1 Project Charter DEFINE. 2 Project Charter DEFINE.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

WAREHOUSING MANAGEMENT
PowerPoint Basics. PowerPoint basics: Part 1 An introduction to producing PowerPoint presentations as ONE tool to help you deliver your message Presented.
ISO 9001:2000 Certified Next Steps? Where do we go from here?
Statistical Analysis with Excel
Spreadsheets and Non- Spatial Databases Unit 4: Module 15, Lecture 2- Advanced Microsoft Excel.
IENG 451 JIT. Production Physics Little’s Law Throughput = WIP/Cycle time For fixed capacity, cycle time and WIP or proportional – thus you can increase.
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Generation of atlas graphs & charts. Objective The major objective this training session is to equip participants with the knowledge and skills of creating.
How To Make Graphs in Microsoft Excel Outline Making Bar Graphs Making Scatter Plots – 1 series Making Scatter Plots – Multiple Series.
Define Measure Analyze Improve Control 1 Project Title BB Candidate Name Define.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Creating a Bar Chart. Create a frequency distribution based on the classes.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
How to Make a Pie Chart to show Religious and Ethnic Breakdown of a Country.
Statistical Analysis with Excel (PREVIEW). Spreadsheet Programs First developed in 70s –VisiCalc Dan Bricklin and Bob Frankston –Operated on Apple II.
Finishing Your Green Home Project. Pictures and Pie Chart Using 365 When you “Edit Workbook”, choose to “Open in Excel” – Pie Chart: Follow the directions.
Chapter 4 Process Design.
To make a graph in Excel, first you have to highlight the data you want to graph. To do this, click and drag over the “blocks” you need. Be sure to include.
Microsoft Office 2007 Intermediate© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! With Microsoft ® Office 2007 Intermediate Chapter.
This is what a blank excel workbook looks like. To start there are three separate sheets on which to store data. Down the left side are the ROW labels.
Fall CS-EE 480 Lillevik 480f06-l10 University of Portland School of Engineering Senior Design Lecture 10 Webs Scheduling MS Project (Optional)
S9k Production Floor System Ingredient Inventory Production Inventory Production Dashboard.
BRIDGET EGGERS, RICHARD LATHAM TYLER BRENT, VALERIA GONZALEZ Frozen Cookies Capacity Increase.
2010 Staff Development - Tony Judice. Highlight the area to be graphed. Highlight labels, in this case days of the week, and the values that apply to.
How to Make a Power Point. How to Open Power Point Go to the bottom of the screen Click on START PROGRAMS MICROSOFT WORD PROGRAMS MICROSOFT OFFICE POWER.
Building a Map in PowerPoint Steps for inserting and building a map EGEO 250 Lecture 1b Updaged 4/6/2010.
University of Southern California Center for Systems and Software Engineering MS Project Tutorial CSCI-577a Software Engineering I Fall 2008 Itti Charoenthongtrakul.
Training Day 5 Customer Order Processing Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
TI 2111 Work System Design and Ergonomics 2. Problem Solving Tools.
WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT SOLUTION APPROACH May 21 st 2012.
Case1:Chick-n-Gravy Dinner Line Group 2+1 Members : Delia Victoria Adrian Gary Yoong Terry.
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
1 1 TECNOMATIX eM-Plant-Shop - Training. 2 2 Application Objects Modeling, simulation, animation and evaluation of discrete production systems in the.
Fundamentals of Project Management and Schedule Development.
CPI Event / Project Tollgate Template
BDM-WEEK-8&9 USING MS EXCEL & POWER POINT for CREATING GRAPHS & CHARTS
Main presentation title Second title line if required
Main presentation title
Kroger Food Depot – “a Proposed Walk-Through”
Presenter Name Presentation Date
Ecology Mini Book Biology
Presenter Name Presentation Date
EPICS Design Review Template Notes:
OPS/571 Operations Management
Presenter Name Presentation Date
S9k Traceability System
AN OUTSTANDING POWERPOINT
Statistical Analysis with Excel
  Figure 7.1 Track Layout with Input Sensors and Output Switches and Output Tracks.
Statistical Analysis with Excel
Project Title Date Location of Kaizen Author.
Case Title Subtitle (if applicable)
Poster Title Researchers’ Names Company or Institution
Presenter Name Presentation Date
Insert Headline (28 pt. text) Maximum 2-3 Lines. Title Case.
A B C TOWER BLOCK TOOL KIT BLOCK TOWER TOOL KIT
  Figure 8.1 Track Layout with Input Sensors and Output Switches and Output Tracks.
Green Belt Project Storyboard
Please insert Title Please insert sub-title 1
WHITE DELI SUB PRODUCTION PROCESS IMPROVEMENT
Presenter Name Presentation Date
Site (e.g., LARC Embakasi)
Presenter Name Presentation Date
Sample PowerPoint presentation
Project Title Fellow(s) name(s)
Communication with PowerPoint
CPI Event / Project Tollgate Template
Presentation transcript:

1 Project Charter DEFINE

2 Project Charter DEFINE

3 Project Timeline DEFINE

4 Tools Used DEFINE

5 Process Map DEFINE

6 Deli Subs Production UNCONTROLLABLE PARAMETERS Breakdowns Stores Orders Machine Type Floor Layout OUTPUTS Packed Frozen Wheat Deli Sub Packed Frozen White Deli Subs Ingredients Warehouse Wegmans Frozen Warehou ses S uppliers I nputs P rocess O utputs C ustomer DEFECTS Forming Quality Product Consistency Primary Distributors Shipping Secondary Distributors INPUTS Ingredients List Bakery Ingredients Mixer Settings Divider Settings Freezer Settings Packaging Materials Labeling Settings PROCESS CONTROLS Ingredients Batching and Mixing Machine Settings Machine Staffing Daily Schedule execution SIPOC DEFINE Wegmans Stores

7 Fishbone Diagram MEASURE

8 Data Collection MEASURE Existing Mezzanine Tracking Sheet (Packing Operation Start and End Time, Case Count) Existing Mixing Schedule (Unload Time New Form for Remix, Scrap & Breakdown Time Study of Mixing and Packing Processes QA Test Results Artisan Process Control Recommendations

9 Results Overview ANALYZE

10 Improvement Axis ANALYZE Schedule & Pace Operation Optimization Batch Size Mixing Machine Settings & Fine Tuning Operators Training Machine Condition & Performance Process Quality Standard Work Process quality Mixing

11 Mixing Axis ANALYZE Simulate Process Evaluate Ergonomically Improve Process

12 Remix and Scrap Axis ANALYZE Process Quality Parameters Recommended Settings Possible adjustments

13 Slide Title IMPROVE Coming Up Next ! Thanks for your Attention

14 Slide Title CONTROL (Add Control Tools and Update Slide Title) Takeaway: What are the takeaways?

15 Slide Title CONTROL (Add Control Tools and Update Slide Title) Takeaway: What are the takeaways?

16 Potential Future Project List CONTROL

17 Takeaway: What are the takeaways? Tips and Hints Complete the page 1 of Project Charter for new projects Finish page 2 by the end of the Define phase Tell a “Story” with the presentation – walking the audience through your process with major takeaways at each step. Copy and paste the Takeaway kicker box at the bottom of this page to highlight items for slides Insert new slides, as necessary, for each phase Keep the Gantt Chart and Tools Used slides up to date Compress pictures used in presentation to minimize file size List Potential Future Projects as they are discussed in project work