Index: Status report ENEA tasks (Dec 2005) EFDA Task TW4 TSS SEA5.1............................slides 2,3,4 EFDA Task TW5 TSS SEA5.1............................slides.

Slides:



Advertisements
Similar presentations
Associazione EURATOM ENEA sulla FUSIONE CONSEN A COMPUTER PROGRAM FOR TRANSIENT SIMULATION OF ENERGY AND MASS TRANSFER BETWEEN INTERCONNECTED VOLUMES DEVELOPED.
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Lesson 17 HEAT GENERATION
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Radiopharmaceutical Production Target Foil Characteristics STOP.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
M. GIRARD – CEA / EFDA MEETING - CADARACHE, January th, 2005 Task TW4 – TSS - SEA 5.5 Validation of EU Safety Computer codes Validation of PACTITER.
Kick off meeting EFDA Task TW6-TSS-SEA2.1 Garching 10th/10/2006 ENEA Engineering approach of the potential accident scenario leading to the worst release.
ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS.
Physics of fusion power
Safety assessment for Safety assessment for potential target materials: radioactivity vs. chemical toxicity presented by: Susana Reyes ARIES Group Meeting.
Physics of fusion power Lecture 8 : The tokamak continued.
1 Lecture #24 Fusion ENGR 303I. 2 Outline Fusion →Definition →Atoms usually used Previous attempts at fusion Current attempts at fusion →International.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
EURATOM RESEARCH AND TRAINING ON NUCLEAR ENERGY 1.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the contracts TW5- TSW-001 and -002 Garching. January 17 th, 2006 Final Meeting of the contracts.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
RIC 2009 Thermal Hydraulics & Severe Accident Code Development & Application Ghani Zigh USNRC 3/12/2009.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
1 DTN / PACTITER - Kick off meeting of the contracts TW5-TSS-SEA5.6, Cadarache 26/10/05 Necessary work for PACTITER Development and validation F. Dacquait*,
UNIT 8 Vocabulary –Renewable vs non-renewable –Alternative energy sources Grammar and functions –Conditional clauses –Grammar through translation –Oral.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
Physics of fusion power Lecture 10: tokamak – continued.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
ITER and Fusion Safety Aspects H.-W. Bartels, ITER Prague, 13.November 2006.
Stainless steel release rate evaluation in ITER operating conditions P. Schindler- V. Blet CEA/DEN/DTN/STRI/LTCD Cadarache France.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
A Closer Look at Energy Demands: Quantification and Characterisation.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Fusion Neutronics Activity at JAERI from October 2000 to September 2001 Peseted by Takeo NISHTANI IEA International Work Shop on Fusion Neutronics The.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
1 G. Cambi, D.G. Cepraga, M. Frisoni Enea & Bologna University Team OSIRIS neutronic and activation simulation with Scalenea-ANITA in support of PACTITER/CORELE.
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
November 19th 2010, Bologna LEADER 1 1st LEADER PCC MEETING WP4 PLANT OPERATION, INSTRUMENTATION, CONTROL AND PROTECTION SYSTEM DESIGN.
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
1 Assessment of previous ORE evaluation by comparison with 3D exposure analysis. Analysis of the main difference contributors and optimisation of the calculation.
The tritium breeding blanket in Tokamak fusion reactors T. Onjun1), S. Sangaroon2), J. Prasongkit3), A. Wisitsorasak4), R. Picha5), J. Promping5) 1) Thammasat.
Heating and radiological
 Progress with the revision and consolidation of the European Basic Safety Standards Directive Stefan Mundigl, Vesa Tanner European Commission DG Energy.
Xiaomin Pang, Yanyan Chen, Xiaotao Wang, Wei Dai, Ercang Luo
Preparation of activation experiments for ITER material characterization and data validation in the Deuterium–Tritium JET campaign T. Vasilopoulou &
VLT Meeting, Washington DC, August 25, 2005
Preliminary Analysis of Loss of Vacuum Events in ARIES-RS
Presentation transcript:

