7671-9/06- 1 Nuclear Power Poised for Expansion 7671-9/06- 1 Jimmy Wang Vice President Bechtel Nuclear.

Slides:



Advertisements
Similar presentations
New Nuclear Plants in the United States
Advertisements

FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
(1) Office of Nuclear Energy, Nuclear Energy – Advanced Fuel Cycles and the Global Nuclear Energy Partnership Buzz Savage Office of Nuclear Energy U.S.
The Promising Potential of Nuclear Power The Promising Potential of Nuclear Power Dan R. Keuter Vice President, Entergy Nuclear Business Development California.
Advanced Reactor Technologies California Council on Science and Technology Sacramento 24 May 2006 Harold McFarlane Deputy Associate Laboratory Director.
Nuclear Energy Progress and Opportunities Moving Forward: Perspective on Building New Nuclear Power Plants Dr. Joe C. Turnage Senior Vice President - Strategy,
1 © 2008 Electric Power Research Institute, Inc. All rights reserved. The Power to Reduce CO 2 Emissions The Full Portfolio Energy Technology Assessment.
Slide 1 Doc.ppt 0144 NEW NUCLEAR POWER Ed Cummins Westinghouse Electric Company June 29, 2006.
CALPINE March 2, 2004 HARVARD ELECTRICITY POLICY GROUP Natural Gas and Electricity Ron Walter Executive Vice President.
1 The Challenges Facing New Generation Capacity An overview and discussion Paolo Gaio Westinghouse International NPP.
New Reactors Bill Borchardt Director, Office of New Reactors.
Update on New Nuclear Plant Development for the Kansas Energy Commission August 15, 2007 Mary Quillian Director, Business and Environmental Policy Nuclear.
Nuclear Power Isar Plant - Germany Diablo Canyon - California.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
New Nuclear Power and Climate Change: Issues and Opportunities Mary Quillian Director – Business and Environmental Policy Nuclear Energy Institute.
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
Ralph L. Andersen, CHP Director – Health Physics & LLRW Nuclear Energy Institute May 15, 2008 The Resurgence of Nuclear Power Health Physics Society Baltimore-Washington.
U.S. Nuclear Energy Policy and Outlook After Fukushima Mark Holt, Congressional Research Service October 19, 2011.
NRC Update 2009 New Reactor Licensing Activities
1 Status of and Outlook for Nuclear Generation in the U.S. Energy Bar Association Mid-Year Meeting December 3, 2009 Scott Sitzer U.S. Energy Information.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
THE GLOBAL NUCLEAR RENAISSANCE AND ASME NUCLEAR ACCREDITATION
Westinghouse Operational Experience and Prospects for New Build
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
U.S. Nuclear Program – A Status Report APPA Board of Directors Meeting Marvin S. Fertel President and Chief Executive Officer September 14, 2010.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Nuclear Power Plant New Build Activity: A Market Overview
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Status of Nuclear Power Plants in the United States ASQ Energy and Environmental Conference August 28, 2006 Tom Mulford Managing Director Advanced Nuclear.
Nuclear Power Plants Emission-Free Stability in a Volatile Market LSU Energy Conference October 21-22, 2004 Adrian Heymer, NEI, ,
Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX:
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23, 2009.
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
By: Nick H. Aubrey V. Dan L. Kiera B. Produced by controlled nuclear reactions Controversial and has an on-going debate about the use of it. Proponents,
U.S. Energy Policy Legislation Thelma L. Wiggins Manager, Media Relations Nuclear Energy Institute ENS PIME 2004 Barcelona, Spain Feb. 9, 2004.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
Progress Energy Issues Overview April 25, 2006 Don Cooke Sr. Environmental Coordinator.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Nuclear Energy 2016: Status and Outlook
Greening the Grid with America’s Nuclear Power Plants.
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
The Case for IGCC Kay Pashos President, Duke Energy Indiana MARC 2006 Annual Meeting June 20, 2006.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
1 The Promising Potential of New Nuclear Donald C. Hintz President, Entergy Corporation American Association of Blacks in Energy February 26, 2004, New.
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23,
Challenges for New Base Load Generation Dave Harlan
Mary Quillian Director, Business and Environmental Policy
The State of Our Industry
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
NEI Perspectives on Small Modular Reactors
Adding Nuclear Power to the Grid
Presentation transcript:

7671-9/06- 1 Nuclear Power Poised for Expansion /06- 1 Jimmy Wang Vice President Bechtel Nuclear

7671-9/06- 2 Projected U.S. Energy Demand The U.S. Is Projected to Need 50% more Electricity by 2025 Source: U.S. Department of Energy ,787B kWh 3,839B kWh

7671-9/06- 3  103 nuclear plants  20% of the nation’s electricity U.S. Nuclear Energy—Quick Facts  Displaces 680 million metric tons of CO 2 /yr  Equivalent to 131 million passenger cars/yr

7671-9/06- 4 U.S. Nuclear Drivers  Safety first  Proven performance  Cost effective  Affordable  Energy security and independence  Lowest cost base load generation/grid stability  Emission-free

7671-9/06- 5 U.S. Nuclear Drivers 92%  NRC significant events  Continuously declining  Proven performance  Continuously increasing  Record levels ‘05 Years ‘05 Years

7671-9/06- 6 U.S. Nuclear Drivers  Cost effective  1.68 cents/kWh  Emissions  Emits no GHGs  On par with renewables Years ‘05 Coal Gas Nuclear Hydro Biomass Wind SolarGeo ¢/kWh Life Cycle CO 2 Emissions Tons CO2-equiv./GWeh

7671-9/06- 7 Source:Bisconti Research Inc. Increasing Public Support Important for our energy future 83% Keep the option to build nuclear plants 74% Definitely build nuclear plants in future 58% Accept new reactors at nearest plant 69% Favor use of nuclear energy 70% Evidence of U.S. Nuclear Revival 86% of People Within 10 Miles of Existing Nuclear Plants Favor New Nuclear Power Plants

7671-9/06- 8 Delivering Investing in Insuring Reliable Jump Start Transmission Infrastructure Diversity of Fuels Nuclear New Plant Construction R&D Energy Policy Act of /06- 8

7671-9/06- 9 Nuclear New Plant Construction R&D  Loan guarantees  Risk assurance  Production tax credit  Price-Anderson  Decommissioning funds  Next generation nuclear plant  Nuclear hydrogen production  Advanced fuel cycle initiative  Nuclear engineering program  Medical isotopes Energy Policy Act of /06- 9

7671-9/ Key Provisions for New Nuclear Plant Construction Loan guarantees80% of project cost  Higher leverage  Lower debt cost Production tax credit$18/MW hr  Through 2021  $125M/1000 MW per year  6,000 MW eligible Risk assuranceDelay protection  $500M for 1 st 2 plants  $250M for next 4 plants Price-AndersonNuclear liability insurance  Reauthorization for 20 years Decommissioning funds Updates for treatment  Allows companies to establish funds and make contributions  Allows transfer of nonqualified funds to qualified funds

7671-9/ Nuclear R&D—Key Provisions Next generation nuclear plant  $1.25B  Test 2 advanced designs of INL Nuclear hydrogen production  $200M  Demonstrate production of hydrogen Advanced fuel cycle  $580M  More proliferation-resistant fuel University nuclear engineering program  $56M  Recruit and educate students in nuclear science and technology Medical isotope assurance  Clarifies procedures for licensing the export of HEU  Ensure a robust, affordable supply of isotopes to U.S. medical community

7671-9/ Reactor Designs Being Considered DesignVendorType Design Certification Status ABWRGE NuclearBWRApproved System 80+WestinghousePWRApproved AP 600WestinghousePWRApproved AP 1000WestinghousePWRApproved ESBWRGE NuclearBWR Docketed—December 2005 Certification—2008 EPRFramatome ANPPWRCOL Application—December 2007 Certification—June 2010 Generation III + Generation III

7671-9/ New Generation in the United States EPR ESBWR AP 1000 ABWR Southern Constellation Dominion SCE&G Entergy Duke Progress Energy TVA FPL STP Amarillo Power TXU Technologies Utilities AREVA NP Westinghouse General Electric

7671-9/ New Nuclear Plant Players: The Scorecard CompanyApplication StatusPlantTechnology Constellation Energy Plans to submit COL ApplicationAREVA NP’s EPR Plans to submit ESP and COL ApplicationWestinghouse’s AP 1000 Dominion Submitted ESP Preparing COL General Electric’s ESBWR Submitted ESP Preparing COL Application Plans to submit ESP and COL General Electric’s ESBWR Preparing COL applicationWestinghouse AP 1000 Preparing COL application Westinghouse AP 1000 Preparing COL applicationWestinghouse AP 1000 Preparing COL applicationWestinghouse AP 1000 Plans to submit COLTBD Plans to submit COLABWR Plans to submit COLABWR Plans to submit COLTBD Vogtle North Anna Grand Gulf River Bend Harris Bellefonte V.C. Summer Cherokee Calvert Cliffs Nine Mile Point TBD South Texas ABWR South Texas

7671-9/ Potential New Nuclear Construction Plans CompanySiteDesign Number of ReactorsCOL Application Filing Date Projected Date of Operation DominionNorth Anna (VA)ESBWR2September 2007TBD Duke PowerCherokee (SC)AP 10002Late 2007/Early 2008TBD EntergyGrand Gulf (MS)ESBWR14 th Qtr. 2007/1 st Qtr. 2008TBD EntergyRiver Bend (LA)ESBWR1Early 2008TBD TVA/ SouthernBellefonte (AL)AP th Qtr. 2007TBD Progress EnergyHarris (NC)AP 10002Late 2007/Early Progress EnergyFlorida (TBD)AP 10002Late 2007/Early SCE&G/Santee Cooper V.C. Summer (SC)AP rd Qtr Southern Co.Vogtle (GA)AP 10002March 2008TBD UniStarCalvert Cliffs (MD) Nine Mile (NY) (FL) EPR1 – 4June 2008 and June STPSouth Texas (TX)ABWR2June Amarillo PowerAmarillo (TX)ABWR2August TXUComanche PeakTBD6 Potential Construction 27 – 30

7671-9/ Summary Estimate of New Nuclear Plants Based on the Design NRC-Centered Approach COLsUnits AP ESBWR 3 4 EPR 2 4 ABWR 2 4 Unspecified 3 6 Total1630

7671-9/ U.S. Nuclear Industry—First Movers Constellation Calvert Cliffs Southern Vogtle FPL TBD Dominion North Anna TVA/Southern Bellefonte Entergy Grand Gulf Entergy River Bend Progress Energy Florida—TBD Duke/Southern Cherokee Progress Energy Harris SCB&G VC Summer Constellation Nine Mile STP South Texas Amarillo TXU Comanche Peak

7671-9/ New Reactor Licensing Applications AP 1000 Program Review ESBWR Program Review Unspecified ABWR Program Review EPR Program Review 2013 Design Cert Design Certification UniStar—Calvert Cliffs (MD) Hearing UniStar—Nine Mile Pt (NY) Hearing Design Certification Dominion—North Anna (VA) Hearing NuStart—Grand Gulf (MS)Hearing Entergy—River Bend (LA) Hearing Unannounced Applicant ESP Hearing Duke—Cherokee (SC)Hearing Progress Energy—Harris (NC) Hearing South Carolina E&G—Summer Progress Energy—TBD (FL) Hearing Southern—Vogtle (GA) Hearing FPL No Site or Vendor Specified Hearing NuStart—Bellefonte (AL)Hearing Amarillo PowerHearing Vogtle ESP Hearing North Anna ESPHearing Grand Gulf ESP Hearing UniStar—EPR—COL 3 Hearing UniStar—EPR—COL 4 Hearing UniStar—EPR—COL 5 Hearing NRG Energy—South Texas Project Hearing Duke ESPHearing Duke ESPHearing Unannounced Applicant COL Hearing Clinton ESPHearing

7671-9/ Infrastructure Challenges  Skilled and experienced personnel  Architect/engineers and constructors DesignConstruction management EngineeringCraft  Nuclear power plants OperatorsEngineers Project managersRad Protection technicians Long lead times for major components  NSSS suppliers Engineering Design  NRC Engineers for COL reviews Construction inspection personnel  Supply chain  Nuclear grade equipment, components, and materials N-stamp App. B QA program Fabrication capability/capacity Quality issues  Nuclear fuel  Availability with nuclear expansion  Cost Areas of Concern

7671-9/ Nuclear Power Poised for Expansion / Jimmy Wang Vice President Bechtel Nuclear