GOES-East Co-Location Operations with BRASILSAT-B1 Kevin T. Work ASRC Aerospace February 11, 2008.

Slides:



Advertisements
Similar presentations
1/15/ A car starts from rest and travel 10s with uniform acceleration 5m/s 2. Find out its final velocity. Here, u=0 m/s t=10s a= 5m/s 2 v=? We.
Advertisements

Zhongxing Telecom Pakistan (Pvt.) Ltd
Terms. 1. Globalization 2. Financing 3. Inputs.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 GOES-12 Eccentricity Control (Co-Location with Brasilsat B1) Richard McIntosh a.i. solutions, Inc. AIAA SOSTC Workshop April 15, 2008.
Module 2 – Monitoring and Evaluation Definitions.
Submitted by: Dr. Carlinda Purcell, Chief Academic Officer Carol Howard, Coordinator Paula Knight, Executive Director, Curriculum & Instruction
Chapter 3: Top-Down Design with Functions Problem Solving & Program Design in C Sixth Edition By Jeri R. Hanly & Elliot B. Koffman.
What causes the commodity price boom? AGRI Green Team Seminar on the Health Check May 15, 2008 AGRI-G1 Agricultural Policy Analysis and Perspectives DG.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Inclusions Regulation Testing Situations Decide if the situation is a violation or not a violation. Cite the page and paragraph number from the document(s)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Points, Vectors, Lines, Spheres and Matrices
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
4/8/14CS161 Spring FFS Recovery: Soft Updates Learning Objectives Explain how to enforce write-ordering without synchronous writes. Identify and.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Testing Workflow Purpose
First Experimental Tests 08/04/20141/18. First Experimental Tests Temperature sensors 08/04/20142/18.
Studies in the Book of Nehemiah. The report (1:1-11) The request (2:1-10) The review (2:11-20) The repairs (3:1-32) Sheep gate (3:1-2) Fish gate (3:3-5)
5-1 Chapter 5 Theory & Problems of Probability & Statistics Murray R. Spiegel Sampling Theory.
Capacity Planning For Products and Services
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Benchmark Series Microsoft Excel 2013 Level 2
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
1 BR- Biennial seminar on SMS 30 October 3 November 2006 Spectrum Management System for Developing Countries (SMS4DC) E-Behdad BDT/FOP/RCU.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
6.4 Best Approximation; Least Squares
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Take out the homework from last night then do, Warm up #1
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Validation of SGP4 and IS-GPS-200D Against GPS Precise Ephemerides
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
© 2007 BST. All rights reserved. Confidential Information. SLU – 1 PDS_139 (0503) L2 Applying Problem- Solving Tools.
Web Time Entry Hours Entry in ESS 04/26/12 1 Banner.
The 14 th Annual Improving Space Operations Workshop April Brasilsat Goes Longitude Sharing Evandro Paiva de Andrade Celestial Mechanics Team.
Presentation transcript:

GOES-East Co-Location Operations with BRASILSAT-B1 Kevin T. Work ASRC Aerospace February 11, 2008

2/13/20142 Background After notification in February 2007 that BRASILSAT-B1 was moving to the same orbital longitude as GOES-East (75 deg W), NOAA and STARONE began coordination. –No frequency interference issues. (ITU) Started routine orbit product exchange: –GOES Weekly Elements, Maneuver Notification, Predicted Post Maneuver Elements. (All pre-existing) –BRASILSAT-B1 Predicted/Post Maneuver Elements. Both sides verified propagation accuracy. Started to develop safe co-location strategy with support from NASA GSFC FDF.

