March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.

Slides:



Advertisements
Similar presentations
New Corporate Identity Poster Design Department of Physics and Astronomy, University College London Erdem Motuk, Martin Postranecky, Matthew Warren, Matthew.
Advertisements

Sundance Multiprocessor Technology SMT702 + SMT712.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
The Service and Support of recordum and related topics Aleksandar Tomic, June 2012.
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
Slide 1 ITC 2005 Gunnar Carlsson 1, David Bäckström 2, Erik Larsson 2 2) Linköpings Universitet Department of Computer Science Sweden 1) Ericsson Radio.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 Cooling Unit.
USB Mass-Storage Implementation on an Embedded System (D0113) Supervisor: Dimitry Sokolik Performed by: Yoav Gershoni Shachar Faigenblat Final Presentation.
Shelf Management & IPMI SRS related activities
Australian Monitor Products Here is a look the AMIS product line & some of our other products from AM Pro & AMAV.
Team Members Jordan Bennett Kyle Schultz Min Jae Lee Kevin Yeh.
Laboratory 7 Introduction to LabVIEW General Engineering Department Polytechnic University.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
LUMEN ALARM & LIGHTING SYSTEM Artem Aginskiy, Grayson Carr, Yinuo James Chen, Andrew McDowell.
ZTF Interconnecting Scheme Stephen Kaye
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
About Samway Electronic SRL Founded in 2005 in Bucharest, Romania Focused on management and monitoring solutions for telecom/industrial computers Active.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
LSU 09/19/2013BalloonSat Development Board1 The BalloonSat Development Board Programming Unit, Lecture 1.
ΜTCA for physicists? A project of PH-ESE group to evaluate platforms for uTCA based systems at CERN and in the HEP community M. Joos, CERN on behalf of.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Features : VMAX-MIPI is a pattern generator which supports Full-HD resolution. VMAX-MIPI has one MIPI connector(29Pin), 4 programmable power. PC to USB.
The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Laboratory 5: Introduction to LabVIEW
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
Family of devices. Important differences VC MC Technical data.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3 December 2007 The Importance.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Design of an AdvancedTCA board Management Controller Solution
Vinculum II Development Modules
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
E. Hazen - Back-End Report
AMC13 Status Report AMC13 Update.
New xTCA Developments at SLAC
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Module 1 – Power Supply AMC APS-PBC-60
IRRInet-M IRRInet-ACE Product Introduction
Splash.
Electronics, motion control and verification
Presentation transcript:

March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan

March 2011 AMC and uRTM load boards Introduction Simple dummy load modules. These load boards will be used as test tools in the frame of the uTCA evaluation project. Single width load boards already exist on the market. However, we want to build our own set of MTCA.4 compatible boards (double width, mid-size AMC load board and uRTM load board). ELMA load module: single width, full-size AMC and uRTM formats

March 2011 AMC and uRTM load boards Main functionalities: AMC and uRTM payload power simulation (remote and local switching capability of on-board dummy loads) Remote control and monitoring (IPMI) On-board temperature readings. Backplane voltage readings (MP and PP). Switching (actuation) of loads (custom IPMI commands). Payload power current reading (custom IPMI command). Clock and power voltages test points. External power connection for the use of lab electronics loads. Optional (AMC load board specific): uRTM connector for connection of the uRTM load board (MTCA.4).

March 2011 AMC and uRTM load boards AMC load board main features: Double-width, mid-size AMC. Based on the CPPM MMC (new connector version). Front panel: o LEDs: standard AMC status, load monitoring, MP and PP presence. o Test points: MP and PP voltages, (optional: clks). o Dip switch: manual switch on/off of loads. Load distribution (90W, AMC std: 80W): 1 x 20W 7 x 10W uRTM load board main features: Same as AMC load board but: o No MMC. o Load distribution (40W, MTCA.4: 30W):  1 x 10W  6 x 5W

March 2011 AMC and uRTM load boards AMC block diagram

March 2011 AMC and uRTM load boards uRTM block diagram

March 2011 AMC and uRTM load boards Current status: Schematic design is finished and has been reviewed for both, AMC and uRTM. Placement and routing: - AMC: nearly finished. - uRTM: to be started. First proto AMC load board (without the uRTM connector) is expected end of April. First uRTM proto is expected ~ mid-May. Production plan: o 12 AMC without the uRTM connector. o 12 AMC with the uRTM connector. o 12 uRTM. More information is available here: uTCAEvaluationProject/uTCA_load_board/uTCA_load_board_public/default.aspxhttps://espace.cern.ch/ph-dep-ESE-BE- uTCAEvaluationProject/uTCA_load_board/uTCA_load_board_public/default.aspx