Index: Status report ENEA tasks (Dec 2005) EFDA Task TW4 TSS SEA slides 2,3,4 EFDA Task TW5 TSS SEA slides 5,6,7,8 EFDA Task TW4 TSS SEA5.5 (CONSEN) slides 9,10 EFDA Task TW5 TSS SEA5.5 (CONSEN) slides 11,12 EFDA Task TW4 TSS SEA2.1A slides 13,14,15 EFDA Task TW4 TSS SEA slides 16,17,18 EFDA Task TW4 TSS SEA slides 19,20,21 EFDA Task TW5 TSS SEA5.5 (ANITA) slides 22,23 EFDA Task TW4-TSW-001 D2-D slides 24,25

EFDA Task TW4 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device It is dedicated to test the active extraction of dusts from the volume used as vacuum vessel. The scope is to demonstrate the possibility to clean the ITER vacuum vessel from the accumulated dusts, generated during the plasma disruption, blowing air inside the volume. The data will be collected also for the validation of the codes simulating the dust transportation in LOVA accidents. Scope of the task

Test matrix and experimental procedure Dust placed in the bottom of the vacuum vessel tank Air inlet at the divertor level Filter weighted before and after the test 1 g of W or C or SS dust in each experiment Air inflow for 10, 30 or 60 minutes VV temperatures: ambient (~ 20 °C) and 50 °C Simulations performed (next slide), experiments on going. EFDA Task TW4 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

The results obtained by means of the ECART simulations suggested that, using an air flow of the order of 0.04 kg/s, as designed in the STARDUST facility, the cleaning interval has to exceed 2000 s. W suspended mass (ECART simulations) In the cold test the dust is pulled out more rapidly, for the reduced turbolence. In about 2000 s the transient is stable. EFDA Task TW4 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

Feasibility study for a closer geometry to ITER (i.e. toroidal), together with the development of a suitable diagnostic on line for dust concentration measurement Scope milestone 1 Scope milestone 2 Further experiments in STARDUST to reduce the uncertainties in dust transport inside and outside the VV: mobilization factor and dust exiting the VV under typical ITER accident conditions (i.e. pressurization rates 10 – 30 Pa/s).Further experiments in STARDUST to reduce the uncertainties in dust transport inside and outside the VV: mobilization factor and dust exiting the VV under typical ITER accident conditions (i.e. pressurization rates 10 – 30 Pa/s). The geometry of the experiment takes into account some characteristics of the ITER VV, like the presence of obstacles (e.g. Divertor) and layer of dusts.The geometry of the experiment takes into account some characteristics of the ITER VV, like the presence of obstacles (e.g. Divertor) and layer of dusts. Experiments with tungsten, stainless steel, carbon and alluminium to simulate beryllium behaviour Experiments with tungsten, stainless steel, carbon and alluminium to simulate beryllium behaviour EFDA Task TW5 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

Feasibility study (on going) 1.The toroidal shape can give precise indication about the reduction of the velocity field (circular section) 2. Scale rule -> 1/10 of ITER major radius : (0.62 m) and minor radius (0.2 m) 3. 4 through windows to allow the visualization and possible measurement of the dust mobilization inside EFDA Task TW5 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

Investigation on Diagnostics (on going) 1. CDD camera for dust visualization, and analysis of the images (up to 8000 images/s) enable the qualitative assessment of the dust concentration. the images (up to 8000 images/s) enable the qualitative assessment of the dust concentration. 2. The light scattering method will be used if the dust concentration is not such to stop the light beam. EFDA Task TW5 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

For 2006 experiments in STARDUST Velocity measurement is a key factor Pressure trasducer will be adopted because hot wires have a reduced range for maximum velocity (maximum 80 m/s) and signal delayed (~500 ms)Pressure trasducer will be adopted because hot wires have a reduced range for maximum velocity (maximum 80 m/s) and signal delayed (~500 ms) The dimension of pressure trasducers does not The dimension of pressure trasducers does not disturb the velocity field Several points of Several points of measurement will be foreseen EFDA Task TW5 TSS SEA5.1 Dust mobilization and transport experiments in the STARDUST device

Scope of the task ValidationCONSEN cryogenic experimentsEVITAValidation of the simulation code CONSEN against the cryogenic experiments carried on in the EVITA facility during pre and post-test calculations11 pre and post-test calculations for steam and water entering the VV with the presence of incondensable gas (helium) water/steamcondensationcryogenic plate inpresence of gasThe objectives of the tests were to determine the water/steam condensation phenomena on a cryogenic plate in presence of gas, to evaluate ice formation kinetics, heat transfer, total condensed water mass, cryogenic surface temperature and dynamic pressure and temperature of the container. EFDA Task TW4 TSS SEA5.5 (CONSEN) Validation of the computer codes and models

Results constant valuesnitrogen heat transfer coefficient The constant values of the nitrogen heat transfer coefficient in the cooling tubes used in the simulations can be the cause of the differences. EFDA Task TW4TSS SEA5.5 (CONSEN) Validation of the computer codes and models ice formation correctly simulated exception 6.51 The ice formation is correctly simulated in all the tests with the exception of the test 6.51, in which more than one calculated output is far from the experimental one. Power extracted satisfactory agreement hot tests discrepancy cold tests. Power extracted from the nitrogen cooling loop is in satisfactory agreement, in general, in the hot tests while a larger discrepancy appears in the cold tests.

Scope of the task ValidationCONSEN cryogenic experimentsEVITAValidation of the simulation code CONSEN against the cryogenic experiments carried on in the EVITA facility during post-test calculations7 post-test calculations for steam and water entering the VV with and without the presence of incondensable gas ice formationThe process of ice formation is the key point of the experimental campaign. Accordingly with the previous experiment the ice formation stops after a couple of minutes while in the CONSEN simulations the ice growth continues until the end of the transients. testssame initial conditionsstopped different timeA series of tests with the same initial conditions stopped at different time have been performed to clarify this point. EFDA Task TW5 TSS SEA5.5 (CONSEN) Validation of the computer codes and models

Results CONSEN correctly ice masslong term short termdifferences 20% The results obtained showed that the CONSEN code simulated correctly the growing of the ice mass on the cryogenic plate on the long term (second EVITA point in the graphs), while in the short term differences of about 20% have been noted. EFDA Task TW5 TSS SEA5.5 (CONSEN) Validation of the computer codes and models

Scope of the task Review and documentation of the past analysis assumptions/parameters and results for 1.Ion Cyclotron Heating and Current Drive System, 2.Electron Cyclotron Heating and Current Drive System, 3.Neutral Beam Heating and Current Drive System, 4.Diagnostics, and 5.Test Blankets Reanalysis of the above systems, on the basis of the current design and operating information. Identification and analysis of potential improvements, for each of the above systems. The results of this sensitivity analysis will be documented to facilitate any future considerations for dose reduction strategies EFDA Task TW5 TSS SEA2.1A Update of ALARA analyses for ITER Occupational Radiation Exposure

Past ORE assessments The contribution of the different sytems are referred to ITER plant limit, that is 500 mSv/y EFDA Task TW5 TSS SEA2.1A Update of ALARA analyses for ITER Occupational Radiation Exposure

Worker dose estimates for NB & LH heating & current drive systems A preliminary ORE assessment of the ITER Neutral Beam and Lower Hybrid heating and current drive system has been performed, as it did not previously exist for these systems. Main assumptions for ORE: -NBI maintained by RH -VTL section in LH maintained in hot cell SystemWork effort (p-h) Dose rate  Sv/h ORE mSv/y NBI&CD LH&CD EFDA Task TW5 TSS SEA2.1A Update of ALARA analyses for ITER Occupational Radiation Exposure

Issues of the task ORE related to remote handling Develop a software tool to assist the safety analysts in evaluating maintenance procedures and ORE values. Assess hands-on activities to be performed in the Equatorial Port number one (Eq#01) in assistance to the RH for maintenance of port plug, i.e.: the clearance of port cell from equipments located in front of the port, the unsealing of port plug and, vice-versa, the sealing of the port plug and the reinstallation of equipments located in port cell. ORE related to waste management Assess maintenance activities on the Waste Treatment System where wastes originated in the ITER plant from the experimental and maintenance activities are collected and treated (such wastes do not include those highly activated and managed inside the Hot Cell Processing System). EFDA Task TW4 TSS SEA2 In-depth assessment of ORE during RH and waste management

A view of the ORE_In_Rooms_Code EFDA Task TW4 TSS SEA2 In-depth assessment of ORE during RH and waste management

Main Results on ORE assessments ORE related to remote handling The total hands-on activities to be performed in assistance to the RH of port plug in Eq#01 require a total work effort of 472 p-h (118 p-h/y) and a collective worker dose of about 30 p-mSv (7.4 p-mSv/y). The highest contribution in terms of collective dose comes from the operations on the port plug flange (main flange unsealing/sealing, cooling pipes cutting/welding), with about 7 p-mSv (~1.8 p-mSv/y). ORE related to waste management The estimated collective annual dose relative to the Waste Treatment System is about 5 p-mSv/y. EFDA Task TW4 TSS SEA2 In-depth assessment of ORE during RH and waste management

Scope of the task It is dedicated to provide activation data in support of ITER safety and design to cover, in due time, the needs arising from design modification and/or optimisation. The analyses have been dedicated: to highlight the impact of the cobalt content into the Vacuum Vessel steels for waste management policy and to characterise the activation of the steel test tubes irradiated in OSIRIS reactor for ITER material release rate tests in CORELE-2 loop and PACTITER code validation EFDA Task TW4 TSS SEA4.1 Activation calculation for ITER

Material clearance index vs. Co content Material contact dose vs. Co content EFDA Task TW4 TSS SEA4.1 Activation calculation for ITER

A neutronic model was set up and used in SCALENEA-1 to simulate the CORELE steel test tubes irradiation in OSIRIS reactor. Once estimated the neutron flux spectra, activation calculation were performed using the ANITA-2000 activation code. The comparison shows a good agreement between measured and calculated isotope activities : therefore the approach is suitable to evaluate the activation data needed by PACTITER code for ACP estimate EFDA Task TW4 TSS SEA4.1 Activation calculation for ITER

Scope of the task Validation of the activation code package ANITA-2000 against experimental vanadium alloys, nickel, copper, lithium orthosilicate, Eurofer-97 steel and tungsten activity data from the Karlsruhe Isocyclotron (KIZ). Validation of the activation code package ANITA-2000 against experimental photon and electron decay heat measurements from Fusion Neutron Generator FNG ENEA-Frascati for Molybdenum and Tantalum. EFDA Task TW5 TSS SEA5.5 (ANITA-2000) Validation of the computer codes and models

Isotope Experimental data (KIZ) ANITA-2000 EAF-2003 Cr E E+08 Mn E E+07 Fe E E+04 Co E E+04 Co E E+05 Co E E+03 W E E+06 For all the KIZ materials analysed the ANITA-2000 results are in good agreement with the experimental ones (inside the experimental uncertainties) Activity (Bq/kg) for Eurofer-97 (41 days cooling time) Cooling time (s) Experimental data ANITA-2000 EAF E E E E E E E E E-14 Tantalum gamma decay heat (kW) The calculated photon and electron decay heat are in good agreement with experimental data (up to 10% for Ta and 15% for Mo). The ANITA-2000 and EASY-2003 calculations differ by less than 1%. EFDA Task TW5 TSS SEA5.5 (ANITA-2000) Validation of the computer codes and models

Recycling is becoming more and more important in a world which is going to deal with energy and natural resources shortage. Present studies on recycling of slightly radioactive material show positive outcomes while at the same time problems of public acceptability still exist. Safety criteria have been defined, regulations and standards are going to be set in place in many countries, even though the need for harmonising clearance levels is still an issue. Table from EC RP 134: Evaluation of the application of the concepts of exemption and clearance for practices according to title III of Council Directive 96/29/Euratom of 13 May 1996 in EU Member States – Case of tritium (harmonisation of CLs): clearance level from 0.4 Bq/g in UK up to 1.0E+6 Bq/g in the Netherlands EFDA Task TW4-TSW-001 D2-D3 Watching brief and waste management

The experience of decommissioning of an entire generation of nuclear facilities will be exploited by future fusion industry, (i.e. for recycling, reuse or disposal). The real waste management problem will be relative to the in-vessel components (IVCs) similarly as the management of spent fuel is the “problem” in fission. The fusion industry would have the advantage of being able to use activated metal, as it would be employed in a controlled environment, where radiation fields will be monitored. It seems more important to demonstrate the feasibility of IVCs recycling from the technical point of view, rather than try to perform an economic assessment with the present-day terms in mind. It would be greatly more important to concentrate the future activities on: 1.the study of the fusion material and equipment cycle and; 2.on the regulatory framework, within which recycling of fusion material could be performed. Time distribution for generation of slightly radioactive solid material from USA power reactor decommissioning EFDA Task TW4-TSW-001 D2-D3 Watching brief and waste management