Project Management Chapter 2

Slides:



Advertisements
Similar presentations
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Advertisements

CHAPTER 17 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Project Management Chapter 3 - Heizer.
pert and cpm ch 9 Learning objectives:
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Project Scheduling: Networks, Duration estimation, and Critical Path.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Management Project management is a systemized approach to: ◦ defining, ◦ organizing ◦ planning ◦ monitoring ◦ controlling projects.
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
6. Project Management.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Operations and Supply Chain Management, 8th Edition
Project Management Techniques.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management Chapter 2.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Project Management © Wiley 2007.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Management 1.
© 2007 Pearson Education Project Management Chapter 3.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Planning.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Network Planning Methods Example CPM : Saint Paul’s Hospital Network Planning Methods.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. KR: Chapter.
Project Scheduling A. A. Elimam FinishStart. Project Scheduling Need to plan and control large/time consuming projects.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Fifth Edition © 1999 Addison Wesley Longman. All rights reserved. 時間管理補.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 4.
Managing Project Processes Managing Project Processes.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Activity.
Network Planning Methods Example PERT & CPM
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
© 2005 Prentice Hall, Inc. Managing Projects Dr. Mohammad Hamsal.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Planning.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Hospital Establishment
Chapter 3 Managing the Information Systems Project
Örnek-2Örnek-2 2 FinishFinish StartStart CG B 10 D 35 H J E 24 I 15 A F K ABCDEFGHIJKABCDEFGHIJK — — A B B A C D A E,G,H F,I,J Immediate.
Planning and Managing Projects
Presentation transcript:

Project Management Chapter 2 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 02 -0 1

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall What is a Project? Project An interrelated set of activities with a definite starting and ending point, which results in a unique outcome for a specific allocation of resources. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

What is Project Management? A systemized, phased approach to defining, organizing, planning, monitoring, and controlling projects. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Defining and Organizing Projects Defining the Scope and Objectives Selecting the Project Manager and Team Recognizing Organizational Structure Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Planning Projects Defining the Work Breakdown Structure Diagramming the network Developing the schedule Analyzing cost-time trade-offs Assessing risks Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Work Breakdown Structure A statement of all the work that has to be completed. Activity The smallest unit of work effort consuming both time and resources that can be planned and controlled. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Work Breakdown Structure Relocation of St. John’s Hospital Level 0 Organizing and Site Preparation Physical Facilities and Infrastructure Level 1 Select administration staff Site selection and survey Select medical equipment Prepare final construction plans Bring utilities to site Interview applicants for nursing and support staff Purchase and deliver equipment Construct hospital Develop information system Install medical equipment Train nurses and support staff Level 2 02 -07 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.

Diagramming the Network Program Evaluation and Review Technique (PERT) Critical Path Method (CPM) Activity-on-Node approach Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Establishing Precedence Relationships Determining the sequence for undertaking activities. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 11

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.1 A — B — C A D B E B F A G C H D I A J E,G,H K F,I,J Immediate Predecessor I K Start A F C Finish G B J D H E Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 12

Immediate Predecessor(s) Application 2.1 The following information is known about a project Activity Activity Time (days) Immediate Predecessor(s) A 7 — B 2 C 4 D B, C E F 3 G 5 Draw the network diagram for this project Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Immediate Predecessor(s) Application 2.1 Activity Activity Time (days) Immediate Predecessor(s) A 7 — B 2 C 4 D B, C E F 3 G 5 B 2 F 3 D 4 Finish Start A 7 E 4 C 4 G 5 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Developing the Schedule Path The sequence of activities between a project’s start and finish. Critical Path – The sequence of activities between a start and finish that takes the longest time to complete. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Developing the Schedule Earliest start time (ES) - the latest earliest finish time of any immediately preceding activities Earliest finish time (EF) - the earliest start time plus its estimated duration EF = ES + t Latest finish time (LF) – the earliest of the latest start times of any of the immediately following activities. Latest start time (LS) - the latest finish time minus its estimated duration LS = LF – t Activity Slack - the maximum length of time an activity can be delayed without delaying the entire project LF-EF or LS-ES Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Developing the Schedule Latest finish time Latest start time Activity Duration Earliest start time Earliest finish time 2 12 14 A Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.2 Paths are the sequence of activities between a project’s start and finish. Finish Start A B C D E F G H I J K Path Time (wks) A-I-K 33 A-F-K 28 A-C-G-J-K 67 B-D-H-J-K 69 B-E-J-K 43 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 24

