1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Transition to Operations Erik D. Johnson, Deputy ALD for Programs Science Advisory Committee April 4, 2011.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Integrated Facility Management (IFM) For NSLS-II October 6, 2010 Chris Johnson Facility Complex Manager Facilities and Operations.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
DOIT Small Agency Shared Services Startup May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Beamline Development and Facility Usage.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Accelerator Readiness Review October 31, 2006
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
LINAC OPS Budget Review
ESS Project Status Roland Garoby – Technical Director August 2018.
Linac Coherent Light Source Transition to Operations 11 July 2007
DOE Review of the LCLS Project October 2006
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Photon Science Directorate Interim Operations During Construction Operations After Start of Science Program Related NSLS-II/Photon Science Facility Requirements

3 BROOKHAVEN SCIENCE ASSOCIATES Photon Science Directorate Established October 1 to enable planning for transition to operations and integration of workforce to adapt to project and operational needs Conventional facilities is now Facilities Division For now, no change in CF/facilities organization but… Need to determine what changes to Facilities organization are needed to support evolving NSLS-II and Photon Sciences Directorate requirements NSLS-II transition to operations – interim operations during const. NSLS-II operations – after construction & start of science program Other Photon Science Facility Requirements

4 BROOKHAVEN SCIENCE ASSOCIATES Currently no change from design & construction focused CF Organization Developing model to support future operational requirements

5 BROOKHAVEN SCIENCE ASSOCIATES Interim Operations Operational requirements start February 2011 Requirements increase with each successive beneficial occupancy Must be coordinated with ASD & XFD equipment operations Provides good initial training for program operations Phase Milestone Baseline 1 Pentant 1- BO 1-Feb-11 2 Pentant 5 - BO 9-Feb-12 3 RF Building - BO 23-Mar-11 4 Pentant 2 - BO 2-Jun-11 5 Pentant 3 - BO 27-Sep-11 6 Injection Building - BO 18-May-11 7 Pentant 4 - BO 28-Nov-11 8 Ring Bldg Const. Complete 30-Apr-12

6 BROOKHAVEN SCIENCE ASSOCIATES Interim Operations Planning CF prerequisites to support interim operations Implement effective QA program during construction of facilities Document proper commissioning of systems Maintain configuration control and accurate as-built documents Assure all O&M documentation is received and accurate Integrate O&M staff in start-up, commissioning & training Assign clear responsibilities for maintenance and operation of systems and equipment and verify maintenance is being performed Jointly establish the operating profile and performance parameters for interim operations with ASD & XFD CF Systems O&M responsibilities list established L ists all CF installed systems, group responsible for operational control, maintenance and criticality

7 BROOKHAVEN SCIENCE ASSOCIATES Science Program Operations Operations are ~3+ years off, but CF staff will be required to support operational elements Engineering and operating guidance as CF utility systems and services are placed under load and variable conditions Maintenance, modification and optimization of utility systems - particularly, HVAC, power and water systems Interface and oversight of IFM and F&O ops & maintenance of various systems and facilities Installation of new beamlines & User facilities –Structural and utilities/services capacity issues Modification of related facilities as operations and staffing levels ramp up

8 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II/Photon Science Facilities Upcoming design/construction requirements Building 725 Alternative Use Study –Evaluate capability of reuse to support office/lab & computing needs of NSLS-II –Study underway and preliminary report due October 31 –After, need definitive project plans for balance of staff, lab & computing space LOB Build-out Construction –Oversight of LOB 4 and 5 shell and 2, 4, & 5 interior fit-out Remote End Stations / Long Beamlines –HXN now part of baseline scope but other long beamlines expected soon Planning for D&D of B725 accelerator in Joint Photon Science Institute – JPSI –Balance of funds from NY state unlikely, alternative sources being considered

9 BROOKHAVEN SCIENCE ASSOCIATES B725 Alternative Use Study Major CF activity will be planning for future use of Building 725, the existing NSLS NSLS-II management, admin, engineering and scientific staff will occupy B725 – a large fraction of projected ~600 total NSLS-II staff Current building occupancy is just ~160 LOBs can accommodate 150 – 375 depending on # built/fitted-out Permanent NSLS-II control room to be in B725 Existing NSLS accelerator (UV and VUV Rings) will have to be D&D’d Need to plan for future conversion of this space into usable space for: –Technical support areas, labs and/or computing space –Possible conference or auditorium space –Must be integrated to meet total staff space requirements

10 BROOKHAVEN SCIENCE ASSOCIATES Lab Office Scenario – One Option

11 BROOKHAVEN SCIENCE ASSOCIATES Conclusions Creation of Photon Science Organization and Facility Division has paved way for planning the optimal organization to meet upcoming needs –CFAC experience and guidance in these areas would be valuable Time for readiness for interim operations < four months away –Working closely with F&O, IFM team and ASD/ XFD to be ready Out-year facility requirements to support NSLS-II and Photon Science Directorate are becoming more clear –Facility planning is now underway