Electric Entities: New Models

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

Bosnia and Herzegovina
Dr. Bader Eddin Al-Majali
Petroleum, Chemicals and Petrochemicals Investment region (PCPIRs) Specialty Chemicals Conclave
Baltic Energy Strategy Einari Kisel Director of Energy Department.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
1 Framing Regulatory and Government Policy India Energy Mart 2004 New Delhi S L Rao.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
Hydropower Development: Experience of Nepal
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Towards Regional Independent Operators – a main driver for successful market integration.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
The Continuing Evolution of U.S. Electricity Markets
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Electricity Reforms in Bangladesh
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
Republic of India is a Neighbour of China Most Populous Countries. It is No.2. China is No. 1. It has unique history of Political stability and a Socialistic.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
5/22/2003Luthra & Luthra, Law offices1 ELECTRICITY BILL, 2003 Presented by Mohit Saraf Partner Luthra & Luthra Law Offices May 22, 2003.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Updated 1/28/2011.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Competition in the Indian electricity sector The experience so far Shahid Hasan Fellow, Energy Reforms Group The Energy and Resources Institute New Delhi,
Power Sector Reform in Russia: Results and Steps Forward Y.A. Udalcov, Board Member, Head of the Reform Management Centre JSC “Unified Energy System of.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Electric Entities: New Models Sh. R.P. Singh CHAIRMAN & MANAGING DIRECTOR POWER GRID CORPORATION OF INDIA LIMITED.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
Industrial Policy Faculty – Lovely School Of Business LPU.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Transmission Tariff V.Balaji Chief Manager SRLDC.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
The 3rd package for the internal energy market
Open Access.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010
International Conference
Massachusetts Electric Restructuring Roundtable
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Electric Entities: New Models Sh. R.P. Singh CHAIRMAN & MANAGING DIRECTOR POWER GRID CORPORATION OF INDIA LIMITED

Power Sector Reforms Worlwide DEVELOPING COUNTRIES To mobilise private investment efficiently and quickly to meet rapid growth in demand To improve efficiency and quality of service. DEVELOPED COUNTRIES To keep downward pressure on costs and prices To increase efficiency through competition.

Power Sector Reforms: the Trend Unbundling into Generation, Transmission and Distribution Regulation of monopolistic segments Introduction of competition Establishment of predictable, transparent and unambiguous regulatory framework

VARIOUS MODEL ADOPTED WORLD OVER UK Foremost country to restructure Vertically integrated CEGB unbundled. Transmission & Grid operation entrusted to NGC (TSO) Australia Went for unregulated Merchant Transmission Not met with much success and reverted back to regulated status United States Generation, transmission & distribution unbuindles and many utilities setup Independent System Operator (ISO) USA is now moving towards TSO model through RTO French model Canadian model

UK & South African Model G G G G G T + SO D D D D D This model is also followed in other European countries like Norway, Sweden, Finland, Netherland, Denmark etc.

G G G G G G RTO SO T T T SO D D D D D D American Model G G G G G G RTO SO T T T SO D D D D D D This model is followed in USA. Based on their California experience, USA is now moving towards TSO model through RTO.

G T + SO D RTE EdF French Model This model is followed in France, wherein Transmission and System Operation functions have been delegated to RTE. EdF is responsible for the Generation and the Distribution.

G G G G T T T SO TA D D D D Canadian Model This model is followed in Alberta, Canada. In this model, since, there are more than one main transmission companies, an independent System Operator and Transmission Administrator exist.

Indian Electricity Market; Evolution Electricity Act, 1887 First legislation on Electricity in India. Basic legal frame work for Electricity Supply Industry was provided. Electricity Act, 1910 Electricity (Supply) Act, 1948 Dealt with Statutory Powers and functions of CEA, SEBs and Generating Companies. State Electricity Boards were formed as vertically integrated utilities. 1948 Country demarcated into five regions and Regional Electricity Boards established. 1963 1975 Central Sector generating Utilities like NTPC, NHPC were established. Policy decision taken by GoI to form a National Grid 1981 Cont …

Indian Electricity Market; Evolution …Cont. 1989 POWERGRID was formed. Power Sector reforms introduced in a limited way 1991 Private Sector Participation in Power Generation was opened . 1998 Private Sector participation in transmission was opened. Electricity Regulatory Commission Act, 1998 promulgated. CERC at Central level & SERCs at State level to be established. 1998 Power Sector reforms gained momentum in a bid way 2003 Electricity Act 2003 was enacted, repealing all previous Acts.