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.2 K 6 C 10 G 35 J 4 H 40 B 9 D E 24 I 15 Finish Start A 12 F 12 27 12 22 12 Earliest finish time Earliest start time 63 69 22 57 12 22 0 9 9 19 19 59 59 63 9 33 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.2 K 6 C 10 G 35 J 4 H 40 B 9 D E 24 I 15 Finish Start A 12 F 0 9 9 33 9 19 19 59 22 57 12 22 59 63 12 27 63 69 0 12 The Critical Path takes 69 weeks Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Latest finish time Example 2.2 K 6 C 10 G 35 J 4 H 40 B 9 D E 24 I 15 Finish Start A 12 F 0 9 9 33 9 19 19 59 22 57 12 22 59 63 12 27 63 69 0 12 48 63 53 63 59 63 Latest start time 2 14 0 9 63 69 24 59 19 59 35 59 14 24 9 19 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.2 S = 36 K 6 C 10 G 35 J 4 H 40 B 9 D E 24 I 15 Finish Start A 12 F 0 9 9 33 9 19 19 59 22 57 12 22 59 63 12 27 63 69 0 12 48 63 53 63 59 63 24 59 19 59 35 59 14 24 2 14 0 9 S = 0 S = 2 S = 41 S = 2 S = 2 S = 0 S = 0 S = 0 S = 0 S = 26 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Developing a Schedule Gantt chart Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.2 Calculate the four times for each activity in order to determine the critical path and project duration for the diagram in Application Problem 1. Activity Duration Earliest Start (ES) Latest Start (LS) Earliest Finish (EF) Latest Finish (LF) Slack (LS-ES) On the Critical Path? A 7 0-0=0 Yes B 2 C 4 D E F 3 G 5 The critical path is A–C–D–E–G with a project duration of 24 days. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.2 Calculate the four times for each activity in order to determine the critical path and project duration. Activity Duration Earliest Start (ES) Latest Start (LS) Earliest Finish (EF) Latest Finish (LF) Slack (LS-ES) On the Critical Path? A 7 0-0=0 Yes B 2 C 4 D E F 3 G 5 7 9 11 9-7=2 No 7 11 7-7=0 Yes 11 15 11-11=0 Yes 15 19 15-15=0 Yes 19 21 22 24 21-19=2 No 19 24 19-19=0 Yes Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.2 The critical path is A–C–D–E–G with a project duration of 24 days. Start Finish A 7 B 2 C 4 D E F 3 G 5 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Analyzing Cost-Time Trade-Offs Project Crashing Shortening (or expediting) some activities within a project to reduce overall project completion time. Project Costs Direct Costs Indirect Costs Penalty Costs Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Analyzing Cost-Time Trade-Offs Project Costs Normal time (NT) is the time necessary to complete an activity under normal conditions. Normal cost (NC) is the activity cost associated with the normal time. Crash time (CT) is the shortest possible time to complete an activity. Crash cost (CC) is the activity cost associated with the crash time. Cost to crash per period = CC – NC NT – CT Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Cost-Time Relationships Linear cost assumption 8000 — 7000 — 6000 — 5000 — 4000 — 3000 — 0 — Direct cost (dollars) | | | | | | 5 6 7 8 9 10 11 Time (weeks) Crash cost (CC) Normal cost (NC) (Crash time) (Normal time) Estimated costs for a 2-week reduction, from 10 weeks to 8 weeks 5200 Figure 2.6 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. 02 - 28

