64th IETF Vancouver November 2005 CCAMP Working Group Online Agenda and Slides at:

Slides:



Advertisements
Similar presentations
CCAMP WG, IETF 80th, Prague, Czech Republic draft-gonzalezdedios-subwavelength-framework-00 Framework for GMPLS and path computation support of sub-wavelength.
Advertisements

RSVP-TE Extensions for SRLG Configuration of FA
Information model for G.709 Optical Transport Network (OTN) draft-bccg-ccamp-otn-g709-info-model-03 CCAMP WG, IETF 79 th Beijing.
78th IETF CCAMP WG1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
76th IETF Hiroshima, November CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
G : DCM Signaling Mechanism Using GMPLS RSVP-TE ITU-T Workshop on IP-Optical, Chitose, Japan 7/11/2002 Dimitrios Pendarakis, Tellium, Inc. ITU-T.
Optical Control Plane Activities in IETF and OIF L. Ong 9 July 2002 L. Ong 9 July 2002
Generalized Multiprotocol Label Switching: An Overview of Signaling Enhancements and Recovery Techniques IEEE Communications Magazine July 2001.
OSPF WG - IETF 66 OSPF Protocol Evolution WG Re-Charter Acee Lindem/Cisco Systems.
MPLS/GMPLS Migration and Interworking CCAMP, IETF 64 Kohei Shiomoto,
Requirement and protocol for WSON and non-WSON interoperability CCAMP WG, IETF 81th, Quebec City, Canada draft-shimazaki-ccamp-wson-interoperability-00.
CCAMP Working Group Milestone Discussion IETF 84 84th IETF CCAMP Working Group 1.
Abstraction and Control of Transport Networks (ACTN) BoF
ITU-T Study Group 13 Communications to IETF CCAMP Working Group Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP
IETF68 CCAMP1 GMPLS Control of Ethernet Forwarding Don Fedyk Loa Andersson
69th IETF Chicago, July 2007 CCAMP Working Group Charter and Liaisons.
Should I Migrate My MPLS-TE Network to GMPLS. And if so, how
Page th IETF Vancouver, B.C., Canada Operating Virtual Concatenation (VCAT) and the Link Capacity Adjustment Scheme (LCAS) with GMPLS Greg Bernstein.
UNI Extensions for Diversity and Latency Support 13-Mar-13IETF 86 Orlando1 Don Dieter.
CCAMP Working Group 60th IETF San Diego. Agenda (1 of 3) Group Admin (Chairs) –Blue sheets, Minute takers, Admin, WG secretary, Agenda bash (5 mins) –Status.
CCAMP Working Group Agenda and slides at 59th IETF Seoul.
Sub-ip - 1 Blurring the Lines Between Circuits and Protocols: Plans to Re-Organize Sub-IP Technologies in the IETF Scott Bradner Harvard University.
OIF NNI: The Roadmap to Non- Disruptive Control Plane Interoperability Dimitrios Pendarakis
A PRESENTATION “SEMINAR REPORT” ON “ GENERALIZED MULTIPROTOCOL LABEL SWITCHING“
CCAMP WG, IETF 81th, Quebec City, Canada draft-zhang-ccamp-gmpls-evolving-g txt Authors & Contributors GMPLS Signaling Extensions for the Evolving.
ITU/OIF Liaison Report Lyndon Ong Ciena March 24, 2006.
1 IETF-61 – Washington DC Path Computation Element (PCE) BOF-2 Status - CCAMP Co-chairs: JP Vasseur/Adrian Farrel ADs: Alex Zinin/Bill Fenner.
Contribution Number: oif Working Group: Architecture & Signaling Title: Project proposal for interworking of G RFC 3473 network domains.
WG Document Status 192nd IETF TEAS Working Group.
67th IETF San Diego November 2006 Requirement for Inter-Domain LSP Recovery Wataru Imajuku: Tomohiro.
62nd IETF Minneapolis March 2005 CCAMP Working Group Online Agenda and Slides at:
PCE Traffic Engineering Database Requirements draft-dugeon-pce-ted-reqs-01.txt O. Dugeon, J. Meuric (France Telecom / Orange) R. Douville (Alcatel-Lucent)
1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard Secretary: Dan King 80th IETF CCAMP WG.
Framework for G.709 Optical Transport Network (OTN) draft-ietf-ccamp-gmpls-g709-framework-05 CCAMP WG, IETF 82 nd Taipei.