Indian Electricity Market; Evolution Electricity Act, 2003 – salient points: Delicensing of generation, Transmission, Distribution & Power trading – licensed activity More than one distribution licensee in the same area Facilitating open access to transmission & distribution Metering of all electricity with stringent theft penalties Power producers to choose credit worthy buyers CPPs to sell additional capacity through “open access”

Open Access Greatly misunderstood Does not mean “Free for all” Phenomenal cost to build the Transmission Network to transfer any quantum of power from one point to the other, Transmission facilities to transfer power from definite sources to defined customers Only some operational margins available. Can be used to transfer economic power to bridge demand-supply gap

Inter-State Long-term Open Access Central Transmission Utility (CTU) ; Nodal agency Period of Applicability ; 25 years or more Procedure, guidelines and Terms and conditions formulated and available at POWERGRID web-site System studies to determine whether system strengthening required or not.

Short - Term Open Access Short Term Access– upto 1 year usage Nodal Agency - RLDC of the region in which the importing utility is located. Trading of surpluses Approval subject to transfer capacity available Reduced priority then long-term Economically priced ( ¼ th of long term ) Allotment based on e-bidding, in case of congestion in Transmission corridor

Role of POWERGRID POWERGRID, the Central Transmission Utility to take up construction, operation and maintenance of major EHV transmission network and for operation of Regional and National Grid. Investment of Rs. 70,000 crores planned during 2002-12 for supporting generation capacity addition of 100,000 MW and for National Grid

Role of POWERGRID Development of National Grid Interregional power transfer capacity enhanced to 8500 MW Planned to further enhance it to 2300 MW by 2006-07 and 30,000 MW by 2009-10.

POWERGRID in Southern Region Power situation in SR had various problems poor frequency, poor voltage depleted natural resources POWERGRID evacuating power from 4500 MW Central Generating units in SR over 6700 Ckt Kms & 15 S/S SR greatly benefited by Inter-regional Links like 1000 MW at Chandrapur between WR & SR 500 MW at Gajuwaka between ER & SR 2000 MW HVDC bipole between ER & SR’ Further investment of 7500 Crore planned during next 5 yrs POWERGRID’s telecom network extends upto Cochin

POWERGRID & Grid Management Many Milestones Achieved Three of the RLDCS (SR, NR & NER) modernised to improve effective Grid Operation NO MAJOR GRID DISTURBANCE IN 2003-04 DUE TO proactive approach in grid management commercial mechanism under ABT modernisation of RLDCS implementation of inter-regional links deployment of expert manpower round the clock vigil

ISO Vs. TSO; A Debate UK has kept Transmission & System Operation together In North America, FERC introduced RTOs by bringing together system operators and transmission providers Their not being under one umbrella was identified as one of the major reasons for recent grid collapses In China and South Africa also, transmission and Load Despatch Centres are retained together after restructuring.

ISO Vs. TSO; A Debate INDEPENDENT SYSTEM OPERATOR (ISO) System operation is independent of the function of transmission system development ISO prevalent when there are multiple transmission agencies TRANSMISSION SYSTEM OPERATOR (TSO) Grid operation as well as transmission system development with single entity TSO prevalent where unbundling has taken place and there is one transmission utility

ISO Vs. TSO ; A Debate In India, Transmission and system operation being under one umbrella is one of the major reasons for the outstanding performance of Indian grid Convenient to identify transmission congestion and make decisions to adopt suitable technology for power transfer

Economic Power Supply to Agriculture Reforms have laid special emphasis on improving distribution sector and rural electrification Endeavor to provide secure, reliable and economic power to agriculture Agriculture extends a helping hand in maintaining Grid Stability Flattening of Load Curve; reduces the gap between off-peak & peak Contains high voltage during off-peak Non-supply of agriculture during off peak will lead to hostile load, frequency & voltage curve and high cost of energy to meet peak load

Economic Power Supply to Agriculture Enough scope is available to supply economic power to agriculture without burdening the exchequer Disproportional losses in Power Sector not on account of agriculture but due to rampant theft Cheaper power from the neighboring regions can be important during off peak time Availability based Tariff leads to very less cost of energy during off peak time

Conclusion – Challenges and Issues MAJOR ISSUES WITH REGARD TO REFORMS commercial interest takes precedence over public interest development of environmental friendly generation capacity and provision of electricity for rural areas does not remain a consideration GOVERNMENTS’ ROLE VERY IMPORTANT IN TERMS OF SETTING UP REGULATORY FRAMEWORKS SO THAT THESE ISSUES ARE ADDRESSED