Analyzing Cost-Time Trade-Offs Determining the Minimum Cost Schedule: Determine the project’s critical path(s). Find the activity or activities on the critical path(s) with the lowest cost of crashing per week. Reduce the time for this activity until… It cannot be further reduced or Until another path becomes critical, or The increase in direct costs exceeds the savings that result from shortening the project (which lowers indirect costs). 4. Repeat this procedure until the increase in direct costs is larger than the savings generated by shortening the project. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

DIRECT COST AND TIME DATA FOR THE ST. JOHN’S HOSPITAL PROJECT Example 2.3 DIRECT COST AND TIME DATA FOR THE ST. JOHN’S HOSPITAL PROJECT Activity Normal Time (NT) (weeks) Normal Cost (NC)($) Crash Time (CT)(weeks) Crash Cost (CC)($) Maximum Time Reduction (week) Cost of Crashing per Week ($) A 12 $12,000 11 $13,000 1 1,000 B 9 50,000 7 64,000 2 7,000 C 10 4,000 5 600 D 16,000 8 20,000 2,000 E 24 120,000 14 200,000 8,000 F 10,000 6 4 1,500 G 35 500,000 25 530,000 3,000 H 40 1,200,000 1,260,000 12,000 I 15 40,000 52,500 2,500 J 13,000 3 K 30,000 34,000 Totals $1,992,000 $2,209,500 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Determine the minimum-cost schedule for the St. John’s Hospital project. Project completion time =69 weeks. Project cost = $2,624,000 Direct = $1,992,000 Indirect = 69($8,000) = $552,000 Penalty = (69 – 65)($20,000) = $80,000 A–I–K 33 weeks A–F–K 28 weeks A–C–G–J–K 67 weeks B–D–H–J–K 69 weeks B–E–J–K 43 weeks Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 STAGE 1 Step 1. The critical path is B–D–H–J–K. Step 2. The cheapest activity to crash per week is J at $1,000, which is much less than the savings in indirect and penalty costs of $28,000 per week. Step 3. Crash activity J by its limit of three weeks because the critical path remains unchanged. The new expected path times are A–C–G–J–K: 64 weeks B–D–H–J–K: 66 weeks The net savings are 3($28,000) – 3($1,000) = $81,000. The total project costs are now $2,624,000 - $81,000 = $2,543,000. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Finish K 6 I 15 F 10 C D H 40 J 1 A 12 B 9 Start G 35 E 24 STAGE 1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

A–C–G–J–K: 64 weeks and B–D–H–J–K: 64 weeks Example 2.3 STAGE 2 Step 1. The critical path is still B–D–H–J–K. Step 2. The cheapest activity to crash per week is now D at $2,000. Step 3. Crash D by two weeks. The first week of reduction in activity D saves $28,000 because it eliminates a week of penalty costs, as well as indirect costs. Crashing D by a second week saves only $8,000 in indirect costs because, after week 65, no more penalty costs are incurred. Updated path times are A–C–G–J–K: 64 weeks and B–D–H–J–K: 64 weeks The net savings are $28,000 + $8,000 – 2($2,000) = $32,000. Total project costs are now $2,543,000 – $32,000 = $2,511,000. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Finish K 6 I 15 F 10 C D 8 H 40 J 1 A 12 B 9 Start G 35 E 24 STAGE 2 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 STAGE 3 Step 1. The critical paths are B–D–H–J–K and A-C-G-J-K Step 2. Activities eligible to be crashed: (A, B); (A, H); (C, B); (C, H); (G, B); (G, H)— or to crash Activity K We consider only those alternatives for which the costs of crashing are less than the potential savings of $8,000 per week. We choose activity K to crash 1 week at $4,000 per week. Step 3. Updated path times are: A–C–G–J–K: 63 weeks and B–D–H–J–K: 63 weeks Net savings are $8,000 - $4,000 = $4,000. Total project costs are $2,511,000 – $4,000 = $2,507,000. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Finish K 5 I 15 F 10 C D 8 H 40 J 1 A 12 B 9 Start G 35 E 24 STAGE 3 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

