Trns port Modification Reports Process Presented at the Trnsport User Group Conference Burlington VT by Shirley Daugherty NE DOR Chair, Trnsport Task Force.

Slides:



Advertisements
Similar presentations
Trns•port SiteManager Materials Management and LIMS Presentation
Advertisements

Prepared by the Virginia Department of Criminal Justice Services PTCC …the future of case management DCJS presents:
New Jersey Trnsport Cost Estimation System (CES) Implementation TUG 2006 John Lombardi Info Tech, Inc.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Each AASHTO fiscal year, the Trnsport Task Force (TTF) reviews and makes decisions related to enhancements and new development requests for Trnsport
More CMM Part Two : Details.
2006 Trnsport Task Force Report Trnsport Users Group Conference October 22, 2006 Portland, Maine Jim Johnson, Florida DOT Chair, Trnsport Task Force.
Chapter 2 The Analyst as a Project Manager
TRACER and NGT Estimation Kyle Knudson, TRACER Product Manager Teresa Franklin, Trnsport Product Manager October 25, 2006 Earth Tech & Info Tech Collaboration.
Software Configuration Management
Pertemuan 16 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Purpose of the Standards
4 types of implementing information systems
Problem Management ISD Division Office of State Finance.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) November 6, 2005.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
ITimpulse NOC process This is an interactive, detailed, step wise guide explaining how alerts are managed at our NOC. This document contains information.
“Here’s why you need the new wheels, too…” Shawn and Steve Image from
International Business and Technology Consultants AMS confidential & proprietary SPS Help Desk Presentation Army User’s Conference June 2002.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
1 Software Construction Software Construction Chapter 1.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 26, 2006.

Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Software Project Management Lecture # 7. Outline Project Scheduling.
Jim Ferguson, Nebraska DOR Trnsport User Group Chair It’s a TUG Chair’s Life A 2005 Review Welcome to 2005 TUG Conference Daytona Beach, Florida.
TUG Overview Brian Parnell (TUG Chair, South Carolina Department of Transportation) October 6th, 2007.
User creates problem ticket on Web tool? User has Problem End user requests asst. via , phone, in person. No ticket created Helpdesk staff decides.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
Construction, Testing, Documentation, and Installation Chapters 15 and 16 Info 361: Systems Analysis and Design.
Beckie Curtis, Michigan DOT Virtis/Opis Issue Process.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Class Scheduler Team Members Bernard Battle Jerad Blake James Knoch Chris Louallen Lenora Pride.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 9, 2007.
2005 Trnsport Task Force Report Trnsport Users Group Conference November 6, 2005 Daytona Beach, Florida Paul Neumann, Colorado DOT Chair, Trnsport Task.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
ELECTRONIC PROPOSAL BOOK September 9, Project Team Brandon Crowley, TDOT Construction Vonda Kellett, TDOT Construction Michele Baker, Info Tech.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
State of Georgia Release Management Training
ASUG SAP Adoption Influence Council The focus is on how to increase awareness, adoption and implementation of SAP enhancements that are delivered as part.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Objectives 4 Identify the meaning of software maintenance and it’s importance in the project life cycle 4 Understand why maintenance is needed.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
1 SCR756 – Enhancements to the MarkeTrak application –Fondly called - MarkeTrak Phase 3 –ERCOT CEO determined that SCR756 is not necessary prior to the.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Integrates and automates the transportation safety planning and management Software analysis tools to assist highway agencies to implement their SHSP and.
CS223: Software Engineering Lecture 32: Software Maintenance.
Software Maintenance1 Software Maintenance.
ITIL Project Change Management Workshop 7 February 2007
SAFETYANALYST Integrates and automates the transportation safety planning and management Software analysis tools to assist highway agencies to implement.
IT Infrastructure Library (ITIL) For You -With Max Mart The ManageEngine Guy!!
Software Configuration Management
Software Configuration Management
Software Project Configuration Management
Figure 9.8 User Evaluation Form
Introduction to the Online Help Desk
Principles of Information Systems Eighth Edition
International User’s Conference September 2017
Systems Analysis and Design
AgilizTech Support Desk Overview
Software Requirements
Quicken Installation Phone Number More info :
Systems Development Life Cycle
Student Information Services (SIS)
Presentation transcript:

Trns port Modification Reports Process Presented at the Trnsport User Group Conference Burlington VT by Shirley Daugherty NE DOR Chair, Trnsport Task Force September 8, 2003

Trnsport TMRs Trnsport Modification Requests –Errors –Enhancements

Trnsport Enhancements An Enhancement TMR requests a change to software programs or documentation to extend or improve functionality or performance. All enhancements to the generic Trnsport system must have the approval of the Trnsport Task Force prior to being implemented.

Trnsport Errors In general, a Maintenance TMR requests correction of an error that causes product materials (programs or documentation) to perform contrary to their requirements, design, or other documented specifications. Maintenance TMRs may also refer to activity involved in changing program code in response to the discovery of unacceptable performance issues or to address changes in software operating environment that cause the program to work incorrectly.

Trnsport Errors Report to Info Tech Help Desk by phone or Cloverleaf on-line report –What is the problem? –Document what you were trying to do Provide as much detail as you can –What result was expected? –Provide priority ranking

Trnsport Errors Info Tech staff will –Assign Call Number –Evaluate report for completeness –Request additional information if needed –Will verify error –Assign a Error Report Number

Trnsport Errors Five priorities: Urgent – Very important, stops ability to perform a critical business function Critical – Problem presents licensee from completing implementation (should include a date needed by) High – Important, a major inconvenience but does not stop a critical business process

Trnsport Errors Five priorities (continued): Medium – A definite issue but does not stop business process; can work around Low – A Nuisance to business procedures; can work around

Trnsport Errors SiteManager Errors CIRT – Construction Issues Review Team MIRT – Materials Issues Review Team

Trnsport Errors What affects the scheduling of delivery of the Error Resolution? 1)Priority Rating 2)Level of complexity to resolve 3)Resource Availability Funds and Time 4) Bundling for Efficiency