1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D3- Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planning QUESTIONS.
Advertisements

1 LEGISLATIVE AND NORM BASIS FOR DECOMMISSIONING OF NUCLEAR INSTALLATIONS IN RUSSIA Main authors: Prof. B.K. BYLKIN, Dr. Yu.A. ZVERKOV Russian Research.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
NRC LICENSE APPLICATION PROCESS
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
ENVIRONMENTAL MANAGEMENT PLAN
MODULE “STRATEGY DEVELOPMENT”
IAEA International Atomic Energy Agency International Workshop on the Safe Disposal of Low Level Radioactive Waste WG3 debriefing.
Group of Experts on Monitoring of Radioactively Contaminated Scrap Metal Second Session Geneva, June 2006 United Nations Economic Commission for.
January 2006 JINR SC Session Объединенный институт ядерных исследований Joint Institute for Nuclear Research JINR and Innovation Activities A.Ruzaev Международная.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
1 MAIN ASSUMPTIONS  Federal Law “ON USE OF THE ATOMIC ENERGY”  Federal Law “ON RADIATION SAFETY OF THE POPULATION”  Law of Russian Federation “ON CONSERVATION.
Environmental Remediation National Policy,Strategy and
On the spot checks Double financing prevention administration processes Simona Liutkienė, Vaida Zigmantaitė 1 February, 2012.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
Situation of the NPP in Spain. WHAT IS AMAC? - OBJECTIVES: SAFETY OF THE FACILITIES PLANS FOR NUCLEAR EMERGENCY ECONOMIC DEVELOPMENT - 8 NUCLEAR SITES:
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
ISO training courses Developed by DOE and IBRAE RAN and conducted at the Training Center “Emergency Response” of the Institute for Advanced Training.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
56th Regular Session of the IAEA General Conference
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.10 Documents to be Submitted to the Regulatory Body.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Session III: Common Safety Standards- The best way to best practices The IAEA Safety Standards aim at: – Enhancing safety principles and criteria – Documenting.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Working Group 3 Murmansk. SC structure – Assessment context has to be more elaborate and detailed – Optimization. Provide justification based on the document.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the licensee Jiří Veselý, SONS, Czech republic.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
 B&H authorities, in 1998, established Radioactive Waste Storage Facility in order to accommodate for a relatively long term period the disused sealed.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
ESTABLISHING THE BIOLOGICAL DOSIMETRY LABORATORY IN LITHUANIA Albinas Mastauskas, Žygimantas Vaisiūnas Radiation Protection Centre Kalvarijų str. 153,
Nuclear decommissioning: Turning waste into Wealth
THAILAND Training and Tutoring Feedback
Research Reactor Decommissioning Demonstration Project (R2D2)
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Licensing Issues (Renewal)
EU-RUSSIA Cooperation in Energy Efficiency
Research and Test Reactor Decommissioning Inspections
Legal and Regulatory Framework for Nuclear Installations in IRAN
Training and Tutoring Approaches in the Field of Radiation Safety
Course Structure.
WORKSHOP “Emerging environmental pollutants: key issues and challenges” Stresa, Italy June 2006.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic  Cost of Decommissioning  Funding aspects Decommissioning Fund is created on operating NPP as 1.3% of the accounted cost of the selling production

2 CALL FOR COLLABORATION  Joint Projects on exchange of experience  Joint analysis and overview of common experience  Implementation of European experience in Russia  Joint multi-faceted Decommissioning Projects  On-site training (stage) on NRHI decommissioning planning and realization  “EUNDETRAF” session in Russia

3 JOINT MULTI-FACETED DECOMMISSIONING PROJECTS  dosimetry and radiation safety of personnel during dismantling works accounting the design specificity of research facilities and complexes  evaluation of risk under accident scenario at decommissioning works in closed location to the urban zone,  environmental monitoring and ecological safety  big-scale works on dismantling of radioactive equipment and on management of generated radioactive waste  analysis of possible transfer of radionuclides in the environment (ground waters, etc…)  radiological aspects

4 PROPOSED STAGES OF JOINT PROJECTS  Study of principles on creation of informational data base on technical, economical and other aspects of the decommissioning planning and realization, including the preparation to the decommissioning  Study of methodical instruments for decommissioning planning and its common implementation on concrete sites in Russia  Development of complex program of gradual NRHI decommissioning, regarding the abovementioned data base  Development of set of standard documentation on concrete NRHI decommissioning, to obtain the license of Russian Gosatomnadzor, especially - NRHI decommissioning program - Program on complex engineering and radiation monitoring of concrete NRHI - Decommissioning quality provision program - Report on justification of NRHI decommissioning safety - Report on evaluation of environmental impact of NRHI decommissioning

5 NEED IN INTERNATIONAL COLLABORATION  Harmonisation of regulation basis and its practical implementation  Joint Unified Data Base