CCAMP WG, IETF 80th, Prague, Czech Republic draft-ietf-ccamp-gmpls-g709-framework-04.txt Framework for GMPLS and PCE Control of G.709 Optical Transport.
IETF-70th Vancouver1 Extensions to GMPLS RSVP-TE for Bidirectional Lightpath with the Same Wavelength draft-xu-rsvpte-bidir-wave-01 Sugang Xu, Hiroaki.
1 Requirements for GMPLS-based multi-region and multi-layer networks (MRN/MLN) draft-ietf-ccamp-gmpls-mln-reqs-01.txt CCAMP WG, IETF 66 Jul. 10, 2006 Kohei.
June 4, 2003Carleton University & EIONGMPLS - 1 GMPLS Generalized Multiprotocol Label Switching Vijay Mahendran Sumita Ponnuchamy Christy Gnanapragasam.
(Slide set by Norvald Stol/Steinar Bjørnstad
IETF-74, San Francisco, March 2009 PCE Working Group Meeting IETF-74, March 2009, San Francisco Online Agenda and Slides at:
Dissuasion, Working Group Scope and Deliverables Lou Berger Pat Thaler
1 Ping and Traceroute for GMPLS LSPs in Non-Packet Switched Networks draft-ali-ccamp-gmpls-lsp-ping-traceroute-01.txt Zafar Ali, Roberto Cassata (Cisco.
PWE3 WG Status IETF-87 Andy Malis Matthew Bocci
GMPLS for Ethernet A Framework for Generalized MPLS (GMPLS) Ethernet draft-papadimitriou-ccamp- gmpls-ethernet-framework-00.txt.
Optical Control Plane Standardization - OIF / IETF / ITU Lyndon Ong, Director, Network Control Architecture Ciena Corporation
1 BGP Traffic Engineering Attribute draft-fedyk-bgp-te-attribute-03.txt Yakov Rekhter, Don Fedyk, Hamid Ould-Brahim IETF 70 th, Vancouver Meeting, CCAMP,
79th IETF CCAMP WG1 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
67th IETF San Diego, November 2006 CCAMP Working Group Online Agenda and Slides at: Charter page:
ITU-T Study Group 15 Communications to IETF CCAMP Working Group Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP
67th IETF San Diego November 2006 Agenda and WG Status On-line Agenda and Slides at:
67th IETF meeting, Nov Traffic Engineering Database Management Information Base in support of GMPLS Traffic Engineering Database Management Information.
70th IETF Vancouver, December 2007 CCAMP Working Group Status Chairs: Deborah Brungard : Adrian Farrel :
Limit for content Do not exceed Limit for content Do not exceed Limit for content Do not exceed Limit for content Do not exceed Page 1 © The.
66th IETF, Montreal, July 2006 PCE Working Group Meeting IETF-66, July 2006, Montreal A Backward Recursive PCE-based Computation (BRPC) procedure to compute.
68th IETF Prague March 2007 Agenda and WG Status On-line Agenda and Slides at:
63rd IETF Paris August 2005 CCAMP Working Group Online Agenda and Slides at:
66th IETF meeting, July 2006 Extensions to the OSPF Management Information Base in support of GMPLS Extensions to the OSPF Management Information Base.
The Application of the Path Computation Element Architecture to the Determination of a Sequence of Domains in MPLS & GMPLS draft-king-pce-hierarchy-fwk-01.txt.
61st IETF Washington DC, Nov GMPLS Inter-domain Traffic Engineering Requirements GMPLS Inter-domain Traffic Engineering Requirements draft-otani-ccamp-interas-gmpls-te-01.txt.
177th IETF Anaheim, March 2010 CCAMP Working Group Status Chairs: Lou Berger Deborah Brungard.
Source Packet Routing in Networking WG (spring) IETF 89 – London Chairs: John Scudder Alvaro Retana
70th IETF Vancouver, December 2007 CCAMP Working Group Online Agenda and Slides at: Charter page:
An evolutionary approach to G-MPLS ensuring a smooth migration of legacy networks Ben Martens Alcatel USA.
CCAMP Working Group Status
Tomohiro Otani Kenji Kumaki Satoru Okamoto Wataru Imajuku
L1VPN Working Group Scope
ITU-T Study Group 15 Update to IETF CCAMP
OSPF Extensions for ASON Routing draft-ietf-ccamp-gmpls-ason-routing-ospf-03.txt IETF67 - Prague - Mar’07 Dimitri.
Path Computation Element WG Status
Presentation transcript:

