ComSoc Conference Portfolio Management Strategy Khaled B. Letaief (VP Conferences) Merrily Hartmann (Director Conference Operations) Heinrich Stüttgen.

Slides:



Advertisements
Similar presentations
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
Advertisements

1 (c) 2008 The McGraw Hill Companies Redesigning Teacher Salary Structures School Finance: A Policy Perspective, 4e Chapter 12.
Copyright McGraw-Hill/Irwin, 2002 Significance of Resource Pricing Marginal Productivity Theory of Resource Demand MRP as a Demand Schedule Determinants.
1 Information and Publicity in programming period.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
TCCC 2005 Miami, FL March 15, 2005.
IEEE CQR-TC Technical Committee Meeting Kenichi Mase and Hiromi Ueda Kenichi Mase and Hiromi Ueda May 19, 2005 ICC 2005, Seoul, Korea.
Technical Activities: Overview with An Invitation to Participate Curtis Siller Vice President – Technical Activities
AIAA Task Force on Earth Observations 2 October 2009 AIAA HQ Reston VA.
AIAA Aerospace Sciences Group TC Presentation Aerospace Sciences Conference, New Horizons Forum, and Aerospace Exposition Orlando, FL 4-7 January 2011.
11 Scaling Up World Bank Group Engagement with Civil Society: A Strategic Priorities Paper Civil Society Team EXTIA.
Welcome to ! Entrepreneurial Marketing. Session 1: Entrepreneurship and Marketing.
The Implementation Structure DG AGRI, October 2005
1 Flat-rates for indirect costs Ex-ante assessment by DG Employment, Social affairs and Equal Opportunities and DG Regional Policy Myrto Zorbala- DG Regional.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion Addressing challenges in a changing world: -The future Cohesion Policy- Wolfgang.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
International Telecommunication Union Committed to connecting the world 1 ITU-T Academia and the future Malcolm Johnson Director of the Telecommunication.
Civics: Government and Economics in Action
London Scrutiny Officers Network Meeting. Scrutiny Proposals in the Strengthening Local Democracy Consultation Helen Moores 16/09/2009.
Grants 3.0 Departmental Administrator Review January 22, 2014.
Chapter 7 Sampling and Sampling Distributions
Updates on alternative technologies and international developments in the Refrigeration and Air Conditioning Sectors.
The SCPS Professional Growth System
Management Plans: A Roadmap to Successful Implementation
Introduction AmeriCorps State & National 1 The following presentation will guide AmeriCorps State and National Program users through how to create Applicant-Determined.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Capacity Planning For Products and Services
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
1 Independent Evaluation in IFC Presentation to Staff of Islamic Development Bank May 3, 2009 Marvin Taylor-Dormond.
TF-CPR Compendium The results TNC 2014 – Elke Dierckens (Belnet) Bruges / Dublin – 19/05/2014.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Western Hemisphere Membership Development Strategy.
Z-HOPE  Zetas Helping Other People Excel Z-HOPE  Zetas Helping Other People Excel The National Service Program Soror Karen Gipson National Z-HOPE Director.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
REL Appalachia and the Virginia Middle School Research Alliance Justin Baer, Director, REL Appalachia Virginia School-University Partnership Steering Committee.
Jackie Taylor, President Tom Nash, President-Elect.
*This is an Example of Presentation Layout
Data, Now What? Skills for Analyzing and Interpreting Data
1 Society Relations -- A Briefing by the Region 1 Society Liaison Gene F. Hoffnagle August 18, 2006.
TCCN Reporting TCCN Awards & DySPAN 2010 Petri Mähönen (with apologies not being able to join you)
State Strategies Plan of Action PILLAR I Education & Professional Development.
By Saurabh Sardesai October 2014.
Spring 2009 Convention Inter - Chapter Luncheon Steps to Incorporation.
IEEE Power Electronics Society Long Range Planning Report Tom Habetler Chair, Long Range Planning Committee PELS Meeting Series – APEC 2013, Long Beach.
ACM Education Board December 10-11, Outline ACM in general TechPacks Education Policy.
Europe Middle East Africa (EMEA) Region- Activities to September2011  Young Professional Researcher Award  ComSoc Conferences in EMEA Region  Joint.
Membership Development Doug Zuckerman Vice President
THE ROLE OF STOP TB GHANA PARTNERSHIP Chief Austin A. Obiefuna National Coordinator SECRETARIAT CO-HOSTED BY AFRO GLOBAL ALLIANCE (GH) & GHANA SOCIETY.
The Roles and Responsibilities of Club President– A Effective Club Rotary Clubs  Sustain and/ or grow their membership base  Implement successful projects.
Lewis Terman Candidate for IEEE 2007 President-Elect Region 10 Meeting Chiang Mai, Thailand 26 March, 2006.
IEEE Communications Society Meetings & Conferences Department Chapter Support for Local Conferences & Workshops Chih-Lin I, Director of Meetings & Conferences.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
The LA Regional Chapter Chair’s Congress Trevor Clarkson VP-Membership Development IEEE Communications Society LA RCCC - Buenos Aires.
Technical Activities and Conferences J. Roberto B. de Marca IEEE Vice President – Technical Activities 25 July 2008, IEEE Panel of Conference Organizers.
TAC Strategic Advisory Group Status Report for TAC Tom Duerr, Deputy VP Technical Activities,
TRANSPORTATION RESEARCH BOARD WATER SCIENCE AND TECHNOLOGY BOARD TRANSPORTATION RESEARCH BOARD TRB’s Vision for Transportation Research.
On Regional Conferences, Incubators and small meetings/workshops Extending ComSoc Conference Portfolio OpCom 9/ Venice Heiner Stüttgen (Director.
Technical Activities and Membership Development: Achieving Synergy Doug Zuckerman Vice President – Membership Development
Accountability & Program Assessment Governing Board Online Training Module.
Professional Career Ladder System Guidelines Promotion Packet County Extension Agents District 2 Career Ladder Training April 29, 2016 Ronda Alexander.
The Transformation of Regional Activities to Member and Geographic Activities Strategic Overview August 2007 IEEE Member and Geographic Activities IEEE.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
ComSoc Conference Portfolio Management Strategy
TCLT Learning Technologies
Conference Business Process and Systems Project (PIF)
AESS Board of Governors Meeting
AESS Board of Governors Meeting
Policies, Procedures, and Best Practices IEEE AESS PANELS 2019 Prepared by the Technical Operations Committee Contents: Applying for Panel Approval Forming.
Presentation transcript:

ComSoc Conference Portfolio Management Strategy Khaled B. Letaief (VP Conferences) Merrily Hartmann (Director Conference Operations) Heinrich Stüttgen (Director Conference Development) Bruce Worthman (ComSoc Staff Director Conferences) IEEE Communications Society1

Objectives 1.Understand whether/how ComSoc Conferences serve our constituency and the scientific community in terms of: –Technical merit, quality, coverage of ComSocs field of interest –Membership development –Financial contribution - Today and tomorrow 2.Identify steps to improve the value of ComSocs conference portfolio –Find optimal rules and processes to improve the value proposition of ComSoc Conferences (per class) –Define a portfolio development strategy to incubate and Phase out, or Collaborate with other organizations according to a defined strategy 3.Provide means to communicate the conference development strategy to the technical community/TAC 2/13/2014IEEE Communications Society2

Outline IEEE Communications Society3 I.Explain the different categories of conferences and their main characteristics II.Coverage analysis of current portfolio (financially sponsored) events and conclusions KPI III.Explain the chosen KPI (Key Performance Indicator) structure IV.Summary

I. Conference Categories IEEE Communications Society4 Flag- ships Core Events Workshops Co-Sponsored Confs TCS Events + Incubators Regional Events

I. Conference Categories 1.Flagships –Large Attendance –Extensive Coverage of ComSoc Technical Scope –Many (if not all) TCs involved –Significant ComSoc Project Management –Co-located ComSoc Governance Meetings –International Audience –Surplus requirement >= 20% 2.Core –Significant event - targeting to achieve 200+ attendees –Medium to Significant ComSoc Project Management –Usually multiple tracks –May have specific TC involvement/support –Surplus requirement >= 20% –International based Targeted Audience –Long-term life cycle (proposed > 10 years) –Normally Annual –Covers subset (but not all) of ComSoc Technical Scope IEEE Communications Society5

I. Conference Categories 3.TC Workshops and TC driven (smaller) Confs –Event often driven by one TC (decision maker) (Steering Committee Charter often linked to TC Charter but involvement by other TCs possible) –Minimal ComSoc Project Management –Surplus requirement 10% (due to reduced overhead) –Typically < 100 attendees and 1 or 2 tracks Events 4.(Financially) Co-Sponsored Confs –Any size from small to very very big –Facilitates collaboration with other societies having fields of interest overlapping with ComSoc –Varying levels of ComSoc Project Management (depending on co-sponsor) –Always a sharing of the surplus with a 20% target –Managing Society may vary IEEE Communications Society6

I. Conference Categories 5.Regional –Extend ComSoc Reach –Conference always occurs in a Specific Region (Country) international –Conference titles derived from a flagship or core conference, must include the name of the region (country) in the conference title but may include "international e.g. IEEE Communications Conference in - following the ICC/GLOBECOM –Involvement of IEEE Sections and Chapters, TCs, and ComSoc sister society preferred –Objective is membership development (may co-locate RCCCs, governance meetings) –Main target is new members in that region - conference attendance expected to be greater than 50% from that region (country) –May Include new program elements to promote community building –Varying levels of ComSoc Project Management –Surplus requirement target may depend on strength of region, partnership model, project management needs – 10% (developing region), 20% (North America, Europe, Japan, Pacific) 6.Incubators –Start-ups" must be moved to other category after 2 completed events –Surplus requirement: 10% 7

I. Conference Categories ObjectiveAttendanceSurplus ReqRegion Flagship broadest technical coverage & quality surplus governance meetings > % typically 200K$ US and around the world Core technical coverage of sub-scope high quality surplus 100 < n < % Moving around the world Small Conf/TC WS technical community networking quality <= % Moving around the world Regional membership development > or 20% by region Fixed region Co-op collaborate rather than compete with other societies/organisations vary 20% Moving around the world Incubator extend technical scope of conf. portfolio20 < n < % Moving around the world TCS collaboration building relationships varyn.a. Moving around the world IEEE Communications Society8

II.ComSocs Technical Scope (Horizontal layered View) IEEE Communications Society Communication Theory Signal Processing Wireless/RadioOpticalPwLC Networking Network Management & Control Services and Applications Business Aspects

II. Vertical areas IEEE Communications Society Sensor NW - RFID - M2M/IoT Multimedia Security QoS, Reliability, Dependability Modelling and Simulation Comm.s SW Energy Efficieny & Smart Grids eHealth & other applications Vehicular Networks and ITS

II. Total Coverage IEEE Communications Society Communication Theory Signal Processing Wireless/RadioOpticalPwLC Networking Network Management & Control Services and Applications Business Aspects Sensor NW - RFID - M2M/IoT Multimedia Security QoS, Reliability, Dependability Modelling and Simulation Comm.s SW Energy Efficieny & Smart Grids eHealth & other applications Vehicular Networks and ITS

II. Geographic Scope – Regional Conferences IEEE Communications Society12 ATC-REV ICCC ANTS ?EU ? ?LA ? ?Afr ? ?Rus ? ?PA ? Today we dont have many regional conferences strategy or portfolio China Need strategy for large developing regions like China, India, LA

III. KPI Scheme Objectives of KPI (Key Performance Indicator) Scoring Understand the contribution and value of our conferences Hopefully hHelp conferences to identify opportunities for improvement Help to improve efficiency and value of conference in aspects like scope, financial, overhead/cost... Facilitate a strategy for creating, mergingco-locating, abandoning conferences, or moving them from portfolio to TCS Create conferences addressing current gaps in our portfolio Evaluating criteria Financial, attendance, technical area, quality, popularity Evaluating criteria: Financial, attendance, technical area, quality, popularity

III. Quality/Popularity Measures External quality figures (e.g., Australian Conference Ranking) – not necessarily reliable and very spotty – not used Quality ind. Acceptance ratio – largely available/hotly disputed as Quality ind. Xplore DownloadPopularity - Xplore Download Statistics as Popularity - Average # per paper downloads for 2006, 2007, 2008 (if available) For ABC 2006, add downloads for 07 and 08 and divide by total # ABC 2006 papers = x 1 For ABC 2007, add downloads for 08 and 09 and divide by total # ABC 2007 papers = x 2 For ABC 2008, add downloads for 09 and 10 and divide by total # ABC 2008 papers = x 3 (x 1 + x 2 + x3)/3 = KPI Popularity score IEEE Communications Society Quality Quality Acc. Ratio >75% % % %<25% Popularity Avg. #/Paper Downloads >60

III. Technical Scope Performance Indicator Premier/unique 3 : Premier/unique ComSoc conference in this area, incl. GC/ICC Leading 2 : Leading ComSoc conference in this area, excl./beyond ICC/GC largely overlaps with 1 other ComSoc conference 1 :Conference largely overlaps with 1 other ComSoc conference other than GC/ICC largely overlaps with up to 2 ComSoc conferences 0 :Conference largely overlaps with up to 2 ComSoc conferences, strong competition from other societies (IEEE CS, ACM, IFIP, etc) Heavily crowded area -1 : Heavily crowded area, Conference largely overlaps with multiple other ComSoc conferences IEEE Communications Society15

III. Attendee Satisfaction Based on suggestions from the ComSoc Board of Governors discussion we added Attendee Satisfaction The way to evaluate conferences regarding community satisfactions are the questionnaires recently introduced So far only a few conferences have delivered the past event evaluations – so this indicator shpould be added later when more data becomes available, at this time it will only distort the picture So far we have only a few results: –WCNC = 4.22, INFOCOM = 4.12, ICC = 4.09, DySpan = 4.26 GLOBECOM = 4.17, SmartGridComm = 4.05 –If all events score >4, we need to reconsider either the thresholds (how to assign scores) or modify/sharpen the questionnnaires Hence: Work in progress IEEE Communications Society16

III. KPIs IEEE Communications Society17 Key Performance Indicators Conference Scoring 0123 Financial (3 yr avg) Absolute Number (Revenue)0-40K40-80K80-120K120K-200K>200K Profit (absolute)loss0< X < 2020<X5050<X<100>100 K$ Profit (%)loss0<X<1010<X<2020<X<25>25% Attendance Absolute Number >200 3 Yr Trend (2 last periods)>-20% % % %>+20% Technical Scope Unique vs Clusteredcrowdedoverlappingone of twoleadingunique Quality/Popularity (Average of last 2 to 3 years) Acceptance Ratio>75% % % %< 25% Xplore Downloads per paper0 – 1516 – 3031 – 4546 – Attendee Satisfaction<2234>4

Summary In 2011 ComSoc adopted a portfolio-based management strategy for its financially sponsored conferences This slide set tries to explain –the approach chosen for evaluating the value of individual conferences –the terminology used in the process The method evaluates ComSoc conferences from many different aspects, e.g. quality, attendance, financial perfomance, etc The conference portfolio management is a tool to identify gaps, rising stars and conferences with improvement opportunities in our conference portfolio –There is no threshold defined stating that a conference needs to achieve a given minimal score –Scores help to identify strengths and weaknesses of a given conference to help organizers/steering committees identify improvement opportunities Details of the conference scores are available to the respective steering committees IEEE Communications Society18