Doc.: IEEE 802.15-04/0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal.

Slides:



Advertisements
Similar presentations
November 13, 2003 Glyn Roberts – ST Microelectronics IEEE doc: IEEE pc Submission Project: IEEE P Working Group for Wireless Personal.
Advertisements

Page 1 January 14, 2004 IEEE doc: IEEE pc Glyn Roberts – ST MicroelectronicsSubmission Project: IEEE P Working Group for Wireless.
Doc.: IEEE /340r0 Submission 12Sept2003 John R. Barr (Motorola) Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0513r0 Submission September 2004 Jon Adams, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0095r1 Submission Jan 2005 Gregg Rasor, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
May 2004 Glyn Roberts – ST Microelectronics, Brian Mathews - AbsoluteValue Systems IEEE doc: IEEE PC Submission Publicity Committee /.15.
Doc.: IEEE PC_pc-opening-report Submission Mar 15, 2004 Glyn Roberts, STMicroelectronics, Inc & Brian Mathews (AbsoluteValue Systems)Slide.
July 2004 Glyn Roberts – ST Microelectronics IEEE doc: IEEE Submission Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE r0 Submission July, 2004 Bill Shvodian, Freescale, D. K. Bae SamsungSlide 1 Project: IEEE P Working Group for Wireless Personal.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANS) Submission Title: [A critical view of the proposed compromise – A marketing.
July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission doc: IEEE SGAP3a-02/119r0March 2002 Domenico Porcino, Philips + Gadi Shor, Wisair Slide 1 Project: IEEE P Working Group for Wireless.
September 2004 Roberto Aiello, Staccato Communications Slide 1 doc.: a Submission Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission doc. : IEEE March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /214r1 Submission July 2000 Grant B. Carlson, Eastman Kodak Co. Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /080r0 Submission February 2004 Welborn, MotorolaSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /503r0 Submission September 2004 McCorkle & Welborn, FreescaleSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /357r0 Submission July 2001 Phil Jamieson, Philips SemiconductorsSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE xxx a Submission November 2004 Welborn, FreescaleSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /189r1 Submission July 2004 Jon Adams, Freescale Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
a Slide 1 Michael Mc Laughlin, decaWave Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
September 2004 doc.: IEEE Submission Slide 1 Jack Pardee, INNOV8RS, LLC Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /381r0 Submission July 2004 Peter Johansson (Congruent Software, Inc.)Slide 1 Project: IEEE Wireless Personal Area Networks.
May 2004 Glyn Roberts – ST Microelectronics IEEE doc: IEEE Submission Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE g Submission July 2010 Roberto Aiello, John BuffingtonSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission November 2015 Slide 1Li Qiang, Huawei Technologies Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANS) Submission Title: [MB-OFDM waiver panel] Date Submitted: [March 2005] Revised:
Doc.: IEEE b Submission July 2004 Liang Li, WXZJ Inc Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Submission doc.: IEEE /0339r0 Jul 2004 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Doc.: IEEE /081r0 Submission February 2004 McCorkle, MotorolaSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
doc.: IEEE <doc#>
doc.: IEEE <doc#>
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
doc.: IEEE <doc#>
Submission Title: [WG-TG3 Closing Report Nov03]
Submission Title: [PC Meeting Minutes Mar. 04]
Submission Title: [WG-TG3 Closing Report Nov03]
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [FCC-UWB-certifications-below-1-GHz] Date Submitted:
Submission Title: [May 04 WiMedia Update to Publicity Committee]
Submission Title: [May 04 WiMedia Update to Publicity Committee]
Project: IEEE Wireless Personal Area Networks (WPANs)
Submission Title: [PC Meeting Minutes Nov. 03]
doc.: IEEE <doc#>
Submission Title: [Compromise Proposal] Date Submitted: [12Sept2004]
Submission Title: [PC Meeting Minutes Nov. 03]
平成31年1月 doc.: IEEE /424r1 July 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c motion.
Submission Title: [PC Closing Report January, 2004]
Project: IEEE P WG for Wireless Personal Area Networks (WPANs)
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: WiMedia Liason Report May 06 Date Submitted:
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Conformance PAR Background Date Submitted:
Submission Title: [WG WNG Liaison Report January08]
Submission Title: [Compromise Proposal] Date Submitted: [12Sept2004]
Submission Title: [PC Meeting Closing Report Mar. 04]
<month year> IEEE a <January 2006>
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – UWB Forum Liaison Report]
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year>20 Jan 2006
Submission Title: [UWB Forum Liaison Report]
平成31年5月 doc.: IEEE /424r1 September 2007
<month year> doc.: IEEE / July 2004
<month year> doc.: IEEE <030158r0> <March 2003>
doc.: IEEE <doc#>
Submission Title: TG9ma Agenda for September Meeting
Submission Title: [TG3a Compromise Direction]
12/15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [AWGN Simulation Results] Date Submitted:
Presentation transcript:

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Time to Market Pervasiveness - MultiBand OFDM Products] Date Submitted: [13 September 2004] Source: Roberto Aiello, CEO, Staccato Communications Eric Broockman, CEO, Alereon David Yaish, CEO, Wisair Abstract:[Time to market is a term commonly discussed in developing markets, this presentation defines the true meaning of the term, industry expectations, and when interoperable standards-based (non- proprietary) products will become pervasive.] Notice:This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 2 Outline Definitions Product development timeline Conclusions: no TTM advantage for DS-UWB

