1 Power Blackout of 2003: Lessons Learned Verizon Technical Support Services-Power Systems Charlie Romano-Director 212-695-9231

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
Demand Response May 9, United States 40 Million People 8 States Canada 10 Million People 7 Provinces Cost $6.0 to 10.0 Billion.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
R&D 1 Demand Response and Pricing in France EDFs experience New regulation Main goals 10/11 th April 2007.
December 1, 2003 Bill Parks Office of Electric Transmission and Distribution U.S. Department of Energy Presentation to the Federal Energy Regulatory Commission.
Energy Using Products Directive Mark Shayler. Why? ? Rising level of electrical waste Shift in legislation Waste disposal and clean-up costs Resource.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Safety on Campus Roy Schifilliti
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Diesel Generator Reliability: Lessons Learned from Storms
HARK SYSTEMS Remote Site Security & Monitoring. HARK HISTORY  Manufacturer of communications equipment  Founded in 1982  Developed the first interface.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
LAKELAND ELECTRIC Pricing to Meet Net Meter Rules APPA 2009 Business & Finance Conference Sept 14, 2009 Jeff Sprague Manager Pricing & Rates.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
Review of Power Blackout on Telecom P. J
1 Blackout 2003 See:
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Continuity of Operations Planning COOP Overview for Leadership (Date)
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
1 Market Launch Presentation. 2 Media Security and Reliability Council
REMOTE SITE MANAGEMENT SOLUTION. AGENDA 2  About KoçSistem  Current Situation in Base Stations  Remote Site Management System: Sitelink  Sitelink.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Distributed Energy: What Lies Ahead? PILLSBURY WINTHROP LLP 2004 GLOBAL ENERGY CONFERENCE SAN ANTONIO, TEXAS JUNE 12, 2004 ROBERT W. GEE PRESIDENT GEE.
Power Outages and Emergency Communications November 13, 2012.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
United States Grid Security and Reliability Control in High Load Conditions Christopher Lanclos—Mississippi Valley State University Research Alliance in.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
National Communications System Briefing Template Hurricane Isabel: Government-Industry Partnership in Planning, Response and recovery CAPT J. Katharine.
PowerSouth Lowman AC/DC Essential Voltage System.
California Public Utilities Commission Verizon Wireless Back-up Systems.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
1 Hurricane Recovery Experience John Quigley Director Network Integrity Network Operations November 18, 2004.
EE4503 Electrical Systems Design
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
EECP External Communications ERCOT Governmental Relations & Communications COPS June 27, 2006.
CUBA ELECTRIC INDUSTRY
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Alternative Energy House Mr. Gillespie’s Version.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
Logo Here 1 This slide deck has been designed for the Rhode Island Department of Health as apart of the Senior Resiliency Project. The intent of this training.
YOU’VE GOT THE POWER!. When the grid goes down, which type of system do you want for emergency power: battery or generator? Either type will get the job.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
Business Contingency Planning
Cold Snap Task Force Update
Impacts and Actions Resulting from the August 14, 2003 Blackout
Presentation transcript:

1 Power Blackout of 2003: Lessons Learned Verizon Technical Support Services-Power Systems Charlie Romano-Director

2 Power Blackout of 2003 What were the root causes of the August 2003 power blackout event? According to most published reports, two primary items led to the blackout: First Energys Lack of situational awareness and First Energys Ineffective vegetation management.

3 Power Blackout of 2003 According to the North American Electric Reliability Council report of 2/10/04: The power utility (FE) started the day with insufficient power generating resources A single 345-kV transmission line was lost due to ineffective tree management in the utilitys ROW Proper actions were not taken by FE to notify others that an emergency situation was imminent Alarms were either not received, due to computer problems, or misinterpreted, due to lack of operator training.

4 Power Blackout of 2003 The Bad News Verizon lost 5 switches in 2 high-profile Central Offices in Manhattan (West 50 th St. and East 56 th St.) due to standby generator failures The high ambient temperature and humidity conditions resulted in decreased output from the turbine-driven generators; there were fuel system issues with 2 of the diesel generators These events affected 276,000 customers.

5 Power Blackout of 2003 The Good News Most standby generators started, transferred, and assumed the critical office loads, as designed The blackout event started in the afternoon, and Verizon technical support personnel were immediately available to provide on-site assistance.

6 Blackout 2003-Verizons Perspective Experienced and trained power personnel are your most valuable assets during a power emergency! Building blackout testing MUST be performed every 2 years, during extreme summer and winter temperature conditions, regardless of the tenants Single-line electrical drawings must be kept up-to- date Accurate alarm reporting, and effective communications (dedicated technical conference bridges and cell phones) are critical components of rapid restoration and recovery efforts.

7 Power Blackout of 2003 The building blackout test is designed to ensure that: All necessary building ac loads are on the generators standby bus The generator is properly sized for the building The generators life support systems (fuel pumps, oil cooler pumps, water pumps, start battery charger, etc.) are powered from the generator they are serving These parameters are measured during periods of peak demand, and/or worst ambient environmental conditions Critical office facilities and communications systems are powered from the generator The office emergency lighting system is working properly.

8 Thank you….can I answer any questions?