2/13/20143 Eccentricity Control Implementation GOES-East moved retro East/West control maneuvers from Perigee to time determined by external Eccentricity Control maneuver planner. Spreadsheet tool developed to implement the equations of the Eccentricity Control strategy. –Input predicted Kepler elements for burn day to determine average Starting ECC-xy. –Fixed inputs for Natural ECC radius (Rn=.00032), Control ECC radius (Rc=.00025), and ECC control circle offset (Offset-X=0, Y=.00025). –Input maneuver cycle start and stop dates are used along with the ECC radius to determine the Beta angle. –Beta angle used to calculate the Target ECC-xy. –The delta between the Target and Starting ECC-xy is used to determine the maneuver Right Ascension angle and corresponding burn time.

2/13/20144 ECC Control Implementation (cont.) Initial tool development calculated the Natural and Control ECC radius using SRP Area/Mass ratio as input. Equation for Beta experienced problems when maneuver cycles were greater than 11 weeks. –Math error with arcsine of number greater than 1. –Longer maneuver cycles needed around eclipse season. (Constraint - No maneuvers during season) Increasing Control radius from to resolved the issues around long cycles without a negative impact to the ECC Control Strategy. –Also increase offset in Y direction to.00025

2/13/20145 Sample ECC Control Plan

2/13/20146 Timeline Reference February 2007 – Start NOAA/STARONE coordination 3/7/07 – 3/23/07 – BRASILSAT-B1 move to 75 deg W with GOES-East –Evaluate BRASILSAT-B1 entry into GOES-East longitude for any close approaches. None. 5/8/07 – GOES-East EW#25. Normal maneuver at Perigee. Ck COLA. 7/25/07 – GOES-East EW#26. First ECC control maneuver. 10/16/07 - GOES-East EW#27. ECC control. North/South pre-position. 12/4/07 - GOES-East NS#7. Nominal North/South inclination maneuver. –Post maneuver thruster leak anomaly. 12/7/07 - GOES-East thruster leak isolated. 12/11/07 - GOES-East EW#28. Drift control. ECC control. 12/17/07 - GOES-East EW#29. Drift stop. ECC control. 1/29/08 - GOES-East EW#30. ECC control. 4/15/08 - GOES-East EW#31. ECC control.

2/13/20147 Longitude (3/25/07 – 4/15/08) EW#25 EW#26 EW#27 NS#7 EW#28 EW#29 EW#30 Minimum Range at Longitude Crossings: 4/23/ km 12/5/ km 5/24/ km 12/16/ km 7/10/ km 2/10/ km 8/7/ km 3/29/ km 9/28/ km BRASILSAT-B1GOES-12

2/13/20148 Eccentricity (3/25/07 – 4/15/08) BRASILSAT-B1 GOES-12 EW#29 EW#28

2/13/20149 GOES-12 Eccentricity Vector 2006 One point/day. Does not show daily variations. Vector points to orbit perigee. G12 Start 2006 Five EW maneuvers at perigee One NS maneuver

2/13/ North/South Maneuver Plans GOES (I-M series) North/South inclination maneuvers can include East/West control. –Two part maneuvers surrounding the node. Due to East/West maneuver uncertainty during inclination maneuvers, NOAA agreed to perform North/South burns outside the BRASILSAT-B1 control box of /-0.1 deg W. Option to use prior East/West maneuver to pre- position for North/South burn. Evaluate multiple options to determine which is best for Eccentricity Control with minimal mission impact.

2/13/ GOES-East NS#7 Anomaly After a successful North/South maneuver, failed to transition back to normal wheel control. Maintain thruster attitude control for multiple days until fault isolated as leaking thruster valve (2B oxidizer). GOES-East exited the longitude control box. –Anomaly lowered SMA -37 km. –Two East/West maneuvers used to correct Longitude. –No close approaches with BRASILSAT-B1. GOES-East continues to experience venting of the remaining oxidizer in lines. Orbit errors.

2/13/ Sample Prediction Error 0.4 deg Longitude Error by next EW Predictive Definitive

2/13/ Co-Location Monitoring Maneuver plans and post maneuver orbits checked for potential close approaches. Tolerance 5 km. Both parties maintain Eccentricity Control strategy. Periodic check of CelesTrak SOCRATES tool.