A–C–G–J–K: 61 weeks and B–D–H–J–K: 61 weeks Example 2.3 STAGE 4 Step 1. The critical paths are still B–D–H–J–K and A–C–G–J–K. Step 2. Activities eligible to be crashed: (B,C) @ $7,600 per week. Step 3. Crash activities B and C by two weeks. Updated path times are A–C–G–J–K: 61 weeks and B–D–H–J–K: 61 weeks The net savings are 2($8,000) – 2($7,600) = $800. Total project costs are now $2,507,000 – $800 = $2,506,200. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Finish K 5 I 15 F 10 C 8 D H 40 J 1 A 12 B 7 Start G 35 E 24 STAGE 4 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.3 Stage Crash Activity Time Reduction (weeks) Resulting Critical Path(s) Project Duration (weeks) Project Direct Costs, Last Trial ($000) Crash Cost Added ($000) Total Indirect Costs ($000) Total Penalty Costs ($000) Total Project Costs ($000) — B-D-H-J-K 69 1,992.0 552.0 80.0 2,624.0 1 J 3 66 3.0 528.0 20.0 2,543.0 2 D A-C-G-J-K 64 1,995.0 4.0 512.0 0.0 2,511.0 K 63 1,999.0 504.0 2,507.0 4 B, C 61 2,003.0 15.2 488.0 2,506.2 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Project Activity and Cost Data Application 2.3 Indirect project costs = $250 per day Penalty cost = $100 per day past day 14. Project Activity and Cost Data Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor(s) A 5 1,000 4 1,200 — B 800 3 2,000 C 2 600 1 900 A, B D 1,500 E C, D F 1,300 1,400 G H 500 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.3 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Project Activity and Cost Data Maximum Crash Time (days) Application 2.3 Project Activity and Cost Data Activity Crash Cost/Day Maximum Crash Time (days) A 200 1 B 600 2 C 300 D 500 E 150 F 100 G H Normal Total Costs = Total Indirect Costs = Penalty Cost = Total Project Costs = $7,500 $250 per day  21 days = $5,250 $100 per day  7 days = $700 $13,450 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.3 Step 1: The critical path is , and the project duration is B–D–E–G–H 21 days. Step 2: Activity E on the critical path has the lowest cost of crashing ($150 per day). Note that activity G cannot be crashed. Step 3: Reduce the time (crashing 2 days will reduce the project duration to 19 days) and re-calculate costs: Normal Costs Last Trial = Crash Cost Added = Total Indirect Costs = Penalty Cost = Total Project Cost = $7,500 $150  2 days = $300 $250 per day  19 days = $4,750 $100 per day  5 days = $500 $13,050 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.3 Step 4: Repeat until direct costs greater than savings (step 2) Activity H on the critical path has the next lowest cost of crashing ($200 per day). (step 3) Reduce the time (crashing 2 days will reduce the project duration to 17 days) and re-calculate costs: Costs Last Trial = Crash Cost Added = Total Indirect Costs = Penalty Cost = Total Project Cost = $7,500 + $300 (the added crash costs) = $7,800 $200  2 days = $400 $250 per day  17 days = $4,250 $100 per day  3 days = $300 $12,750 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.3 (step 4) Repeat (step 2) Activity D on the critical path has the next lowest crashing cost ($500 per day). (step 3) Reduce the time (crashing 1 day will reduce the project duration to 16 days) and re-calculate costs: Costs Last Trial = Crash Cost Added = Total Indirect Costs = Penalty Cost = Total Project Cost = $7,800 + $400 (the added crash costs) = $8,200 $500  1 day = $500 $250 per day  16 days = $4,000 $100 per day  2 days = $200 $12,900 which is greater than the last trial. Hence we stop the crashing process. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Resulting Critical Paths Project Duration (days) Application 2.3 The recommended completion date is day 17. Trial Crash Activity Resulting Critical Paths Reduction (days) Project Duration (days) Costs Last Trial Crash Cost Added Total Indirect Costs Total Penalty Costs Total Project Costs — B-D-E-G-H 21 $7,500 $5,250 $700 $13,450 1 E 2 19 $300 $4,750 $500 $13,050 H 17 $7,800 $400 $4,250 $12,750 Further reductions will cost more than the savings in indirect costs and penalties. The critical path is B – D – E – G – H and the duration is 17 days. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Assessing Risks Risk-management Plans Strategic Fit Service/Product Attributes Project Team Capability Operations Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Assessing Risks Statistical Analysis Optimistic time (a) Most likely time (m) Pessimistic time (b) Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Statistical Analysis a m b Mean Time Beta distribution a m b Mean Time 3σ Area under curve between a and b is 99.74% Normal distribution Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Statistical Analysis The mean of the beta distribution can be estimated by te = a + 4m + b 6 The variance of the beta distribution for each activity is σ2 = b – a 6 2 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

