Economic Order Quantity

Slides:



Advertisements
Similar presentations
Inventory Modeling Concepts
Advertisements

Chapter 12 Inventory Management. Reasons to Hold Inventory Meet unexpected demand Smooth seasonal or cyclical demand Meet variations in customer demand.
Inventory Control Chapter 17 2.
Chapter 17 Inventory Control 2.
DOM 511 Inventory Control 2.
3/7: Inventory Planning & Control
Chapter 13 - Inventory Management
12 Inventory Management.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 6-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 6 Inventory.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
CDAE Class 24 Nov. 28 Last class: 4. Queuing analysis and applications 5. Inventory analysis and applications Today: Results of problem set 4 and.
© 2003 Anita Lee-Post Inventory management Part 2 By Anita Lee-Post.
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Operations Management
Chapter 11, Part A Inventory Models: Deterministic Demand
Dr. Mohamed A. Hamada Lecturer of Accounting Information Systems 1-1 PRACTICAL CASES ON CH 6 Inventory Management.
Inventory Control Models
FOR INDEPENDENT DEMAND
Inventory Control Inventory: A stock of materials kept for future sale or use.
1 Material Management Class Note # 3-A ( In review ) ~ Inventory control, analysis, and management ~ Prof. Yuan-Shyi Peter Chiu Feb
Operations Management Inventory Management Chapter 12 - Part 2
Chapter 13 Working Capital Management  Short-term Cash Flow Planning  Managing Accounts Receivable  Credit Terms, Float, and Cash Management  Inventory.
1 Operations Management Inventory Management. 2 The Functions of Inventory To have a stock of goods that will provide a “selection” for customers To take.
Management Accounting for Business
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12 Continued.
EOQ Model Cost Curves Q* D 2 D Co EOQ, Q* = Ch
___________________________________________________________________________ Quantitative Methods of Management  Jan Fábry Deterministic Inventory Models.
___________________________________________________________________________ Operations Research  Jan Fábry Deterministic Inventory Models.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Inventory Inventory is the stock of goods, commodities or other economic resources that are stored for the smooth and efficient running of a business.
Inventory Stock of items held to meet future demand
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 Chapter 6 –Inventory Management Policies Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
CDAE Class 26 Dec. 5 Last class: 5. Inventory analysis and applications Today: Problem set 5 5. Inventory analysis and applications Quiz 7 Class.
INVENTORY MANAGEMENT.
Copyright 2013 John Wiley & Sons, Inc. Chapter 7: Supplement B The Economic Order Quantity.
1 Inventory Control Operations Management For Competitive Advantage, 10 th edition C HASE, J ACOBS & A QUILANO Tenth edition Chapter 14.
CDAE Class 23 Nov. 15 Last class: Result of Problem set 3 4. Queuing analysis and applications Group project 3 5. Inventory decisions Quiz 5 (sections.
UML Ops Analysis Don Sutton. Functions of Inventory Decoupling Storing resources Irregular supply and demand Quantity discounts Avoiding stock.
 1. PURCHASE COST.  2. CAPITAL COST.  3. ORDERING COST.  4. INVENTORY CARRING COST.  5. SHORTAGE COST.
Costs involved in Inventory Models Ordering (Setup) cost Unit purchasing (Production) cost Holding (Carrying) cost Shortage (Penalty) cost Revenue (Selling.
Chapter 12 – Independent Demand Inventory Management Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
OMSAN LOJİSTİK.
© The McGraw-Hill Companies, Inc., Inventory Control.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Inventory Management.
EOQ for production lots EOQ with quantity discount Safety Stock Periodic review system ----
CDAE Class 23 Nov. 14 Last class: Result of Quiz 6 4. Queuing analysis and applications Project 3 Today: 4. Queuing analysis and applications Problem.
Chapter 17 Inventory Control
Inventory Management for Independent Demand Chapter 12, Part 1.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
REORDER QUANTITY METHODS AND EOQ
PENGENDALIAN PERSEDIAAN (Bagian 2)
Material Lectur-9 Main Ahmed Farhan (ACA). Inventory Control System 1. Order level. 2. Maximum stock level. 3. Minimum stock level. 4. Danger level.
Chapter 6 Inventory Control Models 6-1
Inventory Stock of items held to meet future demand
Example ( In terms of Percentage)
How much to purchase? How much to produce?
BUSI 104 Operations Management
Operations Research Lecture 14.
Module 2: Supply Chain & Logistics Management
EOQ Model 2/26/2016.
Key Inventory Terms Lead time: Holding (carrying) costs:
EOQ for Production not Order (EPQ)
Chapter 15 Inventory Systems for Independent Demand
The Economic Order Quantity
DPT 335 PRODUCTION PLANNING & CONTROL
Operations Research Lecture 12.
Chapter 10 Inventory Management
Operations Research Lecture 13.
Inventory Stock of items held to meet future demand
Presentation transcript:

Economic Order Quantity EOQ Model Equations (part - 1) Equations (part – 2)

EOQ Model Total Inventory cost is the minimum. Annual demand of the item is constant and known. Annual demand of the item is uniformly distributed through out the year. Lead time is zero. Total OC (P) = Total CC (R)

Equations For EOQ, Total OC (P) = Total CC (R) Total OC (p) = AO/Q Total CC (R) = QC/2 AO/Q = QC/2 Where, A = Annual Demand O = Ordering Cost ( Rs) / Order Q = EOQ C = Carrying Cost ( Rs )/ Year

Equations (part - 1) Average Inventory = (Max. Inventory + Min. Inventory) / 2 Also, Average Inventory = Q / 2 Total Inventory Cost (T) = P + R Number of Orders per year = A/Q Duration of one inventory cycle = Q/A

Problem Solution Zen Bicycles Ltd sources 3,000 seat covers for its bicycles from an outside supplier. The OC is Rs 10 per order and the CC is Rs 6 per unit per year. The company has 300 working days per year. Find EOQ Number of orders/year Total Inventory Cost Number of Inventory Cycles in a Year Duration of an Inventory Cycle

Problem Solution The demand of small electric motor used in a fan is 20,000 per year. The price of the motor is Rs.100 per motor. The carrying cost is 8 percent of the purchase price. The ordering cost is Rs.200 per order. The number of working days is 320. EOQ Number of orders/year Total Inventory Cost Number of Inventory Cycles in a Year Duration of an Inventory Cycle

Equation (Part – 2) EOQ model with shortages 2 Q = (2AO/C)(C+K)/K Where Q = EOQ A = Annual Demand O = Order Cost C = Carrying Cost K = Cost of Shortage

Equation (Part – 2) Maximum inventory with shortages 2 Q1 = (2AO/C)(K/(C+K) ) or = Q - S Where Q = EOQ A = Annual Demand O = Order Cost C = Carrying Cost K = Cost of Shortage S = Maximum Shortage

Equation (Part – 2) Shortage, S = CQ/(C+K) Where S = Maximum shortage Q = EOQ C = Carrying Cost K = Cost of Shortage

Equation (Part – 2) Maximum inventory = Q – S Reorder level = DDLT - S Where S = Maximum shortage Q = EOQ DDLT = Demand During lead time

Problem Vishal Computer sales (P) Ltd is a leading dealer of computer servers and net working devices at Raipur. Servers are expensive machines and therefore, Vishal follows a back ordering policy. The CC is Rs. 50,000 per servers per year and the OC is Rs 1,200 per order. The cost of shortage per server is estimated at Rs. 20,000. The annual demand of servers is 300 units. Find The optimal order quantity (EOQ with intentional shortages) Maximum shortage level Maximum Inventory level Reorder level, considering lead time 7 days and DDLT is 3 units.

Problem The annual demand for an automobile component is 24,000 units. The carrying cost is Rs 0.40/unit/year, the ordering cost is Rs.20,00 per order and the shortage cost is Rs.10./unit/year. Find The optimal order quantity (EOQ with intentional shortages) Maximum shortage level Cycle Time Maximum Inventory level Reorder level, considering lead time 7 days and DDLT is 5 units.