64th IETF Vancouver November 2005 CCAMP Working Group Online Agenda and Slides at:

64th IETF Vancouver November 2005 Agenda (1 of 3) Administrivia (chairs, 5) WG status, RFCs, drafts, charter (chairs, 10) Liaison from ITU-T (Lyndon, 10) RFC 3946 bis (Adrian, 5) - feedback from OIF - get closure on this trivial point - next steps - make I-D a WG draft and last call it Addressing Draft (Kohei, 10) - identify new material - raise open issues - will we see more issues or are we done? - discussion of how this document should be focussed Hierarchy bis - Signaled FAs (Arthi, 15) - what is the problem with the hierarchy draft? - is this a problem we need to solve? - do we need dynamic, numbered, bidirecitonal LSPs? - are there other associated problems (e.g. dynamic bundling) - do we need to solve those problems? - why not use LMP? - why discuss here and not in MPLS? ASON Call signaling (Adrian, 5) - plans to split the draft - how/why have we changed call signaling?

64th IETF Vancouver November 2005 Agenda (2 of 3) ASON Routing solution (Dimitri, 10) - discussion of proposed solutions Inter-domain issues (Dimitri and Tomohiro, 10) - discussion of issues with inter-domain GMPLS a. requirements for advertising inter-domain TE links b. IP vs TE Reachability - compare with draft-ietf-ccamp-inter-domain-pd-path-comp - consideration of TE reachability exchange - need to also exchange switching capability information - need to also exchange termination capabilities c. implications for aggregation d. how does this stack up against PCE? MPLS/GMPLS Migration and Interworking (Kohei, 15) - what are we trying to achieve? - what are the models available? - do we want to support all of these models? Lambda labels (Richard, 10) - scope of the problem - why current generalized labels are not sufficient - is this a problem we want/need to solve? - discussion of potential solutions VCAT/LCAS (Richard, 10) - overview of VCAT and LCAS - how does this relate to GMPLS? - what signaling problems arise? - is this a problem we want/need to solve? - discussion of potential solutions

64th IETF Vancouver November 2005 Agenda (3 of 3) MS-SPRing (Adrian for Diego, 10) - overview of MS-SPRing - how does this relate to GMPLS? - what signaling problems arise? - is this a problem we want/need to solve? - discussion of potential solutions Management plane / Control plane exchange of LSPs (Adrian for Diego, 5) - what is the problem? - is CCAMP interested in a solution? - discussion of potential solutions Graceful Shutdown in GMPLS Traffic Engineering Networks (Zafar, 10) - what is the function? - is CCAMP interested in the function? - discussion of potential solutions Control Plane Resiliency Issues (Young Kim, 10) - what components of resiliency and robustness are involved? - for each of the components: - what problems are we trying to solve and in what timescale? - why can't we use existing tools for these problems?

64th IETF Vancouver November 2005 Document Status – New RFCs MPLS Working Group –RFC 4201: Link Bundling in MPLS Traffic Engineering (TE) –RFC 4206: Label Switched Paths (LSP) Hierarchy with Generalized Multi- Protocol Label Switching (GMPLS) Traffic Engineering (TE) CCAMP –RFC 4202 Routing Extensions in Support of Generalized Multi-Protocol Label Switching (GMPLS) –RFC 4203 OSPF Extensions in Support of Generalized Multi-Protocol Label Switching (GMPLS) –RFC 4204 Link Management Protocol (LMP) –RFC 4207 Synchronous Optical Network (SONET)/Synchronous Digital Hierarchy (SDH) Encoding for Link Management Protocol (LMP) Test Messages –RFC 4208 Generalized Multiprotocol Label Switching (GMPLS) User-Network Interface (UNI): Resource ReserVation Protocol - Traffic Engineering (RSVP-TE) Support for the Overlay Model –RFC 4209 Link Management Protocol (LMP) for Dense Wavelength Division Multiplexing (DWDM) Optical Line Systems IS-IS Working Group –RFC 4205 Intermediate System to Intermediate System (IS-IS) Extensions in Support of Generalized Multi-Protocol Label Switching (GMPLS)

64th IETF Vancouver November 2005 Document Status – Beyond the Working Group Eight drafts in RFC Editor’s Queue –Decrease of five since last time –None is blocked by a reference –Editor process now going well Several I-Ds in authors’ 48-hours Nine drafts with AD for review –Increase of one since last time Three drafts being updated after MIB Dr.

64th IETF Vancouver November 2005 Draft Status – Still with the Working Group One draft updated after WG last call, not yet published –ASON Routing Evaluation Six active Working Group draft remain –GMPLS Addressing (agenda slot) –GMPLS ASON Lexicography Pending response from ITU-T before WG last call –LSP Stitching New revision. Needs to stabilize, but now “ready” –Inter-domain RSVP-TE New revision. Needs to stabilize, but now “ready” –Per-domain Path Computation New revision. Needs to stabilize, but now “ready” –ASON Signaling (agenda slot)

64th IETF Vancouver November 2005 Charter! All milestones complete –Submitted revised charter and milestones to IESG on October 25 th –“Approved” by IESG October 27 th –Ready to roll? –Awaiting formal publication of revised charter

64th IETF Vancouver November 2005 Charter – Concerns Raised in Review AD raised the following concerns –Too many milestones Too much micro-management Too many drafts –Too many drafts going to working group last call in the same months Need to pace our work and spread it out Result is a lighter list of milestones

64th IETF Vancouver November 2005 New charter text (1 of 2) The CCAMP working group coordinates the work within the IETF defining a common control plane and a separate common measurement plane for physical path and core tunneling technologies of Internet and telecom service providers (ISPs and SPs), e.g. O-O and O-E-O optical switches, ATM and Frame Relay switches, MPLS, GRE, in cooperation with the MPLS WG. In this context, measurement refers to the acquisition and distribution of attributes relevant to the setting up of tunnels and paths. CCAMP WG work scope includes: –Definition of protocol-independent metrics and parameters (measurement attributes) for describing links and paths that are required for routing and signaling. These will be developed in conjunction with requests and requirements from other WGs (e.g. TEWG) to iensure overall usefulness. –Definition of protocol(s) and extensions to them required for link and path attribute measurement. Link Management Protocol (LMP) is included here. –Functional specification of extensions for routing (OSPF, ISIS) and signalling (RSVP-TE) required for path establishment. Protocol formats and procedures that embody these extensions will be done jointly with the WGs supervising those protocols. –Definition of the mechanisms required to determine the route and properties of an established path (tunnel tracing). –Definition of MIB modules and other OAM techniques relevant to the protocols and extensions specified within the WG.

64th IETF Vancouver November 2005 New charter text (2 of 2) CCAMP WG currently works on the following tasks: –Define how the properties of network resources gathered by a measurement protocol can be distributed in existing routing protocols, such as OSPF and IS- IS. CCAMP defines the generic description of the properties and how they are distributed in OSPF. The specifics of distribution within IS-IS are being addressed in the ISIS WG. –Define signaling and routing mechanisms to make possible the creation of paths that span multiple IGP areas, multiple ASes, and multiple providers, including techniques for crankback. –Define signaling and routing mechanisms and extensions to allow path and tunnel setup and maintenance across multiple domains, where a domain may be an IGP area, an Autonomous System, or any other region of topological visibility. To this end, work cooperatively with the PCE and MPLS WGs. –Identify issues in GMPLS interoperation among various implementations, including those related to addressing, path computation and constraints. Document clarifications of the current specifications. –Analyze the requirements and architecture for GMPLS multi-layer networks where a layer may be a technology layer or may indicate a client/server network relationship. Develop routing and signaling protocol extensions as necessary to satisfy the requirements. To this end, work cooperatively with the PCE WG. –Define abstract link and path properties needed for link and path protection. Specify signalling mechanisms for path protection, diverse routing and fast path restoration. Ensure that multi-layer path protection and restoration functions are achievable using the defined signalling, routing, and measurement protocols, either separately or in combination. –Identify which requirements for signaling and routing for ASON are not currently met by protocols defined in CCAMP; based on these, define mechanisms to address these requirements. –Define a protocol that can determine the actual route and other properties of paths set up by CCAMP signaling protocols, as well as other types of tunnels (tunnel tracing). –Document issues and strategies for the migration of MPLS-based deployments to GMPLS. Based on the outcome, identify protocol machinery that implementations may have to change to ease the migration from MPLS to GMPLS. In doing this work, the WG will work closely with at least the following other WGs: TEWG, MPLS, ISIS, OSPF, IDR, L1VPN and PCE. The WG will also cooperate with the ITU-T.

64th IETF Vancouver November 2005 Oct 05 First version WG I-D for Advertising TE Node Capabilities in ISIS and OSPF Oct 05 First version WG I-D for Automatic discovery of MPLS-TE mesh membership Nov 05 Submit ASON Routing evaluation I-D for IESG review Nov 05 Cross-WG review of I-D for Advertising TE Node Capabilities in ISIS and OSPF Nov 05 First version WG I-D MPLS to GMPLS migration strategies Dec 05 Submit RSVP-TE extensions for inter-domain signaling I-D for IESG review Dec 05 Submit Per-domain path computation signaling I-D for IESG review Dec 05 First version of WG I-D for ASON Routing solutions Dec 05 First version WG I-D Requirements for Multi-Layer and Multi-Region Networks Dec 05 First version WG I-D for Evaluation of existing protocols for MLN/MRN Jan 06 Submit GMPLS signaling in support of Call Management I-D for IESG review Jan 06 Submit I-D for Advertising TE Node Capabilities in ISIS and OSPF for IESG review Jan 06 First version WG I-D for Protocol solutions for MLN/MRN Jan 06 First version of WG I-D for OSPF-TE/GMPLS MIB module Jan 06 First version WG Informational I-D for Analysis of inter-domain issues for disjoint and protected paths Feb 06 Submit GMPLS/ASON lexicography I-D for IESG review Feb 06 Submit LSP Stitching I-D for IESG review Feb 06 First version WG I-D MPLS-GMPLS interworking requirements and solutions Mar 06 Submit I-D for Automatic discovery of MPLS-TE mesh membership for IESG review Mar 06 First version WG I-D GMPLS OAM Requirements Apr 06 Submit GMPLS routing and signaling interoperability advice I-D for IESG review Apr 06 First version of WG I-D for additional MIB module to cover RSVP-TE signaling extensions Jun 06 Submit Informational I-D for Analysis of inter-domain issues for disjoint and protected paths for IESG review Oct 06 Submit MPLS to GMPLS migration strategies I-D for IESG review Nov 06 Submit ASON Routing solutions I-D for IESG review Dec 06 Submit Requirements for Multi-Layer and Multi-Region Networks I-D for IESG review Jan 07 Submit MPLS-GMPLS interworking requirements and solutions I-D for IESG review Feb 07 Submit Evaluation of existing protocols for MLN/MRN for IESG review Mar 07 Submit OSPF-TE/GMPLS MIB module for MIB doctor and IESG review Jun 07 Submit GMPLS OAM Requirements I-D for IESG review Aug 07 Submit Protocol solutions for MLN/MRN I-D for IESG review Dec 07 Submit MIB module for RSVP-TE signaling extensions for MIB doctor and IESG review Dec 07 Recharter or close Working Group