11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,

Slides:



Advertisements
Similar presentations
How to Build Positive Relationships with Your Partners ACEC Conference Michael Ginnaty March 2, 2010.
Advertisements

Construction Engineering 221
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
David Mackness CEO Scape. EMPA – Making a Difference Issues to resolve A solution from empa Improving your project deliver.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Utah’s Use of CMGC & Project Delivery
Reducing Project Duration
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Reducing Project Duration
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
Alternate Delivery Methods and Sharing Contract Risk APTA - Business Member Board of Governors APTA - Business Member Board of Governors Mike Robertson.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
MARCH 1 Project Management AIM l to provide a broad and practical understanding of the practice of Project Management l to improve Project Management practices.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
MARCH 1 Risk Management Why carry out Risk Assessment? l Is the project too risky? l Threat intensity? l Improve decision making l Clarification of terms.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
The Owner’s Perspective
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Preliminary Project Descriptions/Outline Specifications
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Agency Construction Management :CM NOT AT-RISK
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TEAM 200 TEAM 200 ALLIANCE - T2A ROLL OUT MEETING 25th MARCH 2002 Main Hall University of East London.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Management Approaches. Construction Management Customer appoints Design team and Management team.
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
Better Planning Makes Better Projects Project Challenge 7 th October 2015 Paul Kidston Head of Project Control Taylor Woodrow Simon Taylor Head of Programme.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Construction Management At Risk Process
I N T HE N AME OF G OD. T IME T O M ARKET (TTM) W HAT IS TTM ? time to market ( TTM ) is the length of time it takes from a product being conceived until.
Progressive Design-Build: Examining the Structure, Procurement and Contracting Principles Michael C. Loulakis, Esq., DBIA Capital Project Strategies, LLC.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
Copyright © The Conestoga Group PY 674 – Session 2 Review of week 1 material... Chapter 1: PM Overview – Main Text Book / H. Kerzner Ph. D. Focus.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Advance Technician Diploma in Quantity Surveyor
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
CM at Risk v. Design-Bid-Build
(Additional materials)
Quality Management Systems – Requirements
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Cost Containment Working Group Board Update
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo, GH Phipps Panel:Jim Dent, Weifield Electric Tal Clark, US Engineering Brian Patton, JR Butler Eric Moe, Puma Steel

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Value Through Early Involvement

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Design/Cost Relationship $ Range of Design Details of the Design Cost (and performance) is fixed Designing to the Budget

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Award Criteria During the Process Pre-Design -10%-5%0%5%10%15%20%25%30%35%40%45%50%55%60%65%70%75% Design Design/Draw-Build 35% Design or Greater Preliminary Design Design-Build 20% -35% Design Criteria Design-Build 5% - 20% Direct Sole-Source Selection -10% - 5% Qualifications Emphasis Technical & Price Emphasis Low Price Emphasis CRITERIA DOCUMENTS Describes End Result BRIDGING DOCUMENTS Prescribes How To Achieve End Result Schematic Design Development Construction Documents Programming

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Managing the Process Key Owner Management Points:  Well defined program requirements  Understanding of contract  Clear direction  Timely decisions  Collaborative atmosphere  Timely Payment Key Attributes of a Successful Project  Leadership  Collaboration  TRUST

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Questions How can early involvement save wasted time/expense on design? Compare DBB to DB with respect to arranging the design production schedule – “massive time savings” (Brian P) Are there performance differences between an “arranged marriage” and a designer you select yourself? Why is the sub-to-owner/architect relationship important? Give some examples of strategies you use to “design to the budget” Do incentives make a difference? Give an example of success when you were involved early (ex: Saved 13 months on AIP Ph2)

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Provide an example of a project difficulty/Lesson Learned How important is Trust / Open Communication throughout the entire team? How do you handle the added risk at early involvement without making contingencies too high? Talk about only estimating the “alternate” – base scope doesn’t even get priced – Eric’s example – this was at 30% design What barriers do you see to early involvement? How can performance/quality be improved when you are involved from the beginning? Audience Questions Questions

REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 Intro the panel Ted to intro. Story about Malaysia Plant, 14% over budget, but payback more than doubled from 3 yrs to 7 yrs due to 8 month delay. Schedule outweighs. 3 main reasons – 1 is unreliable contractors. VE what’s been designed for months – not saving the designers any money Arranged marriage? Designing to a target? Incentives? Eliminate double handling Compare DBB to DB, rearrange design production schedule – “massive time savings” Saved 13 months on AIP Ph2 Education of Owners/Architects Get to the decision maker Promote sub-to-owner/architect relationship Difficulties / Lessons Learned Trust / Open Communication How do you handle the added risk at early involvement without making contingencies too high? Who should carry the contingency? With DBB, picking at low price. The better the estimate, the lesser chance of success for the sub Talk about only estimating the “alternate” – base scope doesn’t even get priced – Eric’s example – this was at 30% design Barriers to early involvement? Audience Questions When you bring a sub on board late, you’ve already assumed that the cost, schedule, and design solution up to that point is correct, 100% correct. Anything less and re-design happens (VE). How can performance/quality be improved when you are involved from the beginning If a contractor is not a good contractor, that won’t change by changing the process – speaks to relationships/trust/etc.