This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be.

Slides:



Advertisements
Similar presentations
The Meldrum Bar Park Project Restoring Habitat Through Job Training and Environmental Education.
Advertisements

EQUESTRIAN SKILLS PARK. Vision Statement The Equestrian Skills Park (official name pending) will be a dynamic and fun venue that will inspire equestrians.
PENN STATE STUDENT CHAPTER Design-Build Institute of America (DBIA)
Note to presenters - This file is part of the FS Resources section at: This presentation should.
1 This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may.
Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director.
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
City of Tacoma Homeless Services
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
Capital Improvement Program City of Warren, Ohio April 2012.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Save the Redwoods League protects and restores redwood forests and connects people with their peace and beauty so these wonders of the natural world flourish.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Charge: The BCTCC is charged with maintaining and advancing the Blue Clay Bike Park Mountain Bike Trails according to the provisions of the MOU between.
< This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Parking Lot 53 Hydraulic Analysis Aaron Gutierrez Aaron Libson William Ryman Alejandro Valenzuela.
Management strategies and policies for achieving and maintaining healthy and sustainable outdoor environments that may be adopted by public and private.
Watershed Update. The Coalition for the Upper South Platte works to protect the water quality and ecological health of the Upper South Platte through.
Embracing Tree Health Monitoring. TREE HEALTH MONITORING PROJECT PARTNERS.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Testing the Terrain Off-road Cycling Pilot Project in Wirth Park.
DPW BD&C Employee Performance Evaluation Guideline Discussion
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Module 7: Construction Phase
Soil Erosion Lesson Plan: NRES B2-10.
Sonoma Ecology Center TMDL Implementation Project Update November 4, 2011 Funded by EPA, Managed by SFEP, Administered by MMWD, and north bay partnership.
Outdoor Recreation 12. Outdoor recreation 12 is an activity oriented course, geared toward the outdoors. All of the activities will have a self-propelled.
< This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Basic Principles of Agricultural/Horticultural Science
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Four Proposals from Oconee County. 2 We are all unique and have different experiences and perspectives. **** Opportunities And Challenges.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
DISTRICT IMPROVEMENT PLAN Technology Domain Annual Progress Report Lakewood School District # 306.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
 Managing for recreation quality means providing a choice of settings which will accommodate a variety of activities necessary to achieve desired outcomes.
Field Study: Cove Trail at the Home of Franklin D. Roosevelt, Hyde Park, NY Avery Cross Cove Trail is part of the Roosevelt Woods Trail (Hike F), which.
Back Country Horsemen of America Trail Classification Assistance Program Goal Assist the Forest Service in properly establishing the correct Management.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Twin Peaks – Mt. SutroTwin Peaks – Mt. Sutro Connector Trail Community MeetingConnector Trail Community Meeting February 2, 2016February 2, 2016.
 Provide many social, environmental and economic benefits.  They provide 10,500 hectares of recreational space, improve air quality, control flood waters,
NY-NJ Trail Conference West Hudson North accomplishments for 2015 Black Rock Forest Minnewaska State Park Preserve Schunemunk State Park Storm King State.
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
RUSHMORE CONNECTOR TRAIL WELCOME Rushmore Connector Trail Environmental Impact Statement Scoping Meeting June 14, Hill City June 16, Rapid.
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Stormwater Pollution Prevention Program Compliance
Successful Management of Multiple Use Forest Trails
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
KENNESAW MOUNTAIN TRAIL CLUB WORKDAY DRAFT
Ellsworth Library Trail
KENNESAW MOUNTAIN TRAIL CLUB WORKDAY 1/13/18 DRAFT
Visitor Management at Fossil Creek
Soil Conservation.
This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be.
Walker Street Reconstruction Project 25% Design Public Hearing
Stream Management Implementation Program Schoharie Watershed Advisory Committee Meeting October 24th, 2018.
Monterey County Project Report for Measure X Expenditures
Most of the rail was for single passage ( not for two way traffic )
Stream Crossing Replacement Policy
Sacramento Environmental Commission January 2019.
Successful Management of Multiple Use Forest Trails
Presentation transcript:

This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest, you can visit this toolbox by visiting the following URL: =toolboxes&sec=tools. All toolboxes are products of the Arthur Carhart National Wilderness Training Center. This document is contained within the Traditional Tools and Skills Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest, you can visit this toolbox by visiting the following URL: =toolboxes&sec=tools. All toolboxes are products of the Arthur Carhart National Wilderness Training Center.

SHAWNEE NATIONAL FOREST HIDDEN SPRINGS RANGER DISTRICT TRAIL DESIGNATION PROJECT PHASE 1 FISCAL YEAR 2006

PHASE 1 - FISCAL YEAR 2006 PROJECT ACCOMPLISHMENTS DESIGNATED WILDERNESS AREAS (hand crews and pack stock) Constructed 4 miles of new full-bench trail re-routes. Constructed 4 miles of new full-bench trail re-routes. Hauled 240 tons of gravel by pack stock to harden over 5 miles of existing trail tread. Hauled 240 tons of gravel by pack stock to harden over 5 miles of existing trail tread. Relocated and reconstructed a creek crossing. Relocated and reconstructed a creek crossing. Converted an equestrian tie-up area to ride-through-only trail status. Converted an equestrian tie-up area to ride-through-only trail status. Constructed a new equestrian tie-up area. Constructed a new equestrian tie-up area. Brushed in nearly 4 miles of old, non-designated trail. Brushed in nearly 4 miles of old, non-designated trail. Installed 50 new directional signs. Installed 50 new directional signs. NON-WILDERNESS AREAS (mechanized equipment) Reconstructed nearly three miles of existing trail. Reconstructed nearly three miles of existing trail. Constructed two miles of new trail. Constructed two miles of new trail. Installed 173 new directional signs in project area. Installed 173 new directional signs in project area. Over 350 hours of volunteer time donated to trail reconstruction. Over 350 hours of volunteer time donated to trail reconstruction.

PHASE 1 - FISCAL YEAR 2006 PROJECT ACCOMPLISHMENTS TRAIL MAINTENANCE Trail maintenance was conducted on 20 miles of trail to clear blow downs, install erosion control features, and reinforce stream banks. Trail maintenance was conducted on 20 miles of trail to clear blow downs, install erosion control features, and reinforce stream banks. TRAIL MONITORING Trail monitoring was conducted on approximately 60 miles of trail in designated wilderness and non-wilderness areas. Trail monitoring was conducted on approximately 60 miles of trail in designated wilderness and non-wilderness areas. A comprehensive Trail Monitoring Report was completed. A comprehensive Trail Monitoring Report was completed.

WILDERNESS TRAIL WORK Before – eroded non-designated section of trail falling straight down the canyon. After – new re-route following the natural contour and proper grade. Implementation of the Trail Designation Project began with the construction of a re-route and switchback in the Lusk Creek Wilderness.

WILDERNESS TRAIL WORK Before – non-designated section of trail along Lusk Creek. After – properly located re-route well above the creek. The trail crew focused on constructing re-routes to improve trail and resource conditions in the Lusk Creek Wilderness.

WILDERNESS TRAIL CREW Crew members moved over 330 tons of gravel and sandstone using only pack animals and hand tools. In accordance with wilderness policy, the trail crew used only primitive tools and traditional methods to construct the 4 miles of trail re-routes.

WILDERNESS TRAIL WORK Work on the re-routes included the installation of unique trail features such as a switchback with French drain, a stone stair case descending hundreds of feet into a canyon, and several hundred linear feet of cribbed retaining walls and turnpikes. Stone steps located at Secret Canyon. Switchback with French drain.

WILDERNESS TRAIL WORK This cribbed retaining wall, built with native sandstone, was one of numerous trail features constructed in order to implement sustainable trails on steep side slopes. Before - section of trail before cribbed retaining wall. After – same section of trail with cribbed retaining wall.

WILDERNESS TRAIL WORK The Blanchard Church Creek Crossing, a major trail feature, was relocated and constructed to mitigate resource damage and provide improved recreation opportunities. Before – Old crossing at Lusk Creek was deeply eroded, dangerous to use, and had potential to add sedimentation to Lusk Creek. Before – Old crossing at Lusk Creek was deeply eroded, dangerous to use, and had potential to add sedimentation to Lusk Creek. After – Newly reconstructed south embankment of Blanchard Church Creek Crossing.

WILDERNESS TRAIL WORK Turnpikes were installed to raise the trail tread above natural wet areas. Before – section of designated trail before installation of turnpike. After – same section of trail with turnpike.