a = 7 weeks, m = 8 weeks, and b = 15 weeks Example 2.4 Suppose that the project team has arrived at the following time estimates for activity B (site selection and survey) of the St. John’s Hospital project: a = 7 weeks, m = 8 weeks, and b = 15 weeks a. Calculate the expected time and variance for activity B. b. Calculate the expected time and variance for the other activities in the project. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.4 a. The expected time for activity B is te = = = 9 weeks 7 + 4(8) + 15 6 54 The variance for activity B is σ2 = = = 1.78 15 – 7 6 2 8 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.4 The following table shows the expected activity times and variances for this project. Time Estimates (week) Activity Statistics Activity Optimistic (a) Most Likely (m) Pessimistic (b) Expected Time (te) Variance (σ2) A 11 12 13 0.11 B 7 8 15 9 1.78 C 5 10 2.78 D 16 E 14 25 30 24 7.11 F 6 18 4.00 G 36 41 35 H 40 45 I 28 9.00 J 1 2 4 5.44 K Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.4 The director of continuing education at Bluebird University just approved the planning for a sales training seminar. Her administrative assistant identified the various activities that must be done and their relationships to each other: Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.4 The Network Diagram is: A D G J B E I Finish Start C F H Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Immediate Predecessor(s) Application 2.4 For the Bluebird University sales training seminar activities, calculate the means and variances for each activity. Activity Immediate Predecessor(s) Optimistic (a) Most Likely (m) Pessimistic (b) Expected Time (t) Variance (σ) A — 5 7 8 B 6 12 C 3 4 D 11 17 25 E 10 F C, E G 9 H I G, H J Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Immediate Predecessor(s) Application 2.4 For the Bluebird University sales training seminar activities, calculate the means and variances for each activity. Activity Immediate Predecessor(s) Optimistic (a) Most Likely (m) Pessimistic (b) Expected Time (t) Variance (σ) A — 5 7 8 B 6 12 C 3 4 D 11 17 25 E 10 F C, E G 9 H I G, H J 6.83 0.25 8.33 1.00 4.00 0.11 17.33 5.44 10.00 0.44 7.50 0.69 7.00 11.50 2.25 0.00 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Analyzing Probabilities Because the central limit theorem can be applied, the mean of the distribution is the earliest expected finish time for the project TE = = Expected activity times on the critical path  Mean of normal distribution Because the activity times are independent σp2 =  (Variances of activities on the critical path) Using the z-transformation where T = due date for the project z = T – TE σp Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.5 Calculate the probability that St. John’s Hospital will become operational in 72 weeks, using (a) the critical path and (b) path A–C–G–J–K. a. The critical path B–D–H–J–K has a length of 69 weeks. From the table in Example 2.4, we obtain the variance of path B–D–H–J–K: σ2 = 1.78 + 1.78 + 2.78 + 5.44 + 0.11 = 11.89 Next, we calculate the z-value: Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.5 Using the Normal Distribution appendix, we find a value of 0.8078. Thus the probability is about 0.81 the length of path B–D–H–J–K will be no greater than 72 weeks. Length of critical path Probability of meeting the schedule is 0.8078 Normal distribution: Mean = 69 weeks; σ = 3.45 weeks Probability of exceeding 72 weeks is 0.1922 Project duration (weeks) 69 72 Because this is the critical path, there is a 19 percent probability that the project will take longer than 72 weeks. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Example 2.5 b. The sum of the expected activity times on path A–C–G–J–K is 67 weeks and that σ2 = 0.11 + 2.78 + 7.11 + 5.44 + 0.11 = 15.55. The z-value is The probability is about 0.90 that the length of path A–C–G–J–K will be no greater than 72 weeks. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.5 The director of the continuing education at Bluebird University wants to conduct the seminar in 47 working days from now. Using the activity data from Application 2.4, what is the probability that everything will be ready in time? T = TE is: 47 days 43.16 days And the sum of the variances for the critical activities is: (0.25 + 5.44 + 0.69 + 2.25) = 8.63 The critical path is and the expected completion time is A–D–G–I, 43.16 days. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.5 The Network Diagram is: A D G J B E I Finish Start C F H The critical path is A-D-G-I Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Application 2.5 T = 47 days TE = 43.16 days And the sum of the variances for the critical activities is: 8.63 z = T – TE σ2  = = = 1.31 3.84 2.94 47 – 43.16 8.63  Assuming the normal distribution applies, we use the table for the normal probability distribution. Given z = 1.30, the probability that activities A–D–G–I can be completed in 47 days or less is 0.9049. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Monitoring and Controlling Projects Monitoring Project Status Open Issues and Risks Schedule Status Monitoring Project Resources Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.1 Your company has just received an order from a good customer for a specially designed electric motor. The contract states that, starting on the thirteenth day from now, your firm will experience a penalty of $100 per day until the job is completed. Indirect project costs amount to $200 per day. The data on direct costs and activity precedent relationships are given in Table 2.2. a. Draw the project network diagram. b. What completion date would you recommend? Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

