
Ecal Front End Electronics
Stéphane Callier, Dominique Cuisy, Julien Fleury
NPS mechanical design 11/13/2018 Jlab meeting
NPS mechanical design 01/31/2019 Jlab meeting
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1

Frotin – CALICE meeting – 17/09/2009  Clearance (slab integration) : 500 µm  Heat shield : 500 µm   PCB : 1200 µm  but 1100 µm used  Thickness of glue : 100 µm  Thickness of wafer : 325 µm  Kapton ® film HV : 100 µm ?  tests  Thickness of W : 2100/4200 µm (± 80 µm) EUDET design 550 mm 1495 mm Composite Part with metallic inserts (15 mm thick) 182,1 × mm Thickness : 1 mm FEV5 Heat shield: µm (copper) PCB: 1200 µm glue: 100 µm wafer: 325 µm Kapton ® film: 100 µm 7,3 9,4 Thermal demonstrator Chips and bonded wires inside the PCB 2850 FEV7 CIP at the present time PCB WAFER CHIP 2

Frotin – CALICE meeting – 17/09/2009 Demonstrator design It’s consisted of 3 alveolar layers + 2 Tungsten layers 3 columns of cells : representative cells in the middle of the structure Used for Thermal studies support Width of cells : 126 mm Identical global length : 1.3m and shape (trapezoidal) Fastening system ECAL/HCAL weight : ~ 60 Kg Built a first demonstrator to understand all manufacturing processes Width is based on physics prototype (124 mm) Good precision (width, dead zone, cells thickness) ( global tolerance +/- 0.01mm ). Used for thermal PCB studies and cooling system analysis Used for the First test of slab integration (gluing, interconnection …) Demonstrator structure

Frotin – CALICE meeting – 17/09/2009 EUDET design 4 the assembly consisted of 15 alveolar layers + 14 Tungsten layers 3 columns of cells : representative cells in the middle of the structure Width of cells : mm 2 Thickness cells (7.3 mm and 9.4 mm) Identical global length : 1.495m Fastening system ECAL/HCAL Total weight : ~ 800 Kg New built layer for the EUDET Module Cells width is based on mm Used for BEAMTESTS. First EUDET layer alveolar structure

Frotin – CALICE meeting – 17/09/2009 EUDET TOOLS : Study and design 5 EUDET handle core Safety Transport Facilitate the wrapping core Winch extraction core Control the traction force (max 6000 N) and the speed extraction (0,5 m/min)

Frotin – CALICE meeting – 17/09/2009 EUDET– Assembly Mould Now, here is the EUDET assembly mould :  Global design : OK  W and Carbon Needs : OK  Detailed design description : ON going  Technical drawing : January 10  Ordered : January 10 6 ALUMINUM CORES (45 cores, 15 references) STOP PARTS (30 Parts 15 references) Mould EUDET module in the autoclave

Frotin – CALICE meeting – 17/09/2009 EUDET H or U SLAB Study of one mould for whole slab structures: All slabs are made by several short but precise plates, assembled in 2 layers, in order to control the thickness and the flatness  Design and Machining: OK  first H structure (1300×124): OK  EUDET short and long H SLAB: Fev 10  EUDET short and long U SLAB: Fev Silicium layers H - Chip on board If PCB <= 1.2 mm U - 15 Silicium layer - Chip on packaged If > 1.2 mm Building an other MOULD - 2 months - 3 k€ precise plates W plates 7

Frotin – CALICE meeting – 17/09/2009 Conclusion : 8 The next step : Build 14 mono-EUDET layer. Cutting layer operation. Studies the thermal inerties parameters 1.7 T Insertions slab tests Characterize material Test Continue the mechanical tests (with bragg grating) until destroy ?

Frotin – CALICE meeting – 17/09/2009 Conclusion : schedule For Eudet module :  We will plan:  “Assembly mould” design in January ( 2010)  14 alveolar layers in first half-year (2010)  Eudet structure assembled in the first half-year (2010)  “14” H or U Short structure in second half-year (2010)  “1” H or U long structure in second half-year (2010) 9