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 3 Definitions Time to market –when the proposed technology will be ready for integration Time to market pervasiveness –Time to industry success: Volume & Profitability So What does it take? Time to market –One vendor doesn’t provide market pervasiveness Time to market pervasiveness requires an ecosystem –You need more than just a radio to assure market acceptance WiMedia – Interoperability & testing Wireless USB – Software integrated in operating systems 1394TA – Leverage multi-industry momentum –Broad industry support multiple vendors Multiple implementations Interoperability Price competition –Broad market appeal Designed for PC, CE and mobile markets (& supporting their convergence) Ease of use in all

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 4 Robust design for all target markets: PC, CE and Mobile  Wireless USB 1.0 specification to be published in 2004  Wireless USB Promoter Group announced 2/04  Multi-vendor wireless USB demonstration offered 9/04  Wired USB was 400Mu in 2003, NEC alone forecast 25Mu of W-USB in 2007  1394 Trade Association developing a PAL for the WiMedia platform  1394-TA has defined and published some of most fundamental elements of the PAL  Compliance & Interoperability WG is collaborating with the WiMedia Alliance  Wired 1394 was 100Mu in 2003  WiMedia Alliance is to UWB as WiFi is to  Will publish industry standard convergence layer specification in 2004  Wireless USB Promoter Group adopted WiMedia Alliance convergence layer  1394-TA engaged with the WiMedia Alliance  MB-OFDM PHY is product of extensive peer review by +170 companies Status Standards Organization USB 1394 WiMedia

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 5 Extensive industry support of over 170 member companies; please visit for a full list of companies which include: - Top 10 semiconductor companies (except TSMC; TSMC has invested in a MB-OFDM start-up company) - Many of the leading CE, PC and Mobile Phone companies - Endorsement by the Wireless USB Promoter Group and WiMedia Alliance and engagement with the 1394 Trade Association - Over $100M in 2004 venture capital investment into MB-OFDM start-up companies Broad Industry Support

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 6 Industry readiness High level protocol and application support –Wireless USB –Wireless 1394 –Wireless Video (IP) Multiple suppliers –better quality, lower cost –more choice of solution (package size, integration, power consumption, performance,…) Interoperability Certification authority –supported by the target industries

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 7 Industry timeline PHY Proposal Specs Stable Requirements  PC  CE  Mobile  W-USB  W-1394 Standards & Technology Creation 7/03 2/04 9/04 Q105 Q205 Q405– Q206 … Productization Multi-Vendor Interoperability IC Development IC Samples MAC Sim / Dev C & I Program Components Ecosystem Formation Corporate R&D Technology Demonstration (Intel Developers Forum) Development Platform Business Groups Engaged Commercial Deployment Product Development By the major CE, PC and Mobile Phone companies

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 8 Timeline, presented Sept 2003 Time PHY / MAC Convergence Arch PHY/MAC Interoperability Applications Connection Mgmt 1H 20032H 20031H 20042H 20041H 20052H 2005 Today, a proprietary bare pipe. A real product that won’t get returned? ‘05 Whole Product Proprietary Bare Pipe a Bare Pipe Doc: IEEE /343r1

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 9 Current timeline Q4 ‘05 End – Products on shelves Q2 ‘05 End – Products prototypes Q4 ‘04 Silicon engineering samples Q3 ‘05 Start product certification Plug fests Alereon, Staccato, Wisair timeline No TTM advantage for DS-UWB: -MB-OFDM will have silicon in Q4 ’04 -MB-OFDM will ship next year from multiple interoperable vendors

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 10 DS-UWB TTM inconsistencies July 7, 2000, Martin Rofheart, doc.: IEEE /195r4 Time to market –Sample chipsets 2Q01 –Limited availability 3Q01 –Production quantity 4Q01 July 2003 Matt Welborn, doc.: IEEE /153r9 Production ICs here today Sept 7, 2004, Communications Daily [Freescale] said it hoped to start shipping commercial product in about 6 months Sept, 13, 2004, Freescale press release, Jon Adams: “These milestones underscore the two-year time to market advantage” Products have been announced for 4Q 2001, Q2 2003, and Q2 2005

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 11 Spectrum discrepancy results in lower performance GHz FCC Certification Test Report for Motorola Corporation FCC ID: RUN-XSUWBWDK doc.: IEEE /140r2 System tested is very different from IEEE proposal: Lower performance, lower bit rate, higher power

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 12 Current system doesn’t appear to be low cost, low power Source: FCC Certification Test Report for Motorola Corporation FCC ID: RUN-XSUWBWDK System tested appears to be much higher cost, lower performance, lower bit rate, higher power than current DS-UWB proposal

doc.: IEEE /0548r0 Submission September 2004 Alereon, Staccato Communications, WisairSlide 13 Conclusions Time to market pervasiveness requires not only product availability but –Multiple suppliers –Multiple vendors and their implementations –Total Ecosystem/Support Infrastructure Interoperability and certification Protocol and Application vendors Supporting/peripheral components suppliers no TTM advantage for DS-UWB