ELECTRIC MOTOR PROJECT DATA Solved Problem 2.1 ELECTRIC MOTOR PROJECT DATA Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor(s) A 4 1,000 3 1,300 None B 7 1,400 2,000 C 5 2,700 D 6 1,200 E 900 2 1,100 F 11 2,500 3,750 G 800 1,450 D, E H 300 1 500 F, G Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.1 The network diagram is shown in Figure 2.10. Keep the following points in mind while constructing a network diagram. Start Finish A 4 B 7 C 5 D 6 E 3 F 11 G H Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Maximum crash time = Normal time – Crash time = Solved Problem 2.1 With these activity times, the project will be completed in 19 days and incur a $700 penalty. Using the data in Table 2.2, you can determine the maximum crash-time reduction and crash cost per day for each activity. For activity A Maximum crash time = Normal time – Crash time = 4 days – 3 days = 1 day Crash cost per day = = Crash cost – Normal cost Normal time – Crash time CC – NC NT – CT = = $300 $1,300 – $1,000 4 days – 3 days Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Maximum Time Reduction (days) Solved Problem 2.1 Activity Crash Cost per Day ($) Maximum Time Reduction (days) A 300 1 B 200 3 C 700 D E F 250 5 G 650 H 100 2 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.1 PROJECT COST ANALYSIS Stage Crash Activity Time Reduction (days) Resulting Critical Path(s) Project Duration (days) Project Direct Costs, Last Trial ($) Crash Cost Added ($) Total Indirect Costs ($) Total Penalty Costs ($) Total Project Costs ($) — C-F-H 19 10,100 3,800 700 14,600 1 H 2 17 200 3,400 500 14,200 F A-D-G-H 15 10,300 3,000 300 14,100 B-E-G-H Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

A–D–G–H: 15 days, B–E–G–H: 15 days, and C–F–H: 17 days Solved Problem 2.1 The critical path is C–F–H at 19 days, which is the longest path in the network. The cheapest activity to crash is H which, when combined with reduced penalty costs, saves $300 per day. Crashing this activity for two days gives A–D–G–H: 15 days, B–E–G–H: 15 days, and C–F–H: 17 days Crash activity F next. This makes all activities critical and no more crashing should be done as the cost of crashing exceeds the savings. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 An advertising project manager developed the network diagram in Figure 2.11 for a new advertising campaign. In addition, the manager gathered the time information for each activity, as shown in the accompanying table. Calculate the expected time and variance for each activity. Calculate the activity slacks and determine the critical path, using the expected activity times. What is the probability of completing the project within 23 weeks? Start Finish A B C D E F G Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Immediate Predecessor(s) Solved Problem 2.2 Time Estimate (weeks) Activity Optimistic Most Likely Pessimistic Immediate Predecessor(s) A 1 4 7 — B 2 6 C 3 D 13 14 E 12 A, C F 8 16 G 5 E, F Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 The expected time and variance for each activity are calculated as follows te = a + 4m + b 6 Activity Expected Time (weeks) Variance A 4.0 1.00 B 5.5 0.69 C 3.5 0.25 D 12.0 1.78 E 6.5 2.25 F 9.0 2.78 G 4.5 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Earliest Start (weeks) Earliest Finish (weeks) Solved Problem 2.2 We need to calculate the earliest start, latest start, earliest finish, and latest finish times for each activity. Starting with activities A and B, we proceed from the beginning of the network and move to the end, calculating the earliest start and finish times. Activity Earliest Start (weeks) Earliest Finish (weeks) A 0 + 4.0 = 4.0 B 0 + 5.5 = 5.5 C 5.5 5.5 + 3.5 = 9.0 D 4.0 4.0 + 12.0 = 16.0 E 9.0 9.0 + 6.5 = 15.5 F 5.5 + 9.0 = 14.5 G 15.5 15.5 + 4.5 = 20.0 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 Based on expected times, the earliest finish date for the project is week 20, when activity G has been completed. Using that as a target date, we can work backward through the network, calculating the latest start and finish times Activity Latest Start (weeks) Latest Finish (weeks) G 15.5 20.0 F 6.5 E 9.0 D 8.0 C 5.5 B 0.0 A 4.0 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 A 4.0 0.0 8.0 D 12.0 16.0 20.0 E 6.5 9.0 15.5 G 4.5 C 3.5 5.5 F 14.5 B Finish Start Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 Start (weeks) Finish (weeks) Activity Earliest Latest Slack Critical Path A 4.0 8.0 No B 0.0 5.5 Yes C 9.0 D 16.0 20.0 E 15.5 F 6.5 14.5 1.0 G Path Total Expected Time (weeks) Total Variance A–D 4 + 12 = 16 1.00 + 1.78 = 2.78 A–E–G 4 + 6.5 + 4.5 = 15 1.00 + 2.25 + 0.69 = 3.94 B–C–E–G 5.5 + 3.5 + 6.5 + 4.5 = 20 0.69 + 0.25 + 2.25 + 0.69 = 3.88 B–F–G 5.5 + 9 + 4.5 = 19 0.69 + 2.78 + 0.69 = 4.16 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall Solved Problem 2.2 The critical path is B–C–E–G with a total expected time of 20 weeks. However, path B–F–G is 19 weeks and has a large variance. We first calculate the z-value: z = = = 1.52 T – TE σ2  23 – 20 3.88 Using the Normal Distribution Appendix, we find the probability of completing the project in 23 weeks or less is 0.9357. Because the length of path B–F–G is close to that of the critical path and has a large variance, it might well become the critical path during the project Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall

Printed in the United States of America. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America. Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall