Technology Platform Operation Review Days, Brussels 8th-9th December 2005 A. Le Duigou CEA (Commissariat à l’Energie Atomique) / F HYdrogen THErmochemical.

Slides:



Advertisements
Similar presentations
InJoy&Train FAFB Information Day 16 November, 2007 FP7 OVERVIEW TIGRAN ARZUMANYAN.
Advertisements

9th Grove Fuel Cell Symposium, 6th October 2005 Sustainable Energy Systems Slide n° 1 7 th FRAMEWORK PROGRAMME BUILDING THE EUROPE OF KNOWLEDGE European.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
Technological foresight methodology applied to forecast the future of hydrogen and fuel cells (EurEnDel project) Anna Oniszk-Popławska EC Baltic Renewable.
SULFUR BASED THERMOCHEMICAL CYCLES FOR HYDROGEN PRODUCTION PETER OTA.
Nuclear Energy University Programs NGNP Systems Analysis August 10, 2011 Hans Gougar.
1 Energy Info Day FP7-ENERGY th December 2007 NOT LEGALLY BINDING Bruno Schmitz, DG RTD European Commission Introduction to 2008 RTD Energy Calls.
EU 6th Framework Programme for RTD: Energy Opportunities Encouraging quality Irish participation: Potential topics, key issues, main steps. Bob Hanna SEI.
3 rd General Assembly · Exhibition · Drive&Ride, 4-6 October 2006, Brussels Project funded by the European Commission SES6-CT NoE HySafe “Safety.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
IPHE Goal Efficiently organize and coordinate multinational research, development and deployment programs that advance the transition to a global hydrogen.
Horizon 2020 Energy Efficiency Information Day 12 December 2014 Parallel session: Energy Efficiency in Industry (large companies and SMEs) – Topics EE16.
SAMT - Sustainability assessment methods and tools to support decision-making in the process industries Introducing SAMT project Hanna Pihkola, VTT Introducing.
Introduction and Project Overview 3rd GEO European Project Workshop Istanbul, October 8-9, 2009.
European Union Strategy for clean and energy-efficient vehicles Johan Renders Legislative Officer Automotive Industry Unit DG Enterprise & Industry 5th.
BNFL/Westinghouse’s Perspective on the Nuclear Hydrogen Economy Dr PJA Howarth Head of Group Science Strategy.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
Gasifier/Feedstock Effect on Syngas Composition Department of Mechanical Engineering, Yuan Ze University 1.
1 Framework Programme 7 Guide for Applicants
RENESENG builds dedicated systems engineering technology for biorefineries. RENESENG builds tools to prevent expensive experimentation saving capital,
European GDE Meeting – Oxford, October 25th /13 European GDE Communication: Future Plans European GDE Communication: Future Plans Perrine Royole-Degieux.
3 rd General Assembly · Exhibition · Drive&Ride, 4-6 October 2006, Brussels HYTHEC The search for a long term massive hydrogen production route FP
1 International Cooperation Aspects and Instruments of the European Union Strategic Energy Technologies (SET) Plan Ismo Koskinen Energy Counsellor Delegation.
29th Nov 2001 Dr. David Bailey Thematic Network CAME-GT Cleaner And More Efficient Gas Turbines New Opportunities for Newly Associated Countries.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
Status report: Annex 25 Surplus Heat Management using Advanced TES for CO 2 mitigation Bad Aibling, Germany November 2011 Dr. Luisa F. Cabeza Operating.
1DEN/DSOE Romania september 2006 HOTLABSSA “The EU 6 th FP Support Specific Action HOTLABSSA: a new step towards an European Network on Hot Laboratories”
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
Outlook to FP7 Call3 in Energy Siegfried Loicht Division for European and International Programmes (EIP) Austrian Research Promotion Agency (FFG)
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
Building the Europe of Knowledge Proposals for the 7 th Research Framework Programme
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
LEADER, GIF,EURATOM and other News 6 th PCC and 3 rd GB meeting of the LEADER project Karlsruhe November, 23 rd 2012 Alessandro Alemberti
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Republic of Slovenia Ministry of Higher Education, Science and Technology Republic of Slovenia Ministry of Higher Education, Science and Technology 6.
PIME 2004 / Barcelona, Feb. 10, 2004Nuclear Energy Division 1 PIME 2004 plenary session February 10, 2004 – Barcelona Preparing the future : New challenges.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
FP7* support to GEO activities Update for 5 th GEO ADC Meeting A Edwards Washington, D.C., U.S.A September 2007 * FP7 is the European Community’s.
EC support to geothermal energy research and demonstration Jeroen Schuppers European Commission, DG Research ENGINE Launching Conference Orléans 13 February.
European Energy Research Alliance Cork April 12 Henry Jeffrey Institute for Energy Systems EERA and EERA Ocean Energy.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Slide 1 Author D:/DATA/POWERPNT/Hugon/InnconceptsFP5toFP6 INNOVATIVE CONCEPTS FOR NUCLEAR FISSION ENERGY: FROM FP5 TO FP6 Michel Hugon DG RTD-J-4.
1CHEP2000 February 2000F. Gagliardi EU HEP GRID Project Fabrizio Gagliardi
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
FP6 – Sustainable Energy Systems Encouraging Quality Irish Participation Kevin Brown, FP6 Information morning Alternative National DelegateDublin -- July.
Brussels, 3 July 2012 Elisa Vargas, EVREN 2 nd Coordination Meeting Halting Desertification in the Júcar River Basin (HALT-JÚCAR-DES) 1/15 De la Marquesa.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
JP Nuclear Materials SP3: Development of Ceramic Materials for Next Generation Nuclear Reactors Françoise Maday ENEA, Italy SP3 Coordinator
WP2 – Definition of European DCA strategy EuroVO-DCA Final Review, 29 April 2009 Françoise Genova, Coordinator, WP2 lead WP2 Definition of European Data.
Sustainable Development, Global Change and Ecosystem Stockholm-pat III WP  Fuel cells, including their applications  New technologies for energy carriers.
A.Ricci - 17/02/09 Introduction to NEEDS SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] Andrea Ricci, ISIS Brussels,
H2020 The EU Framework Programme for Research and Innovation.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Brussels, 1st of June 2005 Energy Research Infrastucture Workshop Hydrogen: what needs for Research Infrastructures ? Paul Lucchese Hydrogen and Fuel cells.
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano, Ph.D., TECHNOFI, COO
Hydrogen via Thermochemical cycles
EERA e3s and Energy Consumers
Drilling, Stimulation, Completion, Monitoring
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
CEA’s assessment of the sulfur-iodine cycle for hydrogen production
HYDROGEN PRODUCTION BY THE IODINE-SULPHUR THERMOCHEMICAL CYCLE
Development of HI decomposition Process in Korea
Nuclear Hydrogen Production Program in the U.S.
MEthane activation via integrated MEmbrane REactors
Fitness Check EU Water Policy
Presentation transcript:

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 A. Le Duigou CEA (Commissariat à l’Energie Atomique) / F HYdrogen THErmochemical Cycles Contract N°

Technology Platform Operation Review Days, Brussels 8th-9th December 2005  MODELS : flow-sheeting, industrial scale-up (components, safety and costs)  EXPERIMENTATION for both cycles : SOLAR H2SO4 decomposition step  EXPERIMENTATION on S_I cycle : H2 production step HYTHEC / the PARTNERS Assessment of two H2 production thermochemical cycles : the Sulfur-Iodine (S_I) cycle (major effort) and the Hybrid-Sulfur (WH) cycle / Renewable Raw Material (Water) / Nuclear and RES (solar) / CO2-Free 6 PARTNERS : research institutes (DLR, CEA – coordinator), universities (DIMI, USFD), engineering organisation (EA) and SME (ProSim-SA) Duration : 3,5 years - Kick-off : 01/04/ EC funding ~1,9 M€

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 FLOW-SHEETING AND MODELING / S_I and WH Importance of T level for H2SO4 section and heat recovery for HIx section S_I Hybrid Sulfur HIx section H2SO4 section Electrolytic section Flow-Sheets : describe the whole processes / integrate the models from experimentation / are regularly updated

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 INDUSTRIAL SCALE-UP / S_I and WH S_I cycle / first coupling, component sizing and costs performed WH cycle / elaboration and selection of process concepts (solar / hybrid energy souces)

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 EXPERIMENTATION / S_I H2 production step knowledge and improvement Experimental measurements of the partial pressures above a mixture of HI, H 2 O and I 2. Use of FTIR, UV-Vis. and RAMAN spectroscopies Optical selectivity testing Membrane selectivity test using CARS (Coherent Anti Raman Spectroscopy) First significant results obtained at low P and T Simulations carried to investigate the change in efficiency with different amounts of dewatering of the process stream

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 EXPERIMENTATION / H2SO4 decomposition by solar energy Comparison and weighting of different receiver-reactor concepts / CFD and FEM modelling Success performance of first test campaign CFD and FEM modelling Solar input Concentrated H2SO4 input Vaporization Decomposition Gas

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Major HYTHEC characteristics linked to SRA topics HYTHEC works in the scope of the following pathway: S_I cycle: nuclear  heat  « thermolysis »  hydrogen WH cycle : all the yellow scope, simplier study

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Major HYTHEC characteristics linked to SRA topics (1/2) “The ultimate goal is to produce hydrogen from carbon-dioxide-lean energy sources including nuclear fission” HYTHEC works on long term processes “Long term outlook” (2050) for thermochemical water splitting : Sulfur- Iodine (S_I) and Hybrid-Sulfur (WH) cycles Hydrogen made from a “variety” (2) of primary energies: Nuclear and Solar heat sources (last one for renewable heat and electricity sources) Centralised / decentralized production (limits for TC cycles ?): rather large scale plants, 50 to 600 MWth CO2-Free process: use of water as a raw material, then no need for CO2 sequestration, « technology which still needs to be practically verified and accepted » « Hydrogen a major transport fuel by 2050”: HYTHEC works on massive hydrogen production plants

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Major HYTHEC characteristics linked to SRA topics (2/2) “Basic research issues: analysis and development of thermochemical processes » “Recommend basic research areas : analysis and development of thermolysis processes in compliance with available heat sources”: VLE model for the HI/I2/H2O system of the S_I cycle; Study of thermodynamics and membranes capabilities for enhancement of S_I H2 production section; Feasibility, advantages and drawbacks of solar (RES) thermal splitting of H2SO4; More generally: flow-sheeting, modelling, large scale assessments with 2 energy sources (Nuclear and Solar)

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 HYTHEC is a short term R&D activity : 2004 to 2007 Research strategy for hydrogen production for 2005 to 2015 A constraining level of efficiency seems to be required : be careful about the definition ….HYTHEC will propose very soon its point of view about « efficiency » « Thermochemical processes are mostly proposed in the context of advanced nuclear reactors and feature prominently in the Technology Roadmap for Generation IV nuclear reactors. Alternatively, the high temperature heat from solar concentrators may be used »: Nuclear VHTR and Solar heat sources in HYTHEC. S_I cycle « generally considered the most promising thermochemical cycle »; HYTHEC considers WH cycle too

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 How HYTHEC is connected to SRA / DS timetable HYTHEC « 2020 snapshot »

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 HYTHEC detailed planned/ongoing activities Phase 1 Phase 2 Phase 3

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Major HYTHEC main expected results/achievements (1/2) FLOW-SHEETING AND MODELING / S_I and WH – comparative assessments INDUSTRIAL SCALE-UP / S_I and WH – massive H2 production processes reliability (coupling, components, safety, costs) EXPERIMENTATION on S_I H2 production step - knowledge and improvement (mainly possible use of membranes) EXPERIMENTATION on S_I and WH - H2SO4 decomposition by solar energy

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 HYTHEC main expected results/achievements (2/2) Phase 1 - April 2004 to March 2005 : acquisition of the input data, flow- sheeting, definition / construction of the devices and measurement techniques, and first steps in the modelisations (membranes, coupling, component sizing) HYTHEC sent comments on SRA and related topics addressed (FP6 – HYTHEC – N1 / 01 and FP6 – HYTHEC – N1 / 02 ) Phase 2 - March 2005 to March 2006 : S_I and Westinghouse evaluations on first basic flow-sheets, from theoretical, experimental, industrial scale-up and cost studies Phase 3 - March 2006 to September 2007 : detailed S_I and Westinghouse evaluations from theoretical, experimental, industrial scale-up and cost studies

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Cross-cutting R&D in the SRA : “hydrogen safety with both technical and socio-economical aspects: HYTHEC works on Industrial scale-up, including safety aspects, and costs evaluations for S_I and WH cycles: -SP2 / S_I cycle - SP6 / Capability of large-scale H2SO4 decomposition in a solar furnace - SP7 / WH cycle Cross-cutting issues (1/3) Recommend cross-cutting areas: « Hydrogen production is closely linked to hydrogen storage and distribution »: HYTHEC linked to other European projects

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Cross-cutting issues (2/3) A broad Dissemination 2 workshops: JRC workshop in Brussels (December 2004) MICANET-WP4 meeting in Brussels (April 6th, 2005) 9 communications dedicated to part or all HYTHEC: Hydrogen Energy Congress in Brussels (March 2005), IHEC (Istanbul July 2005), EHEC (Zaragoza November 2005), Cologne Solar Symposium (June 2005, Cologne), 7th WCCE (Glasgow, July 2005), AIChE 2005 (Cincinnatti) 3 proposals : German Energy Congress (February 2006), Solar Paces (June 2006), WHEC 2006 (Lyon, June 2006) HYTHEC mentioned in 8 communications 1 paper published in IJHE (HIx separation in S_I cycle), a paper proposed to IJHE (HYTHEC) A private site, soon a public one

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Cross-cutting issues (3/3) Education Diploma thesis : 2 finalised at DLR, 6 in progress totally or partially funded (2 at DLR, 2 at DIMI, 2 at USFD) 3 PHD students at USFD, working on subjects related to HYTHEC background (not directly funded) Students at CEA, working on subjects related to HYTHEC background (not directly funded) 1 internship at DLR

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Enhancing cooperation and future perspectives A large collaboration with other EU projects RAPHAEL (former VHTR – IP) 3 interface meetings held (presentations and collaboration possibilities / choice of the boundaries between the 2 projects / exchange of data / choice of a common coupling scheme) HYSAFE : first meeting on October 2005 (Karlsruhe) / presentation and collaboration topics to be defined today (DLR attended too) EXTREMAT / first contacts ongoing HYWAYS (via INNOHYP-CA) (data to be given from HYTHEC industrial scale-up studies) INNOHYP-CA (S_I and WH cycles characteristics given, participation to meetings) HYTHEC Consortium Agreement upgraded

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Enhancing cooperation and future perspectives (1/2) Other collaborations / partners initiatives CEA : USA (S_I cycle (demonstration loop, R&D), Japan (R&D), Korea (R&D), ENEA, CIEMAT) USFD : working group with Westinghouse, PBMR (Republic of South Africa), SRNL, ORNL and University of South Carolina DLR : European Colaboration within the SOLLAB Alliance, and SOLAR PACES DIMI : participation to a national initiative

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 Enhancing cooperation and future perspectives (2/2) Develop the collaborations with other European and national projects : both for the data, knowledge and boundary conditions exchanges, and for an appropriate comparative evaluation with other processes R&D necessary for high temperature processes (basic knowledge, materials) / need of technological breakthroughs ? In addition, never forget the large-scale aspects, including component pre-design, coupling to the primary heat source, safety, chemical and materials used, and of course costs (credibility, R&D needs pointed out too), Demonstration steps

Technology Platform Operation Review Days, Brussels 8th-9th December 2005 THANK YOU DANKE GRAZIE GRACIAS MERCI THE HYTHEC TEAM