WILDERNESS TRAIL WORK Once a trail was re-routed, the old section was brushed and signage was placed to inform users to use the new re-route. Brush was placed in the trail and gully plugs were installed as needed to prevent further erosion. Summer – section of braided, eroded non-designated trail. Fall – same section of trail after brushing and installing gully plugs.

WILDERNESS TRAIL WORK Approximately four miles of old non-designated trails were brushed in. Monitoring has shown that natural processes have reduced the impact on brushed in sections of trail. Summer – Brushed section of non- designated user created trail. Fall – users are staying off the brushed trails section.

TRAIL SIGN PLAN TRAIL SIGN PLAN A total of 223 new directional signs were installed throughout three wilderness areas and in non-wilderness.

NON-WILDERNESS TRAIL WORK Reconstructed nearly three miles of existing designated trail and constructed two miles of new trail. Before – Area of wet muddy trail before work was conducted. After – Same section with newly installed turnpike, built with mechanized equipment and the help of 15 volunteers from a local equestrian camp.

PUBLIC’S RESPOSE TO PROJECT “You guys are to be commended for the great work you have done for the trails” - Don Cloud (local equestrian and member of the Shawnee Chapter of the Backcountry Horsemen of America). “You guys are to be commended for the great work you have done for the trails” - Don Cloud (local equestrian and member of the Shawnee Chapter of the Backcountry Horsemen of America). “I really appreciate all the work the Forest Service has done” – Wally McCarthy (local hiker and instructor of Environmental Studies at John A. Logan College). “I really appreciate all the work the Forest Service has done” – Wally McCarthy (local hiker and instructor of Environmental Studies at John A. Logan College).

MEDIA COVERAGE Newspaper, television, and magazine coverage - informative and positive The Daily Register and The Vienna Times – covered implementation of project. The Daily Register and The Vienna Times – covered implementation of project. WSIL Channel 3 – top evening coverage of project. WSIL Channel 3 – top evening coverage of project. Best of America by Horseback – television documentary. Stated, SNF as “a must visit for trail riders everywhere”. Best of America by Horseback – television documentary. Stated, SNF as “a must visit for trail riders everywhere”. BACKPACKER Magazine – readers voted trails in Garden of the Gods as Illinois’ best day hike in February 2007 issue. BACKPACKER Magazine – readers voted trails in Garden of the Gods as Illinois’ best day hike in February 2007 issue.

WILDERNESS TRAIL WORK Fall – Fiscal Year 2007 The fall trail crew continues to construct re-routes in the Lusk Creek Wilderness. Fall trail crew installing a turnpike on a new re-route.

WILDERNESS TRAIL WORK Fiscal Year 2007 New re-routes will continue to replace non-designated trail sections. Nearly 5 miles of poorly located non-designated trail will be brushed in once re-routes are complete. This one mile section of old, eroded non-designated trail section is scheduled to be brushed in. This quarter mile of new re-route will connect two existing trails and eliminate the need for trail on the left.

FISCAL YEAR 2007 UNDER CURRENT FUNDING: DESIGNATED WILDERNESS AREAS (hand crews and pack stock) Construct 3 miles of new full-bench trail re-routes. Construct 3 miles of new full-bench trail re-routes. Use stock team to plow and grade ~ two of the three miles of new re-routes. Use stock team to plow and grade ~ two of the three miles of new re-routes. Use pack stock team to haul gravel for hardening ~ three miles of designated trail. Use pack stock team to haul gravel for hardening ~ three miles of designated trail. Construct two new creek crossings. Construct two new creek crossings. Brush in ~ 5 miles of old, non-designated trail. Brush in ~ 5 miles of old, non-designated trail. Install new directional signs. Install new directional signs. NON-WILDERNESS AREAS (mechanized equipment) Reconstruct and construct a total of 8 miles of trail. Reconstruct and construct a total of 8 miles of trail. Install new directional signs in project area. Install new directional signs in project area.

FISCAL YEAR 2007 UNDER CURRENT FUNDING: TRAIL MAINTENANCE (designated and non-wilderness areas) Conduct maintenance on 20 miles of existing designated trail. Conduct maintenance on 20 miles of existing designated trail. TRAIL MONITORING (designated and non-wilderness areas) Conduct trail monitoring activities on ~ 80 – 100 miles of trail. Conduct trail monitoring activities on ~ 80 – 100 miles of trail. Submit comprehensive Trail Monitoring Report to the Forest Supervisor. Submit comprehensive Trail Monitoring Report to the